← Back
QUEENS
87-34 124 STREET
QUEENS · BIN 4196020
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
0 Open ViolationsFDNY Report ↗
Flood zone X
Locations of Work
StructuralMechanicalPlumbingFire Protection
Roof2p · 2 filings · 5 docs
Bulkhead1p · 1 filing · 4 docs
Floor 41p · 1 filing · 4 docs
Floor 31p · 1 filing · 15 docs
Floor 2
Floor 1
Cellar2p · 2 filings · 19 docs
3 jobs · most recent 12/26/2025
General Wiring
FiledStatusContractorScope
12/26/2025CompleteJOSEPH WEINSTEIN ELECTRIC13 meters, 1 new_meters
05/29/2025CompleteAMBER ELECTL CONTNG INC—
10/17/2024CompleteSNB ELECTRICAL CONTNG CORGeneral Wiring
Building Lifecycle
All (115)Filed (14)Permit Issued (19)Signed Off (11)Violation (13)Inspection (12)Objection (28)Special Inspection (18)
05/11/2026
Violation issued (HPD, closed)
A
07/16/2025
Signed off — Alteration
Q01151925-I1
07/15/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
07/09/2025
Signed off — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Q01232206-I1
06/18/2025
Signed off — Alteration
Curb cut application filed in conjunction with NB app #440648694 and BPP app #440691985. Propose 10'-0" curb cut with 1' 6" splay on 124 STREET 333.42' From JAMAICA AVENUE.
Q00387638-I1
06/17/2025
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
06/02/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/30/2025
Permit issued — Solar
Q01232206-I1-SL
05/29/2025
Filed — Alteration
Installation of PV System on existing rooftop. No changes to Egress or use of occupancy.
Q01232206-I1
05/29/2025
Signed off — Alteration
Q00387643-I1
05/29/2025
Signed off — Alteration
FOUNDATION WORK TYPE FILED IN CONJUNCTION WITH NEW BUILDING APPLICATION # 440648694.
Q00731358-I1
05/29/2025
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
05/28/2025
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
05/28/2025
Special inspection requirement — Final
TOM PETERSEN
05/28/2025
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
05/28/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
05/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
05/21/2025
Permit issued — Curb Cut
Q01151925-I1-CC
05/21/2025
Permit issued — Curb Cut
Q00387638-I1-CC
02/04/2025
Signed off — Alteration
INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING AS PER DRAWING.
Q00387626-I1
12/31/2024
Signed off — Alteration
Q00387636-I1
12/31/2024
Signed off — Alteration
PROPOSE FIRE PROTECTION FOR MULTIPLE DWELLING UNIT RESIDENTIAL BUILDING.
Q00387631-I1
12/09/2024
Filed — Alteration
Q01151925-I1
09/30/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
09/27/2024
Filed — Alteration
Curb cut application filed in conjunction with NB app #440648694 and BPP app #440691985. Propose 10'-0" curb cut with 1' 6" splay on 124 STREET 333.42' From JAMAICA AVENUE.
Q00387638-S1
09/26/2024
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
09/26/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
09/20/2024
Signed off — Alteration
FILING FOR TEMPORARY CONSTRUCTION FENCE
Q00108567-I1
09/20/2024
Signed off — Alteration
Q00619938-I1
08/30/2024
Objection raised — Zoning
08/30/2024
Objection resolved — Addressed
08/30/2024
Objection raised — Scope
08/30/2024
Objection resolved — Addressed
08/30/2024
Objection raised — Scope
08/30/2024
Objection resolved — Addressed
08/30/2024
Objection raised — Structural
08/30/2024
Objection resolved — Addressed
08/15/2024
Permit issued — Plumbing
Q00387626-I1-PL
02/27/2024
Permit issued — Construction Fence
Q00108567-I1-FN
02/20/2024
Violation issued (ECB, closed)
Construction
02/20/2024
Violation issued (ECB, closed)
Unknown
01/17/2024
Signed off — Alteration
PROPOSED INSTALLATION OF PIPE SCAFFOLD FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q00902810-I1
01/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
01/05/2024
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
01/05/2024
Special inspection requirement — HVAC insulation and sealing
MUZAFFAR JAMAL
01/05/2024
Special inspection requirement — HVAC and service water heating equipment
MUZAFFAR JAMAL
01/05/2024
Special inspection requirement — HVAC and service water heating system controls
MUZAFFAR JAMAL
12/30/2023
Objection resolved — Addressed
12/28/2023
Objection raised — Scope
12/20/2023
Filed — Alteration
INSTALL NEW PLUMBING FIXTURES AND RELATED PIPING AS PER DRAWING.
