← Back
Elevator apt, semi-fireproof with stores
The Fifty7
150-02 HILLSIDE AVENUE · BIN 4624141
💬 Discuss this project
2022Year Built
7Stories
D7Building Class
C4-4DZoning
50,438 sfGross Floor Area
61Units
LL97 Covered0 Open Violations
Elevator apt, semi-fireproof with stores · Owner of record: HILLSIDE REALTY HOLDING LLC · 11,735 sf lot · 4.3 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingGeneral
Floor 536p · 1 filing · 20 docs
Floor 436p · 1 filing · 20 docs
Floor 337p · 1 filing · 20 docs
Floor 242p · 2 filings · 20 docs
Floor 141p · 1 filing · 20 docs
Cellar44p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
HILLSIDE REALTY HOLDING6507/08/2026
RELIABLE ENTERPRISES1604/09/2026
PRIME CONSTRUCTION USA203/22/2026
SUPREME BUILDERS303/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/24/2022$6.0M—Private party → HILLSIDE REALTY HOLDING LLC$119/sf building
02/20/2020$5.0M—TRUST U/A SIXTH OF LWT OF THOMAS NEMET → Private party— not available
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
MUNICIPAL BUILDING CONSULTANTS403/21/2026
MICHAEL KANG ARCHITECT P C2403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
SUPREME BUILDERS CORPGeneral Contractor707/08/2026
BRUCHE MECHANICAL NY LLCFire Protection607/08/2026
PLBG P & H INCPlumbing507/08/2026
PRIME CONSTRUCTION USAGeneral Contractor407/08/2026
RELIABLE ENTERPRISES INCGeneral Contractor304/09/2026
PLBG P HPlumbing203/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
METRIC CONSULTING AND INS1803112/11/2025
MEP INSPECTIONS, INC1102312/04/2025
REGIONAL TESTING CORP.3941509/15/2025
Building Lifecycle
All (187)Filed (27)Permit Issued (20)Signed Off (11)Violation (7)Inspection (12)Objection (80)Special Inspection (30)
07/15/2026
Signed off — New Building
Proposed 7-story mix-used building
Q00665096-S3
07/15/2026
Signed off — New Building
Proposed 7-story mix-used building
Q00665096-S7
07/15/2026
Signed off — New Building
Proposed 7-story mix-used building
Q00665096-S2
06/19/2026
Signed off — New Building
Proposed 7-story mix-used building
Q00665096-S1
06/08/2026
Permit issued — Plumbing
Q00665096-S2-PL
06/04/2026
Permit issued — Standpipe
Q00665096-S7-EW-SD
06/04/2026
Permit issued — Standpipe
Q00665096-S7-EW-SD
06/04/2026
Permit issued — Standpipe
Q00665096-S3-EW-SP
03/18/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
12/15/2025
Objection resolved — Addressed
12/13/2025
Objection raised — Scope
12/11/2025
Filed — Alteration
STRUCTURAL SCOPE IN CONJUNCTION WITH THE FILING FOR INTERIOR FIT OUT FOR A COMMUNITY FACILITY PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01311113-S1
12/04/2025
Filed — Alteration
Q01311327-I1
12/04/2025
Filed — Alteration
STRUCTURAL SCOPE IN CONJUNCTION WITH THE FILING FOR INTERIOR FIT OUT FOR A COMMUNITY FACILITY PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01311113-I1
12/04/2025
Filed — Alteration
MECHANICAL SCOPE IN CONJUNCTION WITH THE FILING FOR INTERIOR FIT OUT FOR A COMMUNITY FACILITY PER PLANS FILED HEREWITH. NO CHANGE IN USE, EGRESS, OR OCCUPANCY.
