← Back
Walk-up cooperative
87 ST MARKS PLACE
MANHATTAN · BIN 1005892
💬 Discuss this project
1940Year Built
4Stories
C6Building Class
R7AZoning
15,000 sfGross Floor Area
25Units
Rent Stabilized5 Open Violations ▸
Walk-up cooperative · Owner of record: ST. MARKS OWNERS CORP. · 5,630 sf lot · 2.66 FAR built · Flood zone X
Locations of Work
Architecture
Roof1p · 1 filing · 12 docs
Sub-Basement3p · 1 filing · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
SAINT MARKS OWNERS1907/08/2026
ST. MARKS OWNERS CORP.403/22/2026
87 ST MARKS OWNERS CORP103/22/2026
OWNER OF 97 ST MARKS PL.103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROJAS AP703/18/2026
ASHRAF CORP309/03/2025
NEW PRACTICE STUDIO LLC201/24/2025
MARIN ARCHITECTS, P.C.204/14/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
WM ARCH403/21/2026
CANAS SOLUTIONS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BTR INNOVATIVE BUILDERS IGeneral Contractor507/08/2026
HAPPY HOUSE CONSTRUCTIONGeneral Contractor303/21/2026
ANDAMIO SCAFFOLDING LLCGeneral Contractor204/09/2026
JOHN FITZGERALD PLBG &HTGPlumbing107/08/2026
JAG INTERIORS & CONTRACT*General Contractor107/08/2026
A&H EXPRESS PLBG&HTG CORPPlumbing107/08/2026
EBM PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROJAS AP5772405/09/2025
URBAN INTEGRATIONS LLC7993105/09/2025
NEW PRACTICE STUDIO LLC9102101/24/2025
STUDIO NYANDAK ARCHITECTU8378106/29/2023
Building Lifecycle
All (93)Filed (14)Permit Issued (12)Signed Off (8)Violation (24)Inspection (6)Objection (10)Special Inspection (19)
07/31/2026
Signed off — Alteration
INTERIOR RENOVATION OF APT 1E INCLUDING NEW FINISHES, NEW PLUMBING FIXTURES AND LIGHTING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01068368-S1
04/29/2026
Violation issued (HPD, closed)
A
04/10/2026
Signed off — Alteration
M01177365-I1
04/07/2026
Signed off — Alteration
INTERIOR RENOVATION OF APT 1E INCLUDING NEW FINISHES, NEW PLUMBING FIXTURES AND LIGHTING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01068368-I1
04/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/18/2026
Filed — Alteration
INTERIOR RENOVATION OF APT 1E INCLUDING NEW FINISHES, NEW PLUMBING FIXTURES AND LIGHTING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01068368-P2
03/03/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
02/26/2026
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
01/20/2026
Permit issued — Plumbing
M01068368-S1-PL
01/06/2026
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01257560-I1
01/06/2026
Signed off — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01257565-I1
11/14/2025
Permit issued — General Construction
M01068368-I1-GC
11/10/2025
Signed off — Alteration
INTERIOR RENOVATION ON APARTMENT 4A ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW FLOOR AREA PROPOSED UNDER THIS APPLICATION.
M01166487-I1
11/10/2025
Signed off — Alteration
INTERIOR RENOVATION ON APARTMENT 4A ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW FLOOR AREA PROPOSED UNDER THIS APPLICATION.
M01166487-S1
10/16/2025
Permit issued — General Construction
M01177365-I1-GC
09/19/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
09/19/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
09/03/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01257560-P1
07/21/2025
Permit issued — Sidewalk Shed
M01257560-I1-SH
07/21/2025
Permit issued — Supported Scaffold
M01257565-I1-SF
07/20/2025
Filed — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
M01257560-I1
07/20/2025
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
M01257565-I1
06/18/2025
Permit issued — General Construction
M01177365-I1-GC
05/09/2025
Filed — Alteration
M01177365-I1
05/02/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/12/2025
Permit issued — Plumbing
M01166487-S1-PL
03/04/2025
Permit issued — General Construction
M01166487-I1-GC
02/13/2025
Objection resolved — Addressed
01/30/2025
Objection raised — Plumbing
01/24/2025
Filed — Alteration
INTERIOR RENOVATION ON APARTMENT 4A ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW FLOOR AREA PROPOSED UNDER THIS APPLICATION.
