← Back
BuildNYC
Two family frame
87 RIDGECREST AVENUE
STATEN ISLAND · BIN 5174725
💬 Discuss this project
2022Year Built
2Stories
B2Building Class
R3AZoning
3,253 sfGross Floor Area
2Units
Two family frame · Owner of record: Longriver Management · 7,483 sf lot · 0.43 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1p · 1 filing · 20 docs
Floor 214p · 3 filings · 20 docs
Floor 140p · 3 filings · 20 docs
Basement2p · 2 filings · 20 docs
Sub-Basement10p · 2 filings · 14 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Lobue & Valenziano905/01/2024
William Montague Engineering211/23/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
LO Bue Valenziano AIA1803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maximum ContractingGeneral Contractor1007/08/2026
Premier PL, Heating & MechanicalPlumbing307/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SRA Planning & Expediting5677611/23/2023
Building Lifecycle
05/17/2024
Signed off — New Building
CONSTRUCT 3-STORY DETACHED TWO FAMILY RESIDENCE.
S00600742-S1
05/16/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/08/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/06/2024
Signed off — Alteration
PROPOSED 1-1/2" DOMESTIC WITH SP TAKE OFF
S00705533-I1
05/06/2024
Permit issued — Curb Cut
S00600742-S1-CC
65 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offMaximum Contracting05/06/2024
DOB NOWPlumbingSigned-offPremier PL, Heating & Mechanical03/19/2024
DOB NOWPlumbingSigned-offPremier PL, Heating & Mechanical02/15/2024
DOB NOWEarth WorkPermit IssuedMaximum Contracting09/15/2023
DOB NOWEarth WorkPermit IssuedMaximum Contracting09/07/2022
DOB NOWPlumbingSigned-offPremier PL, Heating & Mechanical08/01/2022
DOB NOWStructuralPermit IssuedMaximum Contracting03/14/2022
1 project · most recent 04/07/2024
General Wiring
FiledStatusContractorScope
04/07/2024CompleteA. J. Caruso Electrical IGeneral Wiring
1 project · most recent 05/01/2024
Steel Wood
FiledStatusContractorScope
05/01/2024Signed-offMaximum ContractingSteel, Wood
▾Field Inspections (DOB CAP) — 11
DateTypeResultReport
05/16/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/08/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/22/2024Certified Sprinkler (PL)-SP-Fixtures (PL)-FinishCertifiedView ↗
03/19/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
02/16/2024Certified Sprinkler (PL)-Sprinkler-HydroCertifiedView ↗
02/16/2024Certified Sprinkler (PL) - SP - RoughingCertifiedView ↗
11/01/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
11/01/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/23/2022Certified Storm Drainage-ST-Fixtures-FinishCertifiedView ↗
08/22/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
08/10/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 48
DateRequirementInspectorRole
11/24/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
11/18/2023Electric vehicle service equipment requirementsWILLIAM MONTAGUEenergy_progress
11/18/2023Concrete - Cast-In-PlaceWILLIAM MONTAGUEspecial
11/18/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
11/18/2023Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
11/18/2023Structural Steel - DetailsWILLIAM MONTAGUEspecial
11/18/2023Subgrade InspectionsWILLIAM MONTAGUEspecial
11/18/2023Subsurface Investigations (Borings/Test Pits)WILLIAM MONTAGUEspecial
11/18/2023Energy Code Compliance InspectionsWILLIAM MONTAGUEprogress
11/18/2023FinalWILLIAM MONTAGUEprogress
11/18/2023Fire-Resistance Rated ConstructionWILLIAM MONTAGUEprogress
11/18/2023Footing and FoundationWILLIAM MONTAGUEprogress
11/18/2023Structural Wood FrameWILLIAM MONTAGUEprogress
11/18/2023Fenestration air leakageWILLIAM MONTAGUEenergy_progress
11/18/2023Fenestration and door U-factor and product ratingsWILLIAM MONTAGUEenergy_progress
11/18/2023Fenestration areasWILLIAM MONTAGUEenergy_progress
11/18/2023Maintenance informationWILLIAM MONTAGUEenergy_progress
11/18/2023Air barrier - visual inspectionWILLIAM MONTAGUEenergy_progress
11/18/2023HVAC-R and service water piping design and insulationWILLIAM MONTAGUEenergy_progress
11/18/2023Interior lighting powerWILLIAM MONTAGUEenergy_progress
11/18/2023Insulation placement and R valuesWILLIAM MONTAGUEenergy_progress
11/18/2023MeteringWILLIAM MONTAGUEenergy_progress
11/18/2023Permanent certificateWILLIAM MONTAGUEenergy_progress
11/18/2023Air barrier — testing WILLIAM MONTAGUEenergy_progress
09/25/2023Fire-Resistant Penetrations and JointsWILLIAM MONTAGUEspecial
Latest 25 of 48.
78 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account