Q01311285-I1
10/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
10/30/2025
Special inspection requirement — Final
Nicolas Crosetto
10/30/2025
Special inspection requirement — Final
Nicolas Crosetto
10/30/2025
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
10/30/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
10/30/2025
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
10/30/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nicolas Crosetto
09/15/2025
Filed — New Building
Proposed 7-story mix-used building
Q00665096-A2
09/11/2025
Special inspection requirement — Protection of exposed foundation insulation
Paul Raymond
09/11/2025
Special inspection requirement — Insulation placement and R values
Paul Raymond
09/11/2025
Special inspection requirement — Maintenance information
Paul Raymond
09/11/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Paul Raymond
09/11/2025
Special inspection requirement — Fenestration areas
Paul Raymond
09/11/2025
Special inspection requirement — Metering
Paul Raymond
09/11/2025
Special inspection requirement — Interior lighting power
Paul Raymond
09/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Paul Raymond
09/11/2025
Special inspection requirement — Fire-Resistance Rated Construction
Paul Raymond
09/11/2025
Special inspection requirement — Fenestration air leakage
Paul Raymond
09/11/2025
Special inspection requirement — Lighting controls
Paul Raymond
09/11/2025
Special inspection requirement — Lighting in dwelling units
Paul Raymond
09/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
09/11/2025
Special inspection requirement — Wall Panels, Curtain Walls, and Veneers
Paul Raymond
09/11/2025
Special inspection requirement — Air barrier continuity plan testing
Paul Raymond
09/11/2025
Special inspection requirement — Electrical motors and elevators
Paul Raymond
09/11/2025
Special inspection requirement — Air barrier - visual inspection
Paul Raymond
09/11/2025
Special inspection requirement — Vestibules
Paul Raymond
09/11/2025
Special inspection requirement — Exterior lighting power
Paul Raymond
08/05/2025
Signed off — New Building
Proposed 7-story mix-used building
Q00665096-S5
08/05/2025
Signed off — New Building
Proposed 7-story mix-used building
Q00665096-S6
05/12/2025
Inspection — Certified Sprinkler (SP) - Booster Pump Test
Certified
View inspection ↗
05/05/2025
Inspection — Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve Test
Certified
View inspection ↗
04/29/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
04/29/2025
Inspection — Certified StandPipe-SD-Fixtures-Finish-SD
Certified
View inspection ↗
04/15/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
Paul Raymond
04/15/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Paul Raymond
04/15/2025
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
Paul Raymond
04/14/2025
Permit issued — Standpipe
Q00665096-S7-EW-SD
04/10/2025
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00822656-I1
04/10/2025
Signed off — Alteration
INSTALLATION OF TEMPORARY NEEDLE BEAM AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00830501-I1
04/10/2025
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED AS PER PLANS. LIVE LOAD 300 LBS PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
Q00806841-I1
04/07/2025
Filed — New Building
Proposed 7-story mix-used building
Q00665096-A1
03/18/2025
Filed — New Building
Proposed 7-story mix-used building
Q00665096-P8
03/18/2025
