| Owner | Filings | Most Recent |
|---|---|---|
| 875 BCSP-K 875 PROPERTY | 1 | 09/13/2026 |
| INTERSYSTEM INSTALLATION CORP | 18 | 07/08/2026 |
| TRI HILL | 20 | 07/08/2026 |
| LEE ASSOCIATES MGT | 79 | 07/08/2026 |
| CEPRINE CONSTRUCTION | 14 | 07/08/2026 |
| L K PARTNERS | 7 | 07/08/2026 |
| TRIHILL MANAGEMENT INC | 12 | 03/22/2026 |
| BCSP-K 875 PROPERTY LLC | 1 | 03/22/2026 |
| OLD 875 LLC NEW 875 | 110 | 03/22/2026 |
| NEW 875 LLC C/O SIERR | 1 | 03/22/2026 |
| Date | Price | Unit | Seller → Buyer | $/sf |
|---|---|---|---|---|
| 06/30/2023 | $92.5M | — | OLD 875 LLC → BCSP-K 875 PROPERTY LLC | $432/sf building |
| Firm | Filings | Most Recent |
|---|---|---|
| VM ARCHITECTURE STUDIO, PC | 5 | 09/08/2026 |
| CATAPANO ENGINEERING PC | 5 | 06/01/2026 |
| JACK GREEN ASSOCIATES | 24 | 05/21/2026 |
| VMAD | 5 | 10/01/2025 |
| TOHFAZ UDDIN PE PC | 2 | 08/15/2025 |
| WALSH ENGINEERING PLLC | 1 | 08/12/2025 |
| E38 ARCHITECTS, PC | 6 | 04/07/2025 |
| CPENGINEERING PC | 2 | 04/02/2025 |
| SILMAN | 2 | 02/13/2025 |
| M. CHETRIT CONSULTING ENGINEERS P.C | 8 | 09/23/2024 |
| ENV ARCHITECTS, DPC | 3 | 09/20/2024 |
| ASHRAF CORP | 3 | 06/12/2024 |
| LOMBARDO PROFESSIONAL ENGINEERING | 2 | 03/07/2024 |
| HOWARD L ZIMMERMAN ARCH & ENG DPC | 1 | 11/29/2023 |
| KENDALL ENGINEERING PC | 1 | 07/06/2023 |
| MG ENGINEERING D.P.C. | 4 | 08/18/2022 |
| ALL CITY ENGINEERING PC | 4 | 07/05/2022 |
| CHI F. LAU ARCHITECT, P.C. | 1 | 01/27/2022 |
| CAMERON ENGINEERING | 3 | 12/15/2020 |
| AUGUSTINE LEE ARCHITECT PC | 1 | 09/23/2020 |
| EMTEC CONSULTANTS | 2 | 07/07/2020 |
| EOC-NY | 1 | 03/03/2020 |
| ASIF JAMIL, RA | 9 | 12/23/2019 |
| KZ ENGINEERING, P.C | 3 | 11/21/2019 |
| Representative | Filings | Most Recent |
|---|---|---|
| MUNICIPAL BUILDING CONSULTANTS | 24 | 03/21/2026 |
| BMB BUILDING CONSULTING | 10 | 03/21/2026 |
| JAM CONSULTANTS, INC. | 26 | 03/21/2026 |
| GREEN LIGHT EXPEDITING LLC | 8 | 03/21/2026 |
| JM ZONING, LLC. | 7 | 03/21/2026 |
| CASA GROUP | 4 | 03/21/2026 |
| SPRING SCAFFOLDING LLC | 4 | 03/21/2026 |
| LOMBARDO BUILDING CONSULTANTS | 2 | 03/21/2026 |
| HLZAE | 1 | 03/21/2026 |
| Firm | Trade | Roles | Most Recent |
|---|---|---|---|
| INTERIOR BUILDING SERVICE | General Contractor | 20 | 09/12/2026 |
| L&K PARTNERS, INC | General Contractor | 9 | 07/08/2026 |
| CEPRINE CONSTRUCTION INC | General Contractor | 8 | 07/08/2026 |
| INTERSYSTEMS INSTAL S&S | General Contractor | 8 | 07/08/2026 |
| INTERSYSTEM INSTALLATION | General Contractor | 6 | 07/08/2026 |
| 360 GENERAL CONTRACTING I | General Contractor | 6 | 03/21/2026 |
| GABE CONSTRUCTION AND DEVELOP | General Contractor | 6 | 03/21/2026 |
| ADDISON PLBG AND HTG CORP | Fire Protection | 4 | 07/08/2026 |
| ADDISON PLBG AND HTG CORP | Plumbing | 3 | 07/08/2026 |
| ASE HVAC INC | General Contractor | 3 | 03/21/2026 |
| MILLSTONE CONSTRUCTION AS | General Contractor | 3 | 03/21/2026 |
