ECB03/01/2004FAILURE TO MAINTAIN BUIDING NOTED A WATER FROM THE SECOND FLOOR BATHROOM CAUSING DAMAGE TO THE FIRST FLOOR CEILING.REMEDY:REPAIR THE LEAKAGEAND REPLACE THE ACCOUSTIC CEILING IMMEDIATLYNothing owed — awaiting certificate of correction
Primarily 2 family with 1 store or office · 917 sf lot · 3.49 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.