Q00387626-P2
11/21/2023
Special inspection requirement — HVAC and service water heating equipment
MUZAFFAR JAMAL
11/21/2023
Special inspection requirement — HVAC and service water heating system controls
MUZAFFAR JAMAL
11/21/2023
Special inspection requirement — HVAC insulation and sealing
MUZAFFAR JAMAL
11/21/2023
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
11/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
10/25/2023
Permit issued — Sprinklers
Q00387631-I1-EW-SP
10/23/2023
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/23/2023
Inspection — Certified Storm Drainage-ST-Piping-Roughing
Certified
View inspection ↗
10/23/2023
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/23/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
Latest 60 of 115 events.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROYAL KHALSA GENERAL CONSTRUCTION I2507/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TOM PETERSEN ARCHITECT, LLC105/29/2025
D&E BUILD EVERGREEN INC.212/09/2024
ARCHITECTURAL CONCEPT809/27/2024
ARQUITECTURA VARELA207/26/2023
GRACE ENGINEERING PLLC.105/20/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1803/21/2026
METRO DESIGN CONSULTANTS INC403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROYAL KHALSA GENERAL CONSGeneral Contractor2307/08/2026
MBK RESTORATION CORPGeneral Contractor1207/08/2026
JOSEPH WEINSTEIN ELECTRICElectrical403/22/2026
JOSEPH WEINSTEIN ELECTRIC 000796General Contractor303/22/2026
ARCHITECTURAL CONCEPTGeneral Contractor303/22/2026
NYS ESSENTIAL POWER INCGeneral Contractor303/21/2026
ROCK E SMALL PLBG&HTG INCPlumbing207/08/2026
SNB ELECTRICAL CONTNG CORElectrical103/22/2026
PRIME PIPING & HEATING INFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THOMAS PETERSEN ARCHITECT7854105/29/2025
ARCHITECTURAL CONCEPT3642712/20/2023
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offNYS ESSENTIAL POWER INC05/30/2025
DOB NOWCurb CutSigned-offROYAL KHALSA GENERAL CONS05/21/2025
DOB NOWCurb CutSigned-offROYAL KHALSA GENERAL CONS05/21/2025
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC08/15/2024
DOB NOWConstruction FenceSigned-offROYAL KHALSA GENERAL CONS02/27/2024
DOB NOWSprinklersSigned-offA M B MECHANICAL INC10/25/2023
DOB NOWConstruction FenceSigned-offROYAL KHALSA GENERAL CONS09/25/2023
DOB NOWMechanical SystemsSigned-offMBK RESTORATION CORP09/15/2023
DOB NOWPlumbingSigned-offROCK E SMALL PLBG&HTG INC08/07/2023
DOB NOWStructuralSigned-offMBK RESTORATION CORP05/08/2023
DOB NOWFoundationSigned-offMBK RESTORATION CORP05/04/2023
DOB NOWConstruction FenceSigned-offROYAL KHALSA GENERAL CONS03/10/2023
DOB NOWSupport of ExcavationSigned-offMBK RESTORATION CORP03/07/2023
DOB NOWFoundationSigned-offMBK RESTORATION CORP05/26/2022
DOB NOWConstruction FenceSigned-offROYAL KHALSA GENERAL CONS03/16/2022
DOB NOWConstruction FenceSigned-offROYAL KHALSA GENERAL CONS06/03/2021
DOB NOWConstruction FenceSigned-offROYAL KHALSA GENERAL CONS11/16/2020
DOB NOWConstruction FenceSigned-offROYAL KHALSA GENERAL CONS06/04/2019
DOB NOWConstruction FenceSigned-offROYAL KHALSA GENERAL CONS01/07/2019
BIS—ISSUEDMBK RESTORATION CORP09/05/2024
BIS—ISSUEDMBK RESTORATION CORP02/10/2024
BIS—ISSUEDMBK RESTORATION CORP08/18/2023
BIS—ISSUEDMBK RESTORATION CORP12/07/2022
BIS—ISSUEDMBK RESTORATION CORP12/07/2022
BISEQISSUEDPAIK CONSTRUCTION INC12/11/2017
BIS—ISSUEDROYAL KHALSA GENERAL CONS12/11/2017
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
07/15/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/17/2025Pass-Final Curb Cut Non-Directive 14PassView ↗
06/02/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
05/29/2025Fail-Final Curb Cut Non-Directive 14FailView ↗
09/30/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
09/26/2024Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
09/26/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
10/23/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/23/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/23/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/23/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/23/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