| PFL MECHANICAL CORP | Plumbing | 3 | 07/08/2026 |
| JOHN GALLIN & SON, INC | General Contractor | 3 | 07/08/2026 |
| GRUSHINSKY PIPNG & HTG IN | Fire Protection | 3 | 07/08/2026 |
| HARVEY ISAACMAN | Electrical | 3 | 03/21/2026 |
| BEDROCK PLBG. & HTG., INC | Plumbing | 2 | 07/08/2026 |
| SPRING SCAFFOLDING LLC | General Contractor | 2 | 07/08/2026 |
| ZONE PLUMBING & HEATING C | Plumbing | 1 | 07/08/2026 |
| CEDAR ELEC'L CONT'RS INC. | Electrical | 1 | 03/22/2026 |
| POWERONE ELECT'L CONTRG | Electrical | 1 | 03/22/2026 |
| BEDROCK MECHANICAL INC | Fire Protection | 1 | 07/08/2026 |
| JEM FIRE PREVENTION INC | Fire Protection | 1 | 07/08/2026 |
| METRO FIRE PROTECTION INC | Fire Protection | 1 | 07/08/2026 |
| VILLAGE P & H NY INC | Fire Protection | 1 | 07/08/2026 |
| A-1 EXPERT INSTALLATION | General Contractor | 1 | 07/08/2026 |
| Agency | License # | Filings | Most Recent |
|---|---|---|---|
| CROSSCHECK INSPECTION SER | 544 | 12 | 09/08/2026 |
| CATAPANO ENGINEERING & AR | 3235 | 4 | 06/01/2026 |
| SOCOTEC ENGINEERING | 4983 | 9 | 02/04/2026 |
| JACK GREEN ASSOCIATES | 422 | 17 | 08/27/2025 |
| WALSH ENGINEERING PLLC | 9393 | 1 | 08/12/2025 |
| ALAN MARGOLIN & ASSOC | 423 | 3 | 09/23/2024 |
| HOWARD L ZIMMERMAN ARCHIT | 1712 | 1 | 11/29/2023 |
| KENDALL ENGINEERING PC | 4154 | 1 | 07/06/2023 |
| RICHARD H. BALSER ENGINEE | 3028 | 4 | 08/18/2022 |
| ALL CITY ENGINEERING PC | 7115 | 5 | 07/05/2022 |
| Source | Work Type | Status | Applicant | Issued |
|---|---|---|---|---|
| DOB NOW | General Construction | Permit Issued | INTERIOR BUILDING SERVICE | 09/10/2026 |
| DOB NOW | General Construction | Signed-off | INTERIOR BUILDING SERVICE | 06/23/2026 |
| DOB NOW | Plumbing | Permit Issued | PFL MECHANICAL CORP | 05/22/2026 |
| DOB NOW | General Construction | Permit Issued | INTERIOR BUILDING SERVICE | 05/11/2026 |
| DOB NOW | Suspended Scaffold | Permit Issued | EVERLAST SOLUTIONS CORP | 05/04/2026 |
| DOB NOW | Mechanical Systems | Signed-off | PIECE MANAGEMENT INC | 04/27/2026 |
| DOB NOW | Sprinklers | Permit Issued | PRODIGY PLBG&HTG CORP | 03/24/2026 |
| DOB NOW | General Construction | Signed-off | INTERIOR BUILDING SERVICE | 02/12/2026 |
| DOB NOW | General Construction | Signed-off | INTERIOR BUILDING SERVICE | 01/08/2026 |
| DOB NOW | Structural | Signed-off | L&K PARTNERS, INC | 11/17/2025 |
| DOB NOW | Sprinklers | Permit Issued | PRODIGY PLBG&HTG CORP | 11/05/2025 |
| DOB NOW | Plumbing | Permit Issued | PRODIGY PLBG & HTG CORP | 11/05/2025 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 10/24/2025 |
| DOB NOW | General Construction | Permit Issued | INTERIOR BUILDING SERVICE | 10/06/2025 |
| DOB NOW | Sprinklers | Permit Issued | PRODIGY PLBG&HTG CORP | 08/25/2025 |
| DOB NOW | Sprinklers | Permit Issued | PRODIGY PLBG & HTG CORP | 08/22/2025 |
| DOB NOW | Protection and Mechanical Methods | Signed-off | SPRING SCAFFOLDING LLC | 08/18/2025 |
