← Back
BuildNYC
Public elementary, junior or senior high
P.S. Q86
87-41 PARSONS BOULEVARD · BIN 4438678
💬 Discuss this project
1971Year Built
4Stories
W1Building Class
R5Zoning
384,249 sfGross Floor Area
0Units
LL97 Covered37 Active Violations 0 unresolved · 37 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC Department of Education · 242,356 sf lot · 1.59 FAR built · Flood zone X
Locations of Work
StructuralEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofRetaining walls and inspections1 filing · 20 docs
Floor 3Retaining walls and inspections1 filing · 20 docs
Floor 2P.S. 86Q2 filings · 17 docs
Floor 1Retaining walls and inspections1 filing · 20 docs
CellarRetaining walls and inspections1 filing · 20 docs
Site & exteriorP.S. 86-queensUnder Construction20p · 3 filings · 15 docs
Filed — no permit issuedP.S. 086 - Queens7p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC School Construction3010/13/2026
NYC Department of Education303/22/2026
BOE103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Orsar Engineering209/29/2026
Ricardo Zurita Architecture & Plann109/17/2026
AK Consulting Services409/15/2026
Stantec210/31/2025
Geri Goldman Engineering208/11/2025
Yu & Associates208/11/2025
Stantec Architecture108/05/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Yarks NYCScaffold309/16/2026
Anco Electl ContctngElectrical103/22/2026
Laser Electrical ContractingElectrical103/22/2026
Murray StanleyElectrical103/21/2026
Five Star ElectricElectrical103/21/2026
Sortino JosephElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Universal Testing and Ins400608/15/2026
Yu & Associates1478108/11/2025
Building Lifecycle
All (113)Filed (14)Permit Issued (3)Violation (60)Objection (22)Special Inspection (14)
10/09/2026
Objection raised — Other
10/09/2026
Objection raised — Other
10/09/2026
Objection raised — Other
09/29/2026
Filed — Alteration
installing a new water fountain
Q01454732-S1
09/29/2026
Filed — Alteration
installing a new water fountain
Q01454732-S2
09/28/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/28/2026
Special inspection requirement — HVAC-R and service water heating equipment
09/28/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/24/2026
Objection raised — Other
09/24/2026
Special inspection requirement — Final
09/24/2026
Special inspection requirement — Mechanical Systems
09/17/2026
Filed — Alteration
installing a new water fountain
Q01454732-I1
09/15/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION SHORING FOR EXCAVATION IN CONJUNCTION WITH JOB # Q01263129, Q01422165 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01422172-I1
09/15/2026
Permit issued — Supported Scaffold
Q01422170-I1-SF
09/09/2026
Special inspection requirement — Structural Steel - Welding
09/09/2026
Special inspection requirement — Post-installed Anchors
09/08/2026
Permit issued — Construction Fence
Q01422165-I1-FN
09/08/2026
Permit issued — Sidewalk Shed
Q01422166-I1-SH
08/28/2026
Objection resolved — Addressed
08/26/2026
Objection resolved — Resolved
08/26/2026
Objection resolved — Open
08/21/2026
Objection raised — Other
08/21/2026
Objection raised — Other
08/20/2026
Objection raised — Other
08/15/2026
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLD FOR PS 86Q AT 87-41 PARSONS BOULEVARD, QUEENS IN CONJUNCTION WITH ALT# Q01263129, Q01422165, Q01422166 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01422170-I1
08/15/2026
Filed — Alteration
INSTALLATION OF TEMPORARY CONSTRUCTION FENCE FOR PS 86Q AT 87-41 PARSONS BOULEVARD, QUEENS IN CONJUNCTION WITH ALT# Q01263129, Q01422166, Q01422170 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01422165-I1
08/15/2026
Filed — Alteration
INSTALLATION OF NEW SIDEWALK SHED FOR PS 86Q AT 87-41 PARSONS BOULEVARD, QUEENS IN CONJUNCTION WITH ALT# Q01263129, Q01422165, Q01422170 AS INDICATED ON PLANS. THERE WILL BE NO CHANGE IN THE USE, EGRESS, OR OCCUPANCY UNDER THIS APPLICATION.