Filed — New Building
Proposed 7-story mix-used building
Q00665096-P9
02/25/2025
Signed off — New Building
Proposed 7-story mix-used building
Q00665096-S4
Latest 60 of 187 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offPLBG P & H INC06/08/2026
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC06/04/2026
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC06/04/2026
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC06/04/2026
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC04/14/2025
DOB NOWMechanical SystemsSigned-offPRIME CONSTRUCTION USA05/15/2024
DOB NOWGeneral ConstructionPermit IssuedPRIME CONSTRUCTION USA02/08/2024
DOB NOWStructuralSigned-offSUPREME BUILDERS CORP10/12/2023
DOB NOWGeneral ConstructionPermit IssuedSUPREME BUILDERS CORP09/29/2023
DOB NOWPlumbingSigned-offPLBG P & H INC09/12/2023
DOB NOWConstruction FenceSigned-offSUPREME BUILDERS CORP05/19/2023
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC03/28/2023
DOB NOWStandpipeSigned-offBRUCHE MECHANICAL NY LLC03/28/2023
DOB NOWProtection and Mechanical MethodsSigned-offRELIABLE ENTERPRISES INC02/17/2023
DOB NOWSupported ScaffoldSigned-offRELIABLE ENTERPRISES INC02/15/2023
DOB NOWSidewalk ShedSigned-offRELIABLE ENTERPRISES INC01/05/2023
DOB NOWGeneral ConstructionPermit IssuedSUPREME BUILDERS CORP10/24/2022
DOB NOWFoundationSigned-offSUPREME BUILDERS CORP06/07/2022
DOB NOWSupport of ExcavationSigned-offSUPREME BUILDERS CORP06/03/2022
DOB NOWConstruction FenceSigned-offSUPREME BUILDERS CORP05/10/2022
2 projects · most recent 12/04/2025
Heating and Air Conditioning Systems Air Conditioning Systems Heating Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/04/2025——Heating and Air Conditioning Systems—
09/15/2025Signed-offPRIME CONSTRUCTION USAAir Conditioning Systems, Heating Systems, Ventilation Systems
Cooling
Daikin RXTQ36TBVJUA, RXSQ24TBVJUA, (All serial numbers start with E00 + 4 digits): E00(5052-3781-3995-4934-2576-5557-3242-3034-4695-1089-4935-4040-5051-2547-1073-2646-5616-3774-3035-3242-2548- 36,000 BTU · Vrf Outdoor ×60
RXTQ36TBVJUA 120,000 BTU · Vrf Outdoor ×13
Lg LW1817IVSM 18,000 BTU · Ptac ×1
Heating
Indeeco WLI SERIES 934U02000V 5,110 BTU · Electric Heater ×8
WLI SERIES 934U02000C 6,820 BTU · Electric Heater ×7
EXPLOSION-PROOF CONVENTOR 5,110 BTU · Electric Heater ×1
Berner ALC08-1042E 19,108 BTU · Air Curtain ×1
Lg LW1221HRSM 11,200 BTU · Ptac ×1
Ventilation
Greenheck CUBE-099-4 550 CFM · Kitchen Exhaust ×3
ERV-10-20L-VG 650 CFM · Erv ×3
AX-47-160-0633-A15 4,800 CFM · Exhaust Fan ×1
CUBE-100-3 1,000 CFM · Kitchen Exhaust ×1
ERV-10-20H-VG 950 CFM · Erv ×1
ERV-20-15L 1,000 CFM · Erv ×1
SP-B110 100 CFM · Exhaust Fan ×1
Sp-b200 200 CFM · Exhaust Fan ×1
USF-08 300 CFM · Kitchen Exhaust ×1
USF-10 550 CFM · Exhaust Fan ×1
erv-10-20h-vg 850 CFM · Erv ×1
sq-80 200 CFM · Exhaust Fan ×1
1 project · most recent 09/15/2025
Sprinkler System
FiledStatusContractorScope
09/15/2025Signed-offPLBG P & H INCSprinkler System
1 project · most recent 09/15/2025
Gas Storm Water/Sanitary
FiledStatusContractorScope
09/15/2025Signed-offPLBG P & H INCGas, Storm, Water/Sanitary
3 projects · most recent 03/24/2025
General Wiring
FiledStatusContractorScope
03/24/2025CompleteJUN SAFETY ELECTRICAL INCGeneral Wiring
05/09/2023CompleteKWONG MING ELECTRIC INC—
01/10/2023CompleteRICHARD NEU—
2 projects · most recent 12/11/2025
Steel Concrete
FiledStatusContractorScope
12/11/2025——Steel
09/15/2025Signed-offPLBG P & H INCConcrete
