← Back
Three families
87 BEADEL STREET
BROOKLYN · BIN 3069886
💬 Discuss this project
1930Year Built
3Stories
C0Building Class
M1-1Zoning
2,200 sfGross Floor Area
3Units
Rent Stabilized2 Open Violations ▸FDNY Report ↗
Three families · Owner of record: TOWNHOUSE RENTAL, L.L.C. · 2,000 sf lot · 1.1 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
93 ATLANTIC AVENUE LLC1303/22/2026
FREESTONE PROPERTY GROUP303/22/2026
TOWNHOUSE RENTAL, LLC203/22/2026
KAZI CONSTRUCTION103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/13/2023$2.7M—271 BLEECKER STREET LLC → TOWNHOUSE RENTAL II, L.L.C.$1,227/sf building
04/11/2022$1.4M—Private party → 271 BLEECKER STREET LLC$636/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LANGAN ENGINEERING104/12/2024
SOTIR ASSOCIATES411/29/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WALTER T GORMAN PE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AWT ENVIRONMENTAL SVCS INGeneral Contractor303/21/2026
KAZI CONSTRUCTION CORPGeneral Contractor303/21/2026
GREEN POWER ELECTRIC CORPElectrical103/22/2026
SUPERIOR PLUMBING & HEATINGPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WALTER T. GORMAN, P.E., P268104/12/2024
ENGINEERING CONSULTING SE2050104/26/2022
Building Lifecycle
All (24)Filed (5)Permit Issued (3)Signed Off (3)Violation (7)Inspection (2)Special Inspection (4)
01/22/2025
Signed off — Alteration
Propose installation a Vapor Mitigation System. No change to use, egress or occupancy.
B01021426-I1
04/25/2024
Permit issued — General Construction
B01021426-I1-GC
04/12/2024
Filed — Alteration
Propose installation a Vapor Mitigation System. No change to use, egress or occupancy.
B01021426-I1
03/18/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Walter Gorman
03/18/2024
Special inspection requirement — Final
Jessica Friscia
03/21/2023
Violation issued (HPD, closed)
A
01/05/2023
Signed off — Alteration
INTERIOR RENOVATIONS OF EXISTING 3-FAMILY BUILDING. PLUMBING WORK FILED UNDER APP #B00723879
B00723606-I1
01/05/2023
Signed off — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC APP #B00723606
B00723879-I1
12/12/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/29/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC APP #B00723606
B00723879-P2
11/29/2022
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
11/10/2022
Violation issued (HPD, closed)
I
08/05/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
07/27/2022
Permit issued — Plumbing
B00723879-I1-PL
07/22/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC APP #B00723606
B00723879-P1
07/11/2022
Special inspection requirement — Energy Code Compliance Inspections
PAUL MARINO
04/28/2022
Permit issued — General Construction
B00723606-I1-GC
04/26/2022
Filed — Alteration
INTERIOR RENOVATIONS OF EXISTING 3-FAMILY BUILDING. PLUMBING WORK FILED UNDER APP #B00723879
B00723606-I1
04/26/2022
Filed — Alteration
PLUMBING WORK IN CONJUNCTION WITH INTERIOR RENOVATIONS FILED UNDER GC APP #B00723606
B00723879-I1
02/23/2022
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
A
04/07/2021
Violation issued (HPD, closed)
I
10/29/2019
Violation issued (HPD, closed)
I
11/20/2017
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offAWT ENVIRONMENTAL SVCS IN04/25/2024
DOB NOWPlumbingSigned-offSUPERIOR PLUMBING & HEATI07/27/2022
DOB NOWGeneral ConstructionSigned-offKAZI CONSTRUCTION CORP04/28/2022
1 project · most recent 12/19/2022
FiledStatusContractorScope
12/19/2022CompleteGREEN POWER ELECTRIC CORP4 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
12/12/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/05/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 4
DateRequirementInspectorRole
03/18/2024Fire-Resistant Penetrations and JointsWalter Gormanspecial
03/18/2024FinalJessica Frisciaprogress
11/29/2022Energy Code Compliance InspectionsPAUL MARINOprogress
07/11/2022Energy Code Compliance InspectionsPAUL MARINOprogress
▾Documents — 20 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/29/2026B00723879-P2Request digital key ↗
08/29/2026B00723879-P1Request digital key ↗
08/29/2026B00723879-I1Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications9
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/29/2026B00723879-I1Open ↗
08/29/2026B00723879-P1Open ↗
08/29/2026B00723879-P2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026B00723879-I1Open ↗
08/31/2026B00723879-P1Open ↗
08/23/2026B01021426-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/23/2026B01021426-I1Open ↗
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/29/2026B00723879-P1Open ↗
08/29/2026B00723879-I1Open ↗
08/29/2026B00723879-P2Open ↗
Showing 3 of 5 on file for this type
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/29/2026B00723606-I1Open ↗