| DOB NOW | Structural | Signed-off | L&K PARTNERS, INC | 08/14/2025 |
| DOB NOW | Sprinklers | Signed-off | PFL MECHANICAL CORP | 05/05/2025 |
| DOB NOW | Mechanical Systems | Signed-off | INTERIOR BUILDING SERVICE | 05/02/2025 |
| DOB NOW | Sprinklers | Signed-off | GRUSHINSKY PIPNG & HTG IN | 05/02/2025 |
| DOB NOW | Mechanical Systems | Signed-off | INTERIOR BUILDING SERVICE | 05/02/2025 |
| DOB NOW | Construction Fence | Signed-off | SPRING SCAFFOLDING LLC | 04/22/2025 |
| DOB NOW | General Construction | Signed-off | L&K PARTNERS, INC | 04/02/2025 |
| DOB NOW | General Construction | Signed-off | INTERIOR BUILDING SERVICE | 02/12/2025 |
| DOB NOW | Mechanical Systems | Signed-off | L&K PARTNERS, INC | 02/11/2025 |
| DOB NOW | Sprinklers | Permit Issued | PRODIGY PLBG&HTG CORP | 02/07/2025 |
| DOB NOW | Plumbing | Permit Issued | PRODIGY PLBG & HTG CORP | 02/07/2025 |
| DOB NOW | Structural | Signed-off | L&K PARTNERS, INC | 01/29/2025 |
| DOB NOW | General Construction | Permit Issued | L&K PARTNERS, INC | 01/06/2025 |
| DOB NOW | Mechanical Systems | Permit Issued | L&K PARTNERS, INC | 12/09/2024 |
| DOB NOW | Plumbing | Signed-off | BEDROCK PLBG. & HTG., INC | 10/03/2024 |
| DOB NOW | Sprinklers | Permit Issued | BEDROCK MECHANICAL INC | 10/03/2024 |
| DOB NOW | General Construction | Signed-off | JOHN GALLIN SON | 10/02/2024 |
| DOB NOW | Mechanical Systems | Signed-off | JOHN GALLIN SON | 10/02/2024 |
| DOB NOW | Sidewalk Shed | Signed-off | INTERSYSTEMS INSTAL S&S | 09/27/2024 |
| DOB NOW | Supported Scaffold | Signed-off | INTERSYSTEMS INSTAL S&S | 09/25/2024 |
| DOB NOW | Sprinklers | Signed-off | GRUSHINSKY PIPNG & HTG IN | 09/04/2024 |
| DOB NOW | General Construction | Signed-off | INTERIOR BUILDING SERVICE | 06/14/2024 |
| DOB NOW | Mechanical Systems | Signed-off | INTERIOR BUILDING SERVICE | 06/05/2024 |
| Filed | Status | Contractor | Scope | Make / Model / Capacity |
|---|---|---|---|---|
| 06/10/2026 | Signed-off | INTERIOR BUILDING SERVICE | Heating and Air Conditioning Systems, Ventilation Systems | |
| 06/01/2026 | Signed-off | PIECE MANAGEMENT INC | Air Conditioning Systems | |
| 02/04/2026 | Permit Issued | L&K PARTNERS, INC | Air Conditioning Systems, Heating and Air Conditioning Systems | Cooling Mitsubishi Electric MXZ-SM36NL 3 tons · Split System ×1 Heat / Cool |
| 04/29/2025 | Signed-off | INTERIOR BUILDING SERVICE | Heating and Air Conditioning Systems, Ventilation Systems | Heat / Cool Lg ARNU363M2A4 54,000 BTU · Vrf Indoor ×5 ARNU243M3A4 24,200 BTU · Vrf Indoor ×2 ARNU123M2A4 12,000 BTU · Vrf Indoor ×2 ARNU423M3A4 42,000 BTU · Vrf Indoor ×1 ARNU483M2A4 48,000 BTU · Vrf Indoor ×1 ARUM241BTE5 233,100 BTU · Vrf Outdoor ×2 ARNU483M3A4 48,000 BTU · Vrf Indoor ×5 Ventilation |
| 07/09/2021 | — | — | Air Conditioning Systems | — |
