← Back
Two stories - detached, small or mid-size
87 CLOISTER PLACE
STATEN ISLAND · BIN 5052423
💬 Discuss this project
1931Year Built
1.67Stories
A1Building Class
R3XZoning
2,469 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 3,900 sf lot · 0.63 FAR built · Flood zone X
Locations of Work
ArchitectureGeneral
Roof2p · 1 filing · 10 docs
Floor 21p · 1 filing · 10 docs
Floor 11p · 1 filing · 10 docs
Cellar1p · 2 filings · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE804/15/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
THINK DESIGN ARCHITECTURE203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
AL DIBIASI BUILDERS LLCGeneral Contractor407/08/2026
CATELLO ELEC'L CONT., INCElectrical203/22/2026
MPC PLUMBING & HEATING INCPlumbing207/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
THINK DESIGN ARCHITECTURA683101/11/2022
Building Lifecycle
All (85)Filed (8)Permit Issued (4)Signed Off (2)Inspection (5)Objection (36)Special Inspection (30)
12/20/2024
Signed off — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION OF THE CELLAR LEVEL. NO CHANGE IN BULK OR USE. FILED IN CONJUNCTION WITH DOB NOW #S00520720
S00649822-S1
04/15/2024
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION OF THE CELLAR LEVEL. NO CHANGE IN BULK OR USE. FILED IN CONJUNCTION WITH DOB NOW #S00520720
S00649822-P3
01/25/2024
Permit issued — Plumbing
S00649822-S1-PL
08/24/2023
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
02/27/2023
Signed off — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION OF THE CELLAR LEVEL. NO CHANGE IN BULK OR USE. FILED IN CONJUNCTION WITH DOB NOW #S00520720
S00649822-I1
02/24/2023
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/31/2023
Permit issued — General Construction
S00649822-I1-GC
11/15/2022
Permit issued — General Construction
S00649822-I1-GC
10/20/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
10/20/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/23/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
09/16/2022
Permit issued — Plumbing
S00649822-S1-PL
07/05/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Frank Martarella III
07/05/2022
Special inspection requirement — Energy Code Compliance Inspections
Frank Martarella III
07/05/2022
Special inspection requirement — Fire-Resistance Rated Construction
Frank Martarella III
07/05/2022
Special inspection requirement — Final
Frank Martarella III
06/29/2022
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION OF THE CELLAR LEVEL. NO CHANGE IN BULK OR USE. FILED IN CONJUNCTION WITH DOB NOW #S00520720
S00649822-P1
06/29/2022
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION OF THE CELLAR LEVEL. NO CHANGE IN BULK OR USE. FILED IN CONJUNCTION WITH DOB NOW #S00520720
S00649822-P2
06/28/2022
Special inspection requirement — Fire-Resistance Rated Construction
06/28/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/28/2022
Special inspection requirement — Energy Code Compliance Inspections
06/28/2022
Special inspection requirement — Final
01/11/2022
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION OF THE CELLAR LEVEL. NO CHANGE IN BULK OR USE. FILED IN CONJUNCTION WITH DOB NOW #S00520720
S00649822-S1
01/11/2022
Filed — Alteration
APPLICATION IS FILED FOR THE INTERIOR RENOVATION OF THE CELLAR LEVEL. NO CHANGE IN BULK OR USE. FILED IN CONJUNCTION WITH DOB NOW #S00520720
S00649822-I1
07/02/2021
Objection raised — Scope
07/02/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Addressed
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Addressed
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Addressed
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Addressed
06/23/2021
Objection raised — Energy
06/23/2021
Objection resolved — Resolved
Latest 60 of 85 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN01/25/2024
DOB NOWGeneral ConstructionSigned-offAL DIBIASI BUILDERS LLC01/31/2023
DOB NOWGeneral ConstructionSigned-offAL DIBIASI BUILDERS LLC11/15/2022
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN09/16/2022
1 project · most recent 05/27/2021
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/27/2021——Air Conditioning Systems
Cooling
Rheem 6024ST 1,200 CFM ×1
RA166RA 1,200 CFM ×1
