← Back
Two stories - detached, small or mid-size
87-41 252 STREET
QUEENS · BIN 4176450
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R2AZoning
1,216 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,300 sf lot · 0.37 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Roof1p · 1 filing · 20 docs
Floor 32p · 1 filing · 20 docs
Floor 22p · 1 filing · 20 docs
Floor 1
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/29/2018$580K—— → —$477/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARQUITECTURA VARELA712/18/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
CM3 DESIGN STUDIO703/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JP HOME CONSTRUCTION CORPGeneral Contractor407/08/2026
SIGNORE & SONS PLBG CORPPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ALNOUR CONSULTING ENGINEE607312/18/2025
MJE CONSULTING ENGINEERIN8522312/18/2025
Building Lifecycle
All (51)Filed (7)Permit Issued (6)Signed Off (3)Violation (2)Inspection (5)Objection (8)Special Inspection (20)
07/21/2026
Signed off — Alteration
Subsequent plumbing application to remove existing plumbing fixtures on second floor, and to install new plumbing fixtures on second and third floors as shown in plans.
Q01153298-I1
01/20/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
12/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
12/24/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Evodia Ibrahim
12/24/2025
Special inspection requirement — Interior lighting power
Vicente Varela
12/24/2025
Special inspection requirement — Electric vehicle service equipment requirements
Vicente Varela
12/24/2025
Special inspection requirement — Fenestration air leakage
Vicente Varela
12/24/2025
Special inspection requirement — Fenestration areas
Vicente Varela
12/24/2025
Special inspection requirement — Insulation placement and R values
Vicente Varela
12/24/2025
Special inspection requirement — Metering
Vicente Varela
12/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Vicente Varela
12/24/2025
Special inspection requirement — Air barrier - visual inspection
Vicente Varela
12/18/2025
Filed — Alteration
Subsequent plumbing application to remove existing plumbing fixtures on second floor, and to install new plumbing fixtures on second and third floors as shown in plans.
Q01153298-P4
12/12/2025
Signed off — Alteration
Subsequent plumbing application to remove existing plumbing fixtures on second floor, and to install new plumbing fixtures on second and third floors as shown in plans.
Q01153298-S1
12/11/2025
Signed off — Alteration
Subsequent plumbing application to remove existing plumbing fixtures on second floor, and to install new plumbing fixtures on second and third floors as shown in plans.
Q01153298-S2
12/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nouredine Benabdelhak
12/11/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
Evodia Ibrahim
12/11/2025
Special inspection requirement — Interior lighting power
Vicente Varela
12/11/2025
Special inspection requirement — Electric vehicle service equipment requirements
Vicente Varela
12/11/2025
Special inspection requirement — Fenestration air leakage
Vicente Varela
12/11/2025
Special inspection requirement — Metering
Vicente Varela
12/11/2025
Special inspection requirement — Fenestration areas
Vicente Varela
12/11/2025
Special inspection requirement — Insulation placement and R values
Vicente Varela
12/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Vicente Varela
12/11/2025
Special inspection requirement — Air barrier - visual inspection
Vicente Varela
12/04/2025
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
09/04/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
08/11/2025
Filed — Alteration
Subsequent plumbing application to remove existing plumbing fixtures on second floor, and to install new plumbing fixtures on second and third floors as shown in plans.
Q01153298-P3
07/03/2025
Permit issued — Plumbing
Q01153298-S1-PL
06/27/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
06/27/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
06/23/2025
Objection resolved — Addressed
06/18/2025
Objection raised — Cost
06/16/2025
Filed — Alteration
Subsequent plumbing application to remove existing plumbing fixtures on second floor, and to install new plumbing fixtures on second and third floors as shown in plans.
Q01153298-P1
06/16/2025
Filed — Alteration
Subsequent plumbing application to remove existing plumbing fixtures on second floor, and to install new plumbing fixtures on second and third floors as shown in plans.
Q01153298-P2
06/12/2025
Permit issued — Construction Fence
Q01153298-S2-FN
06/12/2025
Permit issued — General Construction
Q01153298-I1-GC
05/30/2025
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/17/2025
Permit issued — Plumbing
Q01153298-S1-PL
04/14/2025
Permit issued — General Construction
Q01153298-I1-GC
04/08/2025
Permit issued — Construction Fence
Q01153298-S2-FN
02/06/2025
Objection resolved — Addressed
02/06/2025
Objection resolved — Addressed
01/17/2025
Objection resolved — Addressed
01/15/2025
Filed — Alteration
Subsequent plumbing application to remove existing plumbing fixtures on second floor, and to install new plumbing fixtures on second and third floors as shown in plans.
Q01153298-S2
01/14/2025
Objection raised — Admin
01/02/2025
Objection raised — Cost
12/31/2024
Objection raised — Other
12/30/2024
Filed — Alteration
Subsequent plumbing application to remove existing plumbing fixtures on second floor, and to install new plumbing fixtures on second and third floors as shown in plans.