Q01422166-I1
06/24/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
06/24/2026
Special inspection requirement — Post-installed Anchors
04/27/2026
Violation issued (ECB, open)
Construction
04/27/2026
Violation issued (ECB, open)
Construction
02/05/2026
Objection resolved — Addressed
11/26/2025
Violation issued (FDNY_ORDER, closed)
11/26/2025
Violation issued (FDNY_ORDER, closed)
11/14/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
11/14/2025
Objection resolved — Addressed
10/31/2025
Filed — Alteration
Retaining walls and inspections only. Related structural work will be covered under S5 structural subsequent application
Q01263129-S6
10/23/2025
Objection resolved — Addressed
10/15/2025
Special inspection requirement — Concrete - Cast-In-Place
NELSON LOPEZ
10/03/2025
Objection raised — Other
09/29/2025
Objection resolved — Addressed
09/29/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
MAX POLICASTRO
09/26/2025
Filed — Alteration
Retaining walls and inspections only. Related structural work will be covered under S5 structural subsequent application
Q01263129-S5
09/15/2025
Violation issued (FDNY_ORDER, closed)
09/15/2025
Violation issued (FDNY_ORDER, closed)
09/12/2025
Special inspection requirement — Final
NELSON LOPEZ
09/12/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NELSON LOPEZ
08/21/2025
Objection raised — Other
08/21/2025
Objection raised — Other
08/21/2025
Objection raised — Other
08/21/2025
Objection raised — Admin
08/21/2025
Objection raised — Other
08/11/2025
Filed — Alteration
Retaining walls and inspections only. Related structural work will be covered under S5 structural subsequent application
Q01263129-S1
08/11/2025
Filed — Alteration
Retaining walls and inspections only. Related structural work will be covered under S5 structural subsequent application
Q01263129-S2
08/11/2025
Filed — Alteration
Retaining walls and inspections only. Related structural work will be covered under S5 structural subsequent application
Q01263129-S4
08/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NELSON LOPEZ
08/08/2025
Filed — Alteration
Retaining walls and inspections only. Related structural work will be covered under S5 structural subsequent application
Q01263129-S3
08/05/2025
Filed — Alteration
Retaining walls and inspections only. Related structural work will be covered under S5 structural subsequent application
Q01263129-I1
06/05/2025
Violation issued (ECB, closed)
Construction
Latest 60 of 113 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSupported ScaffoldPermit IssuedYarks NYC09/15/2026
DOB NOWConstruction FencePermit IssuedYarks NYC09/08/2026
DOB NOWSidewalk ShedPermit IssuedYarks NYC09/08/2026
BISOTISSUEDFritch Construction Co04/03/2009
BISOTISSUEDFritch Construction Co08/07/2007
BISEQISSUEDRockledge Scaffold01/11/2006
BISEQISSUEDRockledge Scaffold01/11/2006
BISPLISSUEDVarsity Plumbing and Heating09/08/2005
BISEQISSUEDAdam's European Contracting08/19/2005
BISEQISSUEDAdam's European Contracting08/19/2005
BISOTISSUEDExcel Construction01/22/1998
BISPLISSUEDI.M.P. Plumbing & Heating01/22/1998
2 projects · most recent 09/29/2026
Others Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
09/29/2026——Others
Other
— GOVERNALE 11,520 BTU · Radiant ×1
10/31/2025——Air Conditioning Systems
Cooling
Mitsubishi Electric PEAD-A18AA7 424 CFM · Vrf Indoor ×1
SUZ-KA18NLHZ-U2 424 CFM · Condensing Unit ×1
2 projects · most recent 09/29/2026
Water/Sanitary Storm
FiledStatusContractorScope
09/29/2026——Water/Sanitary
10/31/2025——Storm, Water/Sanitary
11 projects · most recent 10/08/2026
General Wiring
FiledStatusContractorScope
10/08/2026Permit IssuedKay Electric—
09/02/2026Permit IssuedLit Mode Electrical Contg—
11/12/2025CompleteAM NY ElectricGeneral Wiring
