← Back
BuildNYC
BROOKLYN
872 SETON PLACE
BROOKLYN · BIN 3430472
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
4 Active Violations 1 unresolved · 3 paperwork only ▸
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofNew 4-story Multi Family DwellingUnder Construction51p · 1 filing · 20 docs
BulkheadNew 4-story Multi Family DwellingUnder Construction3p · 1 filing · 20 docs
Floor 4New 4-story Multi Family DwellingUnder Construction50p · 1 filing · 20 docs
Floor 3New 4-story Multi Family DwellingUnder Construction48p · 1 filing · 20 docs
Floor 2New 4-story Multi Family DwellingUnder Construction49p · 1 filing · 20 docs
Floor 1New 4-story Multi Family DwellingUnder Construction50p · 1 filing · 20 docs
CellarNew 4-story Multi Family DwellingUnder Construction48p · 1 filing · 20 docs
Site & exteriorConstruction fence installationUnder Construction4p · 1 filing · 2 docs
Filed — no permit issuedTemporary pipe scaffold installation6p · 2 filings · 2 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Lion Holdings 880710/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
McHenery Testing Lab310/09/2026
Mark Weinberger Architect609/03/2026
SH Engineering204/24/2026
Aryeh Siegel Architect111/03/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Prime Piping & HeatingPlumbing110/06/2026
Prime Piping & HeatingFire Protection110/06/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616506/18/2026
Building Lifecycle
All (127)Filed (12)Permit Issued (6)Violation (5)Objection (74)Special Inspection (30)
10/09/2026
Filed — Alteration
INSTALLATION OF ENGINEERED ENCLOSURE SYSTEM AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SHALL COMPLY WITH CHAPTER#33 OF 2022 NYC BUILDING CODE.
B01472476-I1
10/09/2026
Filed — New Building
NEW 4 - STORY MULTI FAMILY DWELLING
B01310062-S6
10/09/2026
Filed — Alteration
PROPOSED INSTALLATION OF TEMPORARY PIPE SCAFFOLD AS PER PLANS. WORK SHALL COMPLY WITH CHAPTER #33 OF THE NYC BUILDING CODE. NO CHANGE IN USE, OCCUPANCY, OR EGRESS UNDER THIS APPLICATION.
B01472467-I1
10/05/2026
Permit issued — Sprinklers
B01310062-S1-EW-SP
10/05/2026
Permit issued — Plumbing
B01310062-S1-PL
09/07/2026
Objection resolved — Resolved
09/03/2026
Filed — New Building
NEW 4 - STORY MULTI FAMILY DWELLING
B01310062-P2
09/03/2026
Special inspection requirement — HVAC-R and service water heating system controls
09/03/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
09/03/2026
Special inspection requirement — Energy Code Compliance Inspections
09/03/2026
Special inspection requirement — Maintenance information
09/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
09/03/2026
Special inspection requirement — Post-installed Anchors
09/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
09/03/2026
Special inspection requirement — Permanent certificate
09/03/2026
Special inspection requirement — Sprinkler Systems
09/03/2026
Special inspection requirement — HVAC-R and service water heating equipment
07/16/2026
Objection resolved — Resolved
07/01/2026
Objection resolved — Addressed
07/01/2026
Objection resolved — Addressed
07/01/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
07/01/2026
Special inspection requirement — Post-installed Anchors
06/30/2026
Objection resolved — Addressed
06/25/2026
Permit issued — Structural
B01310062-S4-ST
06/25/2026
Objection raised — Other
06/25/2026
Objection raised — Admin
06/25/2026
Objection raised — Other
06/24/2026
Permit issued — Foundation
B01310062-S3-FO
06/22/2026
Objection resolved — Addressed
06/18/2026
Filed — New Building
NEW 4 - STORY MULTI FAMILY DWELLING
B01310062-S2
06/18/2026
Objection raised — Other
06/16/2026
Objection raised — Other
06/15/2026
Filed — New Building
NEW 4 - STORY MULTI FAMILY DWELLING
B01310062-S5
06/15/2026
Objection raised — Other
06/11/2026
Filed — New Building
NEW 4 - STORY MULTI FAMILY DWELLING
B01310062-S1
06/10/2026
Special inspection requirement — Permanent certificate
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
06/01/2026
Special inspection requirement — HVAC-R and service water heating system controls
06/01/2026
Special inspection requirement — Maintenance information
06/01/2026
Special inspection requirement — HVAC-R and service water heating equipment
06/01/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