05/28/2025Air barrier - visual inspectionTOM PETERSENenergy_progress
05/28/2025FinalTOM PETERSENprogress
05/28/2025Energy Code Compliance InspectionsTOM PETERSENprogress
05/28/2025Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
05/28/2025Fire-Resistant Penetrations and JointsTOM PETERSENspecial
01/05/2024Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
01/05/2024Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
01/05/2024HVAC insulation and sealing MUZAFFAR JAMALenergy_progress
01/05/2024HVAC and service water heating equipment MUZAFFAR JAMALenergy_progress
01/05/2024HVAC and service water heating system controls MUZAFFAR JAMALenergy_progress
11/21/2023HVAC and service water heating equipment MUZAFFAR JAMALenergy_progress
11/21/2023HVAC and service water heating system controls MUZAFFAR JAMALenergy_progress
11/21/2023HVAC insulation and sealing MUZAFFAR JAMALenergy_progress
11/21/2023Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
11/21/2023Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
11/24/2021Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
11/24/2021Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
08/19/2020Sprinkler SystemsMUZAFFAR JAMALspecial
▾Documents — 239 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch7
08/26/2026Q00387638-S1Request digital key ↗
08/26/2026Q00731358-I1Request digital key ↗
08/25/2026Q00619938-I1Request digital key ↗
Showing 3 of 7 on file for this type
▸DOB NOWPlans/Sketch - Plumbing2
08/26/2026Q00387626-I1Request digital key ↗
08/14/2026Q00387626-P2Request digital key ↗
▸DOB NOWPlans/Sketch - Construction Fence1
08/28/2026Q00108567-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/15/2026Q00387638-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Mechanical Systems1
08/26/2026Q00387636-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Structural1
08/26/2026Q00387643-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sprinkler1
08/24/2026Q00387631-I1Request digital key ↗
▸Applications & Permits36
▸BISWORK PERMIT APPLICATION18
02/15/2023440648694Open ↗
02/15/2023440648694Open ↗
02/08/2023440648694Open ↗
Showing 3 of 18 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION14
10/23/2025440648694Open ↗
05/08/2025440648694Open ↗
05/02/2025440648694Open ↗
Showing 3 of 14 on file for this type
▸BISBPP-5 - Authorization to the Department of Transportation3
09/10/2025440691985Open ↗
09/04/2024440691985Open ↗
09/04/2024440691985Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/03/2024440648694Open ↗
▸Zoning, Tax Lot & Property Records9
▸BISTAX LOT: FINAL LOT NUMBER ISSUED4
03/10/2025440648694Open ↗
12/14/2017421416104Open ↗
07/11/2017421416088Open ↗
Showing 3 of 4 on file for this type
▸BISRESTRICTION: RESTRICTIVE DECLARATION2
07/11/2017421416088Open ↗
07/11/2017421416088Open ↗
▸BISPERTINENT ZONING EXHIBITS (ZR 12-10 #ZONING LOT#)1
11/10/2021440648694Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
06/14/2021440648694Open ↗
▸BISVERIFY TAX LOT1
03/10/2025440648694Open ↗
▸Seals & Professional Certifications36
▸DOB NOWDPL-1: Design Professional Seal & Signature14
08/28/2026Q00108567-I1Open ↗
08/26/2026Q00387626-P2Open ↗
08/26/2026Q00387626-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
08/31/2026Q00387631-I1Open ↗
08/26/2026Q00387626-I1Open ↗
08/26/2026Q00387626-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
08/31/2026Q00387631-I1Open ↗
08/26/2026Q00387626-I1Open ↗
08/24/2026Q00387626-P2Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
06/10/2022440648694Open ↗
06/10/2022440648694Open ↗
05/24/2018421634379Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
10/19/2021440691985Open ↗
11/27/2020440648694Open ↗
▸Trade Schedules & Equipment8
▸BISGAS CUT-OFF1
12/14/2017421416104Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
02/14/2025440648694Open ↗
▸BISFIRE ALARM/SIGNAL SYSTEM (FA) SIGNOFF1
02/27/2025440648694Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
02/14/2025440648694Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE1
12/01/2018421634379Open ↗
▸BISSPRINKLER SYSTEMS1
02/14/2025440648694Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
01/08/2026440648694Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