04/23/2025CancelledA.T.J. Electrical CoGeneral Wiring
04/03/2024CompleteAnco Electl Contctng—
02/08/2024CompleteAnco Electl Contctng—
11/04/2022CompleteCharan Electrical Enterp's—
08/21/2022Permit IssuedNortheast Electrical ContractorsGeneral Wiring
01/26/2022CompleteF.I. ElectricalGeneral Wiring
12/29/2021CompleteF.I. ElectricalGeneral Wiring
01/18/2020CompleteLaser Electrical Contracting—
2 projects · most recent 09/15/2026
Concrete Masonry
FiledStatusContractorScope
09/15/2026——1 scope_items
10/31/2025——Concrete, Masonry
3 projects · most recent 08/15/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
08/15/2026Permit IssuedYarks NYCSidewalk Shed
08/15/2026Permit IssuedYarks NYCScaffold
08/15/2026Permit IssuedYarks NYCFence
▾Special Inspection Requirements (DOB NOW) — 14
DateRequirementInspectorRole
09/28/2026HVAC-R and service water heating system controls—energy_progress
09/28/2026HVAC-R and service water heating equipment—energy_progress
09/28/2026HVAC-R and service water piping design and insulation—energy_progress
09/24/2026Final—progress
09/24/2026Mechanical Systems—special
09/09/2026Structural Steel - Welding—special
09/09/2026Post-installed Anchors—special
06/24/2026Excavations - Sheeting, Shoring, and Bracing—special
06/24/2026Post-installed Anchors—special
10/15/2025Concrete - Cast-In-PlaceNELSON LOPEZspecial
09/29/2025Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention FacilitiesMAX POLICASTROspecial
09/12/2025FinalNELSON LOPEZprogress
09/12/2025Structural Stability – Alterations of existing buildingsNELSON LOPEZspecial
08/11/2025Fire-Resistant Penetrations and JointsNELSON LOPEZspecial
▾Tenants in the building
TenantSpaceFloorsRenovation projects
P.S. 86QEducationFloor 2
Project Q01454732 Alteration · Objections · 09/17/2026
P.S. 086 - QueensEducation—
Project Q01422172 Alteration · Objections · 09/15/2026
P.S. 86-queensEducation—
Project Q01422165 Alteration · Permit Entire · 08/15/2026
Project Q01422166 Alteration · Permit Entire · 08/15/2026
Project Q01422170 Alteration · Permit Entire · 08/15/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 83 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
10/04/2026Q01454732-S2Request digital key ↗
10/04/2026Q01454732-I1Request digital key ↗
10/04/2026Q01454732-S1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications18
▸DOB NOWDPL-1: Design Professional Seal & Signature14
10/04/2026Q01454732-I1Open ↗
10/04/2026Q01454732-S1Open ↗
10/04/2026Q01454732-S2Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature3
08/26/2026Q01263129-S2Open ↗
08/25/2026Q01263129-S4Open ↗
08/22/2026Q01263129-S5Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/22/2026Q01263129-S5Open ↗
▸Safety & Tenant Protection3
▸DOB NOWNYCSCA - Approved Site Safety Plans3
08/16/2026Q01422165-I1Open ↗
08/16/2026Q01422170-I1Open ↗
08/16/2026Q01422166-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q01263129-S3Open ↗
▸DOB NOWSOIL REPORT1
08/13/2026Q01263129-S3Open ↗
▸Approvals, Objections & Sign-offs31
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter14
10/04/2026Q01454732-I1Open ↗
10/04/2026Q01454732-S2Open ↗
10/04/2026Q01454732-S1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)14
10/04/2026Q01454732-S2Open ↗
10/04/2026Q01454732-S1Open ↗
10/04/2026Q01454732-I1Open ↗
Showing 3 of 14 on file for this type
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)3
10/04/2026Q01454732-I1Open ↗
10/04/2026Q01454732-S2Open ↗
10/04/2026Q01454732-S1Open ↗
▸Other Documents15
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal13
10/04/2026Q01454732-I1Open ↗
10/04/2026Q01454732-S2Open ↗
10/04/2026Q01454732-S1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProof of Historic Building1
08/13/2026Q01263129-I1Open ↗
▸DOB NOWNYCSCA Exhibit 21
08/13/2026Q01263129-I1Open ↗