← Back
Primarily 2 family with 1 store or office
87-22 JAMAICA AVENUE
QUEENS · Woodhaven · BIN 4184002
💬 Discuss this project
1931Year Built
3Stories
S2Building Class
R6AZoning
3,300 sfGross Floor Area
3Units
0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: HWU HOLDINGS, LLC · 2,190 sf lot · 1.51 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingGeneral
Floor 35p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 1
Cellar9p · 2 filings · 20 docs
Site & exterior1p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HWU HOLDINGS1007/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/26/2020$1.5M—— → —$455/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
FANG ARCHITECT803/16/2022
LEON SKVIRSKY PE105/29/2018
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BUILDING BROTHERS203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
FLUSHING PLUMBING CORPPlumbing207/08/2026
PAUL SIGNSScaffold107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
FANG ARCHITECT5513803/16/2022
Building Lifecycle
All (57)Filed (9)Permit Issued (3)Signed Off (3)Violation (11)Inspection (1)Special Inspection (30)
12/24/2025
Violation issued (ECB, closed)
Construction
12/24/2025
Violation issued (ECB, closed)
Construction
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/23/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2022
Signed off — Alteration
INSTALL (3) GAS BOILERS FOR AN EXISTING MIXED-USE BUILDING
Q00598601-I1
04/25/2022
Signed off — Alteration
REMOVE OIL-TANK& OIL-BOILER, INSTALL NEW BOILER & H.W.H. AT CELLAR. AND NEW GAS STOVE ON 2ND AND 3RD FLOOR
Q00489765-I1
03/17/2022
Special inspection requirement — Heating Systems
DEZHANG FANG
03/17/2022
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
03/17/2022
Special inspection requirement — Maintenance information
DEZHANG FANG
03/17/2022
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
03/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
03/16/2022
Filed — Alteration
INSTALL (3) GAS BOILERS FOR AN EXISTING MIXED-USE BUILDING
Q00598601-P3
03/16/2022
Inspection — Pass-Final Boiler Equipment Inspection
Pass
View inspection ↗
03/16/2022
Special inspection requirement — Heating Systems
DEZHANG FANG
03/16/2022
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
03/16/2022
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
03/16/2022
Special inspection requirement — Maintenance information
DEZHANG FANG
03/16/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
02/12/2022
Permit issued — Boiler Equipment
Q00598601-I1-BE
01/24/2022
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
01/24/2022
Special inspection requirement — Maintenance information
DEZHANG FANG
01/24/2022
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
01/24/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
01/24/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
01/24/2022
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
01/21/2022
Filed — Alteration
REMOVE OIL-TANK& OIL-BOILER, INSTALL NEW BOILER & H.W.H. AT CELLAR. AND NEW GAS STOVE ON 2ND AND 3RD FLOOR
Q00489765-P3
01/21/2022
Filed — Alteration
INSTALL (3) GAS BOILERS FOR AN EXISTING MIXED-USE BUILDING
Q00598601-P2
11/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
11/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
11/10/2021
Special inspection requirement — Heating Systems
DEZHANG FANG
11/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
11/10/2021
Special inspection requirement — Maintenance information
DEZHANG FANG
11/10/2021
Special inspection requirement — Fire-Resistant Penetrations and Joints
DEZHANG FANG
11/10/2021
Special inspection requirement — Energy Code Compliance Inspections
DEZHANG FANG
11/10/2021
Special inspection requirement — HVAC-R and service water piping design and insulation
DEZHANG FANG
11/10/2021
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
11/10/2021
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
11/10/2021
Special inspection requirement — Maintenance information
DEZHANG FANG
10/01/2021
Filed — Alteration
INSTALL (3) GAS BOILERS FOR AN EXISTING MIXED-USE BUILDING
Q00598601-P1
10/01/2021
Special inspection requirement — HVAC-R and service water heating equipment