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
03/18/2026Pass-Final CND-Occupancy InspectionPassView ↗
05/12/2025Certified Sprinkler (SP) - Booster Pump TestCertifiedView ↗
05/05/2025Certified Sprinkler-Dry Pipe Valve (SP)-Dry Pipe Valve TestCertifiedView ↗
04/29/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
04/29/2025Certified StandPipe-SD-Fixtures-Finish-SDCertifiedView ↗
07/20/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/20/2024Certified StandPipe-SD-Piping-Hydrostatic TestCertifiedView ↗
07/19/2024Pass-Final CND-Occupancy InspectionPassView ↗
10/12/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/12/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
10/12/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/12/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 111
DateRequirementInspectorRole
10/30/2025Fire-Resistance Rated ConstructionNicolas Crosettoprogress
10/30/2025Energy Code Compliance InspectionsNicolas Crosettoprogress
10/30/2025FinalNicolas Crosettoprogress
10/30/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
10/30/2025Fire-Resistant Penetrations and JointsNicolas Crosettospecial
10/30/2025Mechanical SystemsNicolas Crosettospecial
10/30/2025Energy Code Compliance InspectionsNicolas Crosettoprogress
10/30/2025FinalNicolas Crosettoprogress
09/11/2025Air barrier - visual inspectionPaul Raymondenergy_progress
09/11/2025VestibulesPaul Raymondenergy_progress
09/11/2025Fenestration and door U-factor and product ratingsPaul Raymondenergy_progress
09/11/2025Electrical motors and elevatorsPaul Raymondenergy_progress
09/11/2025Interior lighting powerPaul Raymondenergy_progress
09/11/2025Fenestration areasPaul Raymondenergy_progress
09/11/2025MeteringPaul Raymondenergy_progress
09/11/2025Protection of exposed foundation insulationPaul Raymondenergy_progress
09/11/2025Insulation placement and R valuesPaul Raymondenergy_progress
09/11/2025Exterior lighting powerPaul Raymondenergy_progress
09/11/2025Fenestration air leakagePaul Raymondenergy_progress
09/11/2025Lighting controlsPaul Raymondenergy_progress
09/11/2025Maintenance informationPaul Raymondenergy_progress
09/11/2025Fire-Resistant Penetrations and JointsPaul Raymondspecial
09/11/2025Wall Panels, Curtain Walls, and VeneersPaul Raymondspecial
09/11/2025Energy Code Compliance InspectionsPaul Raymondprogress
09/11/2025Fire-Resistance Rated ConstructionPaul Raymondprogress
Latest 25 of 111.
▾Documents — 257 on file (BIS + DOB NOW)
▸Plans & Drawings27
▸DOB NOWPlans/Sketch27
08/26/2026Q00665096-S4Request digital key ↗
08/26/2026Q00665096-S7Request digital key ↗
08/26/2026Q00665096-P5Request digital key ↗
Showing 3 of 27 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION1
06/10/2022440708762Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
06/10/2022440708762Open ↗
▸Zoning, Tax Lot & Property Records12
▸DOB NOWZD1: DOB Zoning Diagram5
08/26/2026Q00665096-P5Open ↗
08/26/2026Q00665096-P6Open ↗
08/26/2026Q00665096-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWZoning Exhibit form (1-5)5
08/26/2026Q00665096-P5Open ↗
08/26/2026Q00665096-P6Open ↗
08/26/2026Q00665096-P7Open ↗
Showing 3 of 5 on file for this type
▸BISEXISTING DRIVEWAY EASEMENT AGREEMENT1
05/11/2023440708762Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Seals & Professional Certifications138
▸DOB NOWProgress Inspector Seal & Signature74
09/27/2026Q00665096-S5Open ↗
09/27/2026Q00665096-S5Open ↗
09/02/2026Q00665096-S1Open ↗