| 07/09/2021 | — | — | Air Conditioning Systems | Cooling Mitsubishi Electric PUMY-P48NKMU3 4 tons · Vrf Outdoor ×2 |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/04/2026 | Permit Issued | ADDISON PLBG AND HTG CORP | Sprinkler System |
| 08/27/2025 | Permit Issued | ADDISON PLBG AND HTG CORP | Sprinkler System |
| 06/17/2025 | — | — | — |
| 04/29/2025 | Signed-off | GRUSHINSKY PIPNG & HTG IN | 151 heads |
| 07/09/2021 | — | — | — |
| 07/09/2021 | Permit Issued | PARAMOUNT SERVICES, LLC | 74 heads |
| 12/15/2020 | — | — | 22 heads |
| 07/07/2020 | — | — | 12 heads |
| 08/07/2019 | Signed-off | GRUSHINSKY PIPNG & HTG IN | 67 heads |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 06/10/2026 | Permit Issued | PFL MECHANICAL CORP | Water/Sanitary |
| 02/04/2026 | Permit Issued | ADDISON PLBG AND HTG CORP | Water/Sanitary |
| 08/27/2025 | Permit Issued | ADDISON PLBG AND HTG CORP | — |
| 04/29/2025 | Signed-off | PFL MECHANICAL CORP | Water/Sanitary |
| 07/09/2021 | Signed-off | 5 BORO'S PLUMBING INC | Water/Sanitary |
| 12/15/2020 | — | — | Water/Sanitary |
| 07/07/2020 | Permit Issued | G&B PLUMBING&HEATING CORP | Water/Sanitary |
| 08/07/2019 | — | — | — |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 05/20/2026 | Complete | ECO ELECTRICAL SERVCS LLC | General Wiring, Lighting |
| 05/30/2025 | Complete | ECO ELECTRICAL SERVCS LLC | — |
| 05/01/2025 | Permit Issued | CITYWIDE ELEC'L WIRING IN | General Wiring |
| 05/01/2025 | Permit Issued | CITYWIDE ELEC'L WIRING IN | General Wiring |
| 02/13/2025 | Complete | ASA ELECTRIC INC | General Wiring |
| 11/10/2024 | Permit Issued | CITYWIDE ELEC'L WIRING IN | General Wiring |
| 07/18/2024 | Permit Issued | CENTENNIAL ELEVATOR INDUS | General Wiring |
| 04/05/2024 | Complete | SALVATORE CAMPISI & SONS | General Wiring |
| 04/18/2022 | Complete | STEVEN FARKAS | — |
| 03/09/2022 | Permit Issued | ROBERT CHIMENTI | 7 meters, 1 new_meters |
| 02/09/2022 | Complete | Y ELECTRIC INC | General Wiring |
| 04/01/2021 | Complete | SALVATORE CAMPISI & SONS | General Wiring |
| 06/22/2020 | Permit Issued | BAY ELECTRIC INC. | General Wiring |
| 05/07/2020 | Permit Issued | POWERONE ELECT'L CONTRG | 281 meters, 1 new_meters |
| 03/04/2020 | Permit Issued | Y.S ELECTRIC | General Wiring, Lighting |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 02/04/2026 | Permit Issued | ADDISON PLBG AND HTG CORP | Steel, Concrete |
| 08/27/2025 | Permit Issued | ADDISON PLBG AND HTG CORP | Steel, Concrete |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/24/2025 | — | — | Fence |
| Filed | Status | Contractor | Scope |
|---|---|---|---|
| 03/07/2024 | Permit Issued | EVERLAST SOLUTIONS CORP | Suspended Scaffold (SC) |
| Date | Type | Result | Report |
|---|---|---|---|
| 06/04/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 06/02/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 05/13/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 05/05/2026 | Pass-Final General Construction Non-Directive 14 | Pass | View ↗ |
| 04