01/08/2026440648694Open ↗
▸Safety & Tenant Protection6
▸BISEXCAVATION OR DEMOLITION: 5-DAY NOTICE2
06/10/2022440648694Open ↗
12/14/2017421416104Open ↗
▸BISSTREET TREE CHECKLIST2
10/20/2021440691985Open ↗
06/14/2021440648694Open ↗
▸BISEXCAVATION - SHEETING, SHORING, AND BRACING1
02/14/2025440648694Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
12/14/2017421416104Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/20/2026Q01232206-I1Open ↗
▸Energy Compliance10
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY3
01/29/2026440648694Open ↗
04/14/2022440648694Open ↗
11/27/2020440648694Open ↗
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026Q00387636-I1Open ↗
08/13/2026Q00387626-I1Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
02/14/2025440648694Open ↗
▸BISINTERIOR LIGHTING POWER1
02/14/2025440648694Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
02/14/2025440648694Open ↗
▸BISFENESTRATION AREAS1
02/14/2025440648694Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
02/14/2025440648694Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: RESPONSIBILITY4
04/22/2022440648694Open ↗
11/04/2021440648694Open ↗
11/04/2021440648694Open ↗
Showing 3 of 4 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
03/12/2025440648694Open ↗
04/15/2022440648694Open ↗
▸BISCONCRETE - CAST-IN-PLACE2
09/22/2025440691985Open ↗
02/14/2025440648694Open ↗
▸BISTR2: CONCRETE FIELD TESTING TECHNICAL REPORT1
11/05/2025440648694Open ↗
▸BISSTRUCTURAL STEEL - DETAILS1
03/12/2025440648694Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
04/22/2022440648694Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
02/14/2025440648694Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
02/14/2025440648694Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
02/14/2025440648694Open ↗
▸BISMASONRY1
02/14/2025440648694Open ↗
▸BISSTRUCTURAL STEEL - HIGH STRENGTH BOLTING1
03/12/2025440648694Open ↗
▸Approvals, Objections & Sign-offs23
▸BISLETTERS - SUPPORTING DOCUMENTATION13
11/05/2025440648694Open ↗
04/01/2025440648694Open ↗
04/01/2025440648694Open ↗
Showing 3 of 13 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE8
10/23/2025440648694Open ↗
05/02/2025440648694Open ↗
03/21/2025440648694Open ↗
Showing 3 of 8 on file for this type
▸BISTAP LETTER - DOM SVC : DEP-DOM1
12/14/2017421416104Open ↗
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01232206-I1Open ↗
▸Cost, Insurance & Ownership5
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE3
02/15/2023440648694Open ↗
02/08/2023440648694Open ↗
06/10/2022440648694Open ↗
▸BISBPP-11 - Affidavit as to Roadway Pavement And/Or Sidewalk and Curb Construction2
09/10/2025440691985Open ↗
06/23/2025440691985Open ↗
▸Filing & Intake Forms17
▸BISBOROUGH INTAKE FORM6
02/15/2023440648694Open ↗
02/08/2023440648694Open ↗
01/20/2023440648694Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION5
11/05/2025440648694Open ↗
05/06/2025440648694Open ↗
01/22/2025440648694Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET3
05/24/2018421634379Open ↗
01/03/2017421416104Open ↗
01/03/2017421416088Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
10/19/2021440691985Open ↗
11/27/2020440648694Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
09/04/2024440691985Open ↗
▸Other Documents21
▸BISBPP - SUPPORTING DOCUMENTATION9
09/10/2025440691985Open ↗
09/10/2025440691985Open ↗
09/10/2025440691985Open ↗
Showing 3 of 9 on file for this type
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
11/01/2017421416104Open ↗
11/01/2017421416104Open ↗
▸BISSupporting Document: Fee Exempt1
11/01/2017421416104Open ↗
▸BISSHUTOFF DAMPERS1
02/14/2025440648694Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
11/27/2020440648694Open ↗
▸BISLOWEST FLOOR ELEVATION1
02/14/2025440648694Open ↗
▸BISBPP: PHOTOS-SIGNED/SEALED BY APPLICANT1
09/04/2024440691985Open ↗
▸BISMAINTENANCE INFORMATION1
02/14/2025440648694Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
02/14/2025440648694Open ↗
▸BISPERMANENT CERTIFICATE1
02/14/2025440648694Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00619938-I1Open ↗
▸DOB NOWWaiver Document1
08/13/2026Q00387638-I1Open ↗