05/18/2026
Violation issued (ECB, open)
Construction
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/07/2026
Objection resolved — Addressed
05/07/2026
Special inspection requirement — Structural Steel - Welding
Shahrish Shuvo
05/07/2026
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
Shahrish Shuvo
05/07/2026
Special inspection requirement — Structural Steel - Details
Shahrish Shuvo
05/05/2026
Permit issued — General Construction
B01310062-I1-GC
04/30/2026
Objection raised — Other
04/30/2026
Objection raised — Scope
04/30/2026
Objection raised — Other
04/30/2026
Objection raised — Structural
04/30/2026
Objection raised — Structural
Latest 60 of 127 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSprinklersPermit IssuedPrime Piping & Heating10/05/2026
DOB NOWPlumbingPermit IssuedPrime Piping & Heating10/05/2026
DOB NOWStructuralPermit IssuedLionstone Developers06/25/2026
DOB NOWFoundationPermit IssuedLionstone Developers06/24/2026
DOB NOWGeneral ConstructionPermit IssuedLionstone Developers05/05/2026
DOB NOWConstruction FencePermit IssuedN Tech Design of America11/20/2025
1 project · most recent 10/09/2026
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
10/09/2026Permit IssuedLionstone DevelopersHeating and Air Conditioning Systems
Heat / Cool
Daikin RXP24AVJU9 24,000 BTU · Heat Pump Outdoor ×10
1 project · most recent 10/09/2026
Sprinkler System
FiledStatusContractorScope
10/09/2026Permit IssuedPrime Piping & HeatingSprinkler System
1 project · most recent 10/09/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
10/09/2026Permit IssuedAmb MechanicalGas, Storm, Water/Sanitary
2 projects · most recent 12/18/2025
General Wiring
FiledStatusContractorScope
12/18/2025Permit IssuedPower Direct ElectricGeneral Wiring
12/18/2025Permit IssuedPower Direct Electric—
1 project · most recent 10/09/2026
Steel
FiledStatusContractorScope
10/09/2026Permit IssuedAmb MechanicalSteel
3 projects · most recent 10/09/2026
Sidewalk Shed Scaffold Fence
FiledStatusContractorScope
10/09/2026Permit IssuedAmb MechanicalSidewalk Shed
10/09/2026——Scaffold
11/03/2025Permit IssuedN Tech Design of AmericaFence
▾Special Inspection Requirements (DOB NOW) — 64
DateRequirementInspectorRole
09/03/2026Fire-Resistant Penetrations and Joints—special
09/03/2026Post-installed Anchors—special
09/03/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
09/03/2026Sprinkler Systems—special
09/03/2026Energy Code Compliance Inspections—progress
09/03/2026HVAC-R and service water piping design and insulation—energy_progress
09/03/2026HVAC-R and service water heating system controls—energy_progress
09/03/2026Maintenance information—energy_progress
09/03/2026HVAC-R and service water heating equipment—energy_progress
09/03/2026Permanent certificate—energy_progress
07/01/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation—special
07/01/2026Post-installed Anchors—special
06/10/2026Permanent certificate—energy_progress
06/01/2026Fire-Resistant Penetrations and Joints—special
06/01/2026Energy Code Compliance Inspections—progress
06/01/2026HVAC-R and service water piping design and insulation—energy_progress
06/01/2026HVAC-R and service water heating equipment—energy_progress
06/01/2026Maintenance information—energy_progress
06/01/2026HVAC-R and service water heating system controls—energy_progress
05/07/2026Structural Steel - WeldingShahrish Shuvospecial
05/07/2026Excavations - Sheeting, Shoring, and BracingShahrish Shuvospecial
05/07/2026Structural Steel - DetailsShahrish Shuvospecial
04/22/2026FinalShahrish Shuvoprogress
04/22/2026Subsurface Investigations (Borings/Test Pits)Bin Lispecial
04/22/2026Concrete - Cast-In-PlaceShahrish Shuvospecial
Latest 25 of 64.
▾Documents — 14 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/20/2026B01310452-I1Request digital key ↗
▸Seals & Professional Certifications13
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026B01310062-S3Open ↗
08/28/2026B01310062-I1Open ↗
08/28/2026B01310062-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature4
10/14/2026B01472476-I1Open ↗
10/14/2026B01472467-I1Open ↗
10/11/2026B01310062-P2Open ↗
Showing 3 of 4 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B01310062-S3Open ↗
09/01/2026B01310062-S3Open ↗
08/28/2026B01310062-I1Open ↗
Showing 3 of 4 on file for this type