← Back
Elevator apt, semi-fireproof with stores
Eight80
870 ATLANTIC AVE · BIN 3330621
💬 Discuss this project
2024Year Built
17Stories
D7Building Class
C6-3AZoning
202,889 sfGross Floor Area
190Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: 888 ATLANTIC PROPERTY OWNER LP · 20,000 sf lot · 10.14 FAR built · Flood zone X
Locations of Work
EquipmentCivil
Roof4p · 1 filing · 16 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
H & O ENGINEERING, DPC206/28/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
YATZIV CORPGeneral Contractor407/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
H & O ENGINEERING, DPC5595106/26/2023
Building Lifecycle
All (22)Filed (2)Permit Issued (1)Signed Off (1)Objection (16)Special Inspection (2)
03/20/2024
Signed off — Full Demolition
Full demolition to a two story building
B00878683-I1
02/28/2024
Permit issued — Full Demolition
B00878683-I1-FD
08/15/2023
Objection raised — Structural
08/15/2023
Objection resolved — Addressed
07/28/2023
Objection raised — Structural
07/28/2023
Objection resolved — Addressed
07/28/2023
Objection raised — Admin
07/28/2023
Objection resolved — Addressed
06/29/2023
Objection raised — Fire_Protection
06/29/2023
Objection resolved — Addressed
06/29/2023
Objection raised — Admin
06/29/2023
Objection resolved — Addressed
06/29/2023
Objection raised — Structural
06/29/2023
Objection resolved — Addressed
06/29/2023
Objection raised — Structural
06/29/2023
Objection resolved — Addressed
06/29/2023
Objection raised — Structural
06/29/2023
Objection resolved — Addressed
06/28/2023
Filed — Full Demolition
Full demolition to a two story building
B00878683-S2
06/26/2023
Filed — Full Demolition
Full demolition to a two story building
B00878683-I1
06/26/2023
Special inspection requirement — Demolition
SANTIAGO HELMAN
06/26/2023
Special inspection requirement — Structural Stability – Alterations of existing Buildings
SANTIAGO HELMAN
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFull DemolitionSigned-offYATZIV CORP02/28/2024
DOB NOWProtection and Mechanical MethodsSigned-offYATZIV CORP—
Nothing on file for this building.
▾Special Inspection Requirements (DOB NOW) — 2
DateRequirementInspectorRole
06/26/2023DemolitionSANTIAGO HELMANspecial
06/26/2023Structural Stability – Alterations of existing BuildingsSANTIAGO HELMANspecial
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/27/2026B00878683-S2Request digital key ↗
08/14/2026B00878683-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026B00878683-I1Open ↗
08/23/2026B00878683-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/27/2026B00878683-I1Open ↗
08/27/2026B00878683-S2Open ↗
▸Trade Schedules & Equipment4
▸DOB NOWElectric Cut-Off1
08/13/2026B00878683-I1Open ↗
▸DOB NOWWater Cut-Off1
08/13/2026B00878683-I1Open ↗
▸DOB NOWGas Cut-Off1
08/13/2026B00878683-I1Open ↗
▸DOB NOWSewer Cut-Off1
08/13/2026B00878683-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/14/2026B00878683-I1Open ↗
▸DOB NOWRodent Control1
08/13/2026B00878683-I1Open ↗
▸Other Documents4
▸DOB NOWCommunity Board Notification1
08/13/2026B00878683-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B00878683-I1Open ↗
▸DOB NOWFull Demo: 10-Day Notice1
08/13/2026B00878683-I1Open ↗
▸DOB NOWStructure Photographs1
08/13/2026B00878683-I1Open ↗