Q01153298-S1
12/20/2024
Filed — Alteration
Subsequent plumbing application to remove existing plumbing fixtures on second floor, and to install new plumbing fixtures on second and third floors as shown in plans.
Q01153298-I1
02/01/2017
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP07/03/2025
DOB NOWConstruction FenceSigned-offJP HOME CONSTRUCTION CORP06/12/2025
DOB NOWGeneral ConstructionSigned-offJP HOME CONSTRUCTION CORP06/12/2025
DOB NOWPlumbingSigned-offSIGNORE & SONS PLBG CORP04/17/2025
DOB NOWGeneral ConstructionSigned-offJP HOME CONSTRUCTION CORP04/14/2025
DOB NOWConstruction FenceSigned-offJP HOME CONSTRUCTION CORP04/08/2025
1 project · most recent 12/18/2025
Gas Water/Sanitary
FiledStatusContractorScope
12/18/2025Signed-offSIGNORE & SONS PLBG CORPGas, Water/Sanitary
1 project · most recent 04/17/2025
General Wiring Lighting
FiledStatusContractorScope
04/17/2025Permit IssuedBDS ELECTRIC CORP.General Wiring, Lighting
1 project · most recent 12/18/2025
Fence
FiledStatusContractorScope
12/18/2025Signed-offSIGNORE & SONS PLBG CORPFence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/20/2026Pass-Final General Construction Non-Directive 14PassView ↗
12/04/2025Fail-Final General Construction Non-Directive 14FailView ↗
09/04/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
06/27/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
06/27/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
12/24/2025Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
12/24/2025Structural Stability – Alterations of existing buildingsEvodia Ibrahimspecial
12/24/2025Interior lighting powerVicente Varelaenergy_progress
12/24/2025Electric vehicle service equipment requirementsVicente Varelaenergy_progress
12/24/2025Fenestration air leakageVicente Varelaenergy_progress
12/24/2025Fenestration areasVicente Varelaenergy_progress
12/24/2025Insulation placement and R valuesVicente Varelaenergy_progress
12/24/2025MeteringVicente Varelaenergy_progress
12/24/2025Fenestration and door U-factor and product ratingsVicente Varelaenergy_progress
12/24/2025Air barrier - visual inspectionVicente Varelaenergy_progress
12/11/2025Fire-Resistant Penetrations and JointsNouredine Benabdelhakspecial
12/11/2025Structural Stability – Alterations of existing buildingsEvodia Ibrahimspecial
12/11/2025Interior lighting powerVicente Varelaenergy_progress
12/11/2025Electric vehicle service equipment requirementsVicente Varelaenergy_progress
12/11/2025Fenestration air leakageVicente Varelaenergy_progress
12/11/2025MeteringVicente Varelaenergy_progress
12/11/2025Fenestration areasVicente Varelaenergy_progress
12/11/2025Insulation placement and R valuesVicente Varelaenergy_progress
12/11/2025Fenestration and door U-factor and product ratingsVicente Varelaenergy_progress
12/11/2025Air barrier - visual inspectionVicente Varelaenergy_progress
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/21/2026Q01153298-P4Request digital key ↗
08/21/2026Q01153298-P3Request digital key ↗
08/21/2026Q01153298-P2Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records3
▸DOB NOWZD1: DOB Zoning Diagram3
08/13/2026Q01153298-I1Open ↗
08/13/2026Q01153298-P4Open ↗
08/13/2026Q01153298-P1Open ↗
▸Seals & Professional Certifications27
▸DOB NOWProgress Inspector Seal & Signature16
08/26/2026Q01153298-I1Open ↗
08/26/2026Q01153298-I1Open ↗
08/26/2026Q01153298-I1Open ↗
Showing 3 of 16 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/21/2026Q01153298-P3Open ↗
08/21/2026Q01153298-P2Open ↗
08/21/2026Q01153298-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/26/2026Q01153298-I1Open ↗
08/26/2026Q01153298-I1Open ↗
08/23/2026Q01153298-P4Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026Q01153298-P3Open ↗
08/21/2026Q01153298-P2Open ↗
08/21/2026Q01153298-P1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents9
▸DOB NOWSite Survey: Initial3
08/13/2026Q01153298-I1Open ↗
08/13/2026Q01153298-P4Open ↗
08/13/2026Q01153298-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone3
08/13/2026Q01153298-P4Open ↗
08/13/2026Q01153298-I1Open ↗
08/13/2026Q01153298-P1Open ↗
▸DOB NOWPlot Diagram3
08/13/2026Q01153298-P4Open ↗
08/13/2026Q01153298-P1Open ↗
08/13/2026Q01153298-I1Open ↗