M01166487-I1
01/24/2025
Filed — Alteration
INTERIOR RENOVATION ON APARTMENT 4A ONLY. NO CHANGE IN USE, EGRESS OR OCCUPANCY. NO NEW FLOOR AREA PROPOSED UNDER THIS APPLICATION.
M01166487-S1
01/24/2025
Permit issued — Plumbing
M01068368-S1-PL
01/23/2025
Special inspection requirement — Fire-Resistance Rated Construction
Nianlai Zhong
01/23/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
Nianlai Zhong
01/23/2025
Special inspection requirement — HVAC-R and service water heating equipment
Nianlai Zhong
01/23/2025
Special inspection requirement — Lighting in dwelling units
Nianlai Zhong
01/23/2025
Special inspection requirement — Post-installed Anchors
Nianlai Zhong
01/23/2025
Special inspection requirement — Final
Nianlai Zhong
01/23/2025
Special inspection requirement — Energy Code Compliance Inspections
Nianlai Zhong
01/23/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nianlai Zhong
12/03/2024
Signed off — Alteration
REPAIRS TO EXTERIOR FACADES ON THE REAR OF BUILDING. REPAIRS TO REAR SETBACK ROOFS AND PARAPETS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00859940-I1
10/24/2024
Permit issued — General Construction
M01068368-I1-GC
08/29/2024
Filed — Alteration
INTERIOR RENOVATION OF APT 1E INCLUDING NEW FINISHES, NEW PLUMBING FIXTURES AND LIGHTING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01068368-P1
07/02/2024
Filed — Alteration
INTERIOR RENOVATION OF APT 1E INCLUDING NEW FINISHES, NEW PLUMBING FIXTURES AND LIGHTING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01068368-S1
07/02/2024
Filed — Alteration
INTERIOR RENOVATION OF APT 1E INCLUDING NEW FINISHES, NEW PLUMBING FIXTURES AND LIGHTING FIXTURES. NO CHANGE TO USE, EGRESS OR OCCUPANCY.
M01068368-I1
06/24/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Deborah Rojas De Leon
06/24/2024
Special inspection requirement — Energy Code Compliance Inspections
Deborah Rojas De Leon
06/18/2024
Special inspection requirement — Final
Deborah Rojas De Leon
06/14/2024
Special inspection requirement — Tenant Protection Plan Compliance
TENZIN NYANDAK
06/14/2024
Special inspection requirement — Masonry
Deborah Rojas De Leon
06/14/2024
Special inspection requirement — Energy Code Compliance Inspections
Deborah Rojas De Leon
06/14/2024
Special inspection requirement — Final
Deborah Rojas De Leon
06/03/2024
Objection resolved — Addressed
06/03/2024
Objection resolved — Addressed
05/29/2024
Objection raised — Scope
05/29/2024
Objection raised — Energy
05/17/2024
Filed — Alteration
REPAIRS TO EXTERIOR FACADES ON THE REAR OF BUILDING. REPAIRS TO REAR SETBACK ROOFS AND PARAPETS. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
M00859940-P1
05/15/2024
Special inspection requirement — Masonry
Deborah Rojas De Leon
05/15/2024
Special inspection requirement — Tenant Protection Plan Compliance
05/15/2024
Special inspection requirement — Energy Code Compliance Inspections
Deborah Rojas De Leon
Latest 60 of 93 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offEBM PLUMBING CORP01/20/2026
DOB NOWGeneral ConstructionSigned-offBTR INNOVATIVE BUILDERS I11/14/2025
DOB NOWGeneral ConstructionSigned-offBTR INNOVATIVE BUILDERS I10/16/2025
DOB NOWSidewalk ShedSigned-offANDAMIO SCAFFOLDING LLC07/21/2025
DOB NOWSupported ScaffoldSigned-offANDAMIO SCAFFOLDING LLC07/21/2025
DOB NOWGeneral ConstructionSigned-offBTR INNOVATIVE BUILDERS I06/18/2025
DOB NOWPlumbingSigned-offJOHN FITZGERALD PLBG &HTG03/12/2025
DOB NOWGeneral ConstructionSigned-offHAPPY HOUSE CONSTRUCTION03/04/2025
DOB NOWPlumbingSigned-offA&H EXPRESS PLBG&HTG CORP01/24/2025