DEZHANG FANG
10/01/2021
Special inspection requirement — Maintenance information
DEZHANG FANG
10/01/2021
Special inspection requirement — HVAC-R and service water heating system controls
DEZHANG FANG
09/30/2021
Filed — Alteration
INSTALL (3) GAS BOILERS FOR AN EXISTING MIXED-USE BUILDING
Q00598601-I1
09/30/2021
Filed — Alteration
REMOVE OIL-TANK& OIL-BOILER, INSTALL NEW BOILER & H.W.H. AT CELLAR. AND NEW GAS STOVE ON 2ND AND 3RD FLOOR
Q00489765-P2
04/28/2021
Filed — Alteration
REMOVE OIL-TANK& OIL-BOILER, INSTALL NEW BOILER & H.W.H. AT CELLAR. AND NEW GAS STOVE ON 2ND AND 3RD FLOOR
Q00489765-P1
04/19/2021
Permit issued — Plumbing
Q00489765-I1-PL
03/30/2021
Filed — Alteration
REMOVE OIL-TANK& OIL-BOILER, INSTALL NEW BOILER & H.W.H. AT CELLAR. AND NEW GAS STOVE ON 2ND AND 3RD FLOOR
Q00489765-I1
10/23/2018
Signed off — Alteration
INSTALL NON-ILLUMINATED SIGN ON WALL (JL TAX PREP)
Q00044487-I1
09/13/2018
Permit issued — Sign
Q00044487-I1-SG
05/29/2018
Filed — Alteration
INSTALL NON-ILLUMINATED SIGN ON WALL (JL TAX PREP)
Q00044487-I1
08/14/2017
Violation issued (ECB, closed)
Construction
07/27/2016
Violation issued (ECB, closed)
Boilers
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
08/15/1990
Violation issued (ECB, closed)
Boilers
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWBoiler EquipmentSigned-offFLUSHING PLUMBING CORP02/12/2022
DOB NOWPlumbingSigned-offFLUSHING PLUMBING CORP04/19/2021
DOB NOWSignSigned-offPAUL SIGNS, INC09/13/2018
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
03/16/2022Pass-Final Boiler Equipment InspectionPassView ↗
▾Special Inspection Requirements (DOB NOW) — 45
DateRequirementInspectorRole
03/17/2022Heating SystemsDEZHANG FANGspecial
03/17/2022HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
03/17/2022Maintenance informationDEZHANG FANGenergy_progress
03/17/2022HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
03/17/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
03/16/2022Heating SystemsDEZHANG FANGspecial
03/16/2022HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
03/16/2022HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
03/16/2022Maintenance informationDEZHANG FANGenergy_progress
03/16/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
01/24/2022Energy Code Compliance InspectionsDEZHANG FANGprogress
01/24/2022Maintenance informationDEZHANG FANGenergy_progress
01/24/2022HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
01/24/2022HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
01/24/2022Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
01/24/2022HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
11/10/2021HVAC-R and service water heating system controlsDEZHANG FANGenergy_progress
11/10/2021Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
11/10/2021Heating SystemsDEZHANG FANGspecial
11/10/2021HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
11/10/2021Maintenance informationDEZHANG FANGenergy_progress
11/10/2021Fire-Resistant Penetrations and JointsDEZHANG FANGspecial
11/10/2021Energy Code Compliance InspectionsDEZHANG FANGprogress
11/10/2021HVAC-R and service water piping design and insulationDEZHANG FANGenergy_progress
11/10/2021HVAC-R and service water heating equipmentDEZHANG FANGenergy_progress
Latest 25 of 45.
▾Documents — 58 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/29/2026Q00044487-I1Request digital key ↗
08/27/2026Q00489765-P3Request digital key ↗
08/27/2026Q00489765-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Seals & Professional Certifications42
▸DOB NOWProgress Inspector Seal & Signature25
09/23/2026Q00598601-I1Open ↗
09/20/2026Q00598601-P2Open ↗
09/02/2026Q00489765-P3Open ↗
Showing 3 of 25 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00489765-P2Open ↗
08/27/2026Q00489765-P1Open ↗
08/27/2026Q00489765-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026Q00598601-I1Open ↗
09/02/2026Q00489765-P3Open ↗
09/01/2026Q00598601-P2Open ↗
Showing 3 of 8 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/27/2026Q00489765-P2Open ↗
08/27/2026Q00489765-P1Open ↗
08/27/2026Q00489765-I1Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00489765-I1Open ↗
08/13/2026Q00598601-I1Open ↗