Showing 3 of 74 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature35
09/27/2026Q00665096-S5Open ↗
09/27/2026Q00665096-S5Open ↗
09/27/2026Q00665096-S5Open ↗
Showing 3 of 35 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature27
08/26/2026Q00665096-I1Open ↗
08/26/2026Q00665096-S2Open ↗
08/26/2026Q00665096-S3Open ↗
Showing 3 of 27 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/10/2022440708762Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/10/2022440708762Open ↗
▸Trade Schedules & Equipment6
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)5
08/26/2026Q00665096-P5Open ↗
08/26/2026Q00665096-P6Open ↗
08/26/2026Q00665096-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStandpipe Alarms Drawings1
08/26/2026Q00665096-I1—
▸Safety & Tenant Protection11
▸DOB NOWStreet Tree Checklist5
08/26/2026Q00665096-P5Open ↗
08/26/2026Q00665096-P6Open ↗
08/26/2026Q00665096-P7Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWStreet Tree Sign Off2
08/26/2026Q00665096-I1Open ↗
08/13/2026Q00665096-I1Open ↗
▸BISBPP: STREET TREES SITE PLAN1
05/11/2023440708762Open ↗
▸BISSTREET TREE CHECKLIST1
05/11/2023440708762Open ↗
▸DOB NOWStreet Trees Site Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸Environmental & Asbestos18
▸DOB NOWOER: Notice to Proceed11
08/26/2026Q00665096-P5Open ↗
08/26/2026Q00665096-P6Open ↗
08/26/2026Q00665096-P7Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWOER: Notice of Satisfaction6
08/26/2026Q00665096-I1Open ↗
08/15/2026Q00665096-S1Open ↗
08/14/2026Q00665096-S2Open ↗
Showing 3 of 6 on file for this type
▸BISENVIRONMENTAL RESTRICTIONS - OER NOTICE TO PROCEED1
06/10/2022440708762Open ↗
▸Energy Compliance3
▸DOB NOWPreliminary Commissioning Report Certification2
08/15/2026Q00665096-S1Open ↗
08/14/2026Q00665096-S2Open ↗
▸DOB NOWEN2: As Built Energy Analysis1
08/26/2026Q00665096-I1Open ↗
▸Approvals, Objections & Sign-offs2
▸BISTRANSIT AUTHORITY/MTA/PANYNJ APPROVAL1
05/11/2023440708762Open ↗
▸BISDOT APPROVAL APEX CORNER PED-RAMP IMPROVEMENT1
05/11/2023440708762Open ↗
▸Filing & Intake Forms3
▸BISEFILING JOB APPLICATION COVER SHEET1
06/10/2022440708762Open ↗
▸BISADDITIONAL INFORMATION1
05/11/2023440708762Open ↗
▸BISBPP: CHECKLIST IN LIEU OF PLANS-ALT31
06/10/2022440708762Open ↗
▸Other Documents35
▸BISBPP - SUPPORTING DOCUMENTATION10
06/10/2022440708762Open ↗
06/10/2022440708762Open ↗
06/10/2022440708762Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWProperty Ownership Certification7
08/26/2026Q00665096-P5Open ↗
08/26/2026Q00665096-P6Open ↗
08/26/2026Q00665096-P7Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone5
08/26/2026Q00665096-I1Open ↗
08/26/2026Q00665096-P6Open ↗
08/26/2026Q00665096-P5Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWSite Survey: Initial5
08/26/2026Q00665096-P5Open ↗
08/26/2026Q00665096-P6Open ↗
08/26/2026Q00665096-P7Open ↗
Showing 3 of 5 on file for this type
▸BISENCROACHMENT ONTO SIDEWALK: DOT REVOCABLE CONSENT1
05/11/2023440708762Open ↗
▸BISBPP: TOPOGRAPHIC SURVEY1
05/11/2023440708762Open ↗
▸BISBIKE RACK FOR 1 PARKING SPACE ON SIDEWALK1
05/11/2023440708762Open ↗
▸BISDOB RECORD FOR EXISTING CC WITH PLANS1
05/11/2023440708762Open ↗
▸BISBPP-DOT: SIDEWALK ENCROACHMENT1
05/11/2023440708762Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q00665096-S4Open ↗
▸DOB NOWFinal Survey1
On file, but not among the 200 most recently loaded documents for this source.
Showing 0 of 1 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
08/13/2026Q00665096-I1Open ↗