DOB NOWGeneral ConstructionSigned-offBTR INNOVATIVE BUILDERS I10/24/2024
DOB NOWGeneral ConstructionSigned-offBTR INNOVATIVE BUILDERS I09/14/2023
DOB NOWGeneral ConstructionPermit IssuedJAG INTERIORS & CONTRACT*08/30/2022
BISBLISSUEDEMPIRE STATE FUEL CORP03/12/2007
BISPLISSUEDPERFECT PLB & HTG10/03/2000
BISOTISSUEDZ P CONSTRUCTION OOC06/28/2000
BISPLISSUEDMAGOR PLUMBING & HEATING01/12/2000
BISMHISSUEDPIOTR_KOWALSKI COSTRUCTION12/22/1999
2 projects · most recent 03/18/2026
Gas Water/Sanitary
FiledStatusContractorScope
03/18/2026Signed-offEBM PLUMBING CORPGas, Water/Sanitary
04/14/2022——Gas, Water/Sanitary
4 projects · most recent 02/17/2026
General Wiring
FiledStatusContractorScope
02/17/2026CompleteRAL-BAR ELECTRIC INC—
12/10/2025CompleteKJK ELECTRIC INCGeneral Wiring
07/22/2025CompleteBOROWIDE ELECT'L CONTR'S—
03/06/2025CompleteW 8 ELECTRIC CORPGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
04/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
03/03/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
02/26/2026Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
09/19/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/02/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 19
DateRequirementInspectorRole
01/23/2025Fire-Resistance Rated ConstructionNianlai Zhongprogress
01/23/2025Fenestration and door U-factor and product ratingsNianlai Zhongenergy_progress
01/23/2025HVAC-R and service water heating equipmentNianlai Zhongenergy_progress
01/23/2025Lighting in dwelling unitsNianlai Zhongenergy_progress
01/23/2025Post-installed AnchorsNianlai Zhongspecial
01/23/2025FinalNianlai Zhongprogress
01/23/2025Energy Code Compliance InspectionsNianlai Zhongprogress
01/23/2025Fire-Resistant Penetrations and JointsNianlai Zhongspecial
06/24/2024Fire-Resistant Penetrations and JointsDeborah Rojas De Leonspecial
06/24/2024Energy Code Compliance InspectionsDeborah Rojas De Leonprogress
06/18/2024FinalDeborah Rojas De Leonprogress
06/14/2024Tenant Protection Plan ComplianceTENZIN NYANDAKspecial
06/14/2024MasonryDeborah Rojas De Leonspecial
06/14/2024Energy Code Compliance InspectionsDeborah Rojas De Leonprogress
06/14/2024FinalDeborah Rojas De Leonprogress
05/15/2024MasonryDeborah Rojas De Leonspecial
05/15/2024Tenant Protection Plan Compliance—special
05/15/2024Energy Code Compliance InspectionsDeborah Rojas De Leonprogress
05/15/2024FinalDeborah Rojas De Leonprogress
▾Documents — 55 on file (BIS + DOB NOW)
▸Plans & Drawings14
▸DOB NOWPlans/Sketch14
09/02/2026M00710937-I1Request digital key ↗
09/02/2026M00710948-I1Request digital key ↗
08/25/2026M01166487-S1Request digital key ↗
Showing 3 of 14 on file for this type
▸Seals & Professional Certifications33
▸DOB NOWDPL-1: Design Professional Seal & Signature15
09/02/2026M00710937-I1Open ↗
09/02/2026M00710948-I1Open ↗
08/27/2026M00859940-I1Open ↗
Showing 3 of 15 on file for this type
▸DOB NOWProgress Inspector Seal & Signature12
09/23/2026M00859940-I1Open ↗
09/23/2026M00859940-I1Open ↗
08/31/2026M01166487-I1Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature6
09/23/2026M00859940-I1Open ↗
09/23/2026M00859940-I1Open ↗
08/31/2026M01166487-I1Open ↗
Showing 3 of 6 on file for this type
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/25/2026M01166487-S1Open ↗
08/25/2026M01166487-I1Open ↗
08/23/2026M01177365-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDEP ACP-20/ACP-21: Asbestos Project Conditional Completion Form/Asbestos Project Completion Form1
08/14/2026M00859940-I1Open ↗