1 project · most recent 05/27/2021
Gas Water/Sanitary
FiledStatusContractorScope
05/27/2021——Gas, Water/Sanitary
1 project · most recent 03/09/2023
General Wiring
FiledStatusContractorScope
03/09/2023CompleteCATELLO ELEC'L CONT., INCGeneral Wiring
1 project · most recent 05/27/2021
Wood
FiledStatusContractorScope
05/27/2021——Wood
1 project · most recent 05/11/2021
Fence
FiledStatusContractorScope
05/11/2021——Fence
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
08/24/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
02/24/2023Pass-Final General Construction Non-Directive 14PassView ↗
10/20/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
10/20/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/23/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 33
DateRequirementInspectorRole
07/05/2022Fire-Resistant Penetrations and JointsFrank Martarella IIIspecial
07/05/2022Energy Code Compliance InspectionsFrank Martarella IIIprogress
07/05/2022Fire-Resistance Rated ConstructionFrank Martarella IIIprogress
07/05/2022FinalFrank Martarella IIIprogress
06/28/2022Fire-Resistance Rated Construction—progress
06/28/2022Fire-Resistant Penetrations and Joints—special
06/28/2022Energy Code Compliance Inspections—progress
06/28/2022Final—progress
05/27/2021Fire-Resistant Penetrations and Joints—special
05/27/2021Energy Code Compliance Inspections—progress
05/27/2021HVAC-R and service water piping design and insulation—energy_progress
05/27/2021Maintenance information—energy_progress
05/12/2021Fire-Resistance Rated Construction—progress
05/12/2021HVAC-R and service water heating equipment—energy_progress
05/12/2021Air barrier - visual inspection—energy_progress
05/12/2021Insulation placement and R values—energy_progress
05/12/2021HVAC-R and service water heating system controls—energy_progress
05/12/2021Fenestration and door U-factor and product ratings—energy_progress
05/12/2021HVAC-R and service water piping design and insulation—energy_progress
05/12/2021Duct leakage testing, insulation and design—energy_progress
05/12/2021Maintenance information—energy_progress
05/12/2021Fenestration air leakage—energy_progress
05/12/2021Fenestration areas—energy_progress
05/12/2021Permanent certificate—energy_progress
05/12/2021Fireplaces—energy_progress
Latest 25 of 33.
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/25/2026S00519069-I1Request digital key ↗
08/24/2026S00649822-P3Request digital key ↗
08/24/2026S00649822-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits4
▸BISBPP-5 - Authorization to the Department of Transportation1
03/14/2022540212633Open ↗
▸BISPLAN / WORK APPROVAL APPLICATION1
01/24/2022540212633Open ↗
▸BISBPP-16 - Application for waiver of curb alignment and/or sidewalk and curb1
01/24/2022540212633Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/24/2022540212633Open ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026S00520720-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026S00520720-I1Open ↗
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/24/2026S00649822-P3Open ↗
08/24/2026S00649822-I1Open ↗
08/24/2026S00649822-S1Open ↗
Showing 3 of 8 on file for this type
▸BISAPPLICANT OWNER SIGNATURE1
01/24/2022540212633Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
01/24/2022540212633Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/17/2026S00649822-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
09/17/2026S00649822-I1Open ↗
▸Trade Schedules & Equipment1
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)1
08/13/2026S00520720-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/24/2026S00649822-I1Open ↗
08/24/2026S00649822-P3Open ↗
08/24/2026S00649822-P2Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports1
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/24/2022540212633Open ↗
▸Approvals, Objections & Sign-offs1
▸BISBPP-8 - Request Items for Builders Pavement Plan Signoff1
03/14/2022540212633Open ↗
▸Filing & Intake Forms1
▸BISEFILING JOB APPLICATION COVER SHEET1
01/24/2022540212633Open ↗
▸Other Documents2
▸BISBPP - DOT Builders Pavement Unit Waiver Request Form1
03/01/2022540212633Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone1
08/13/2026S00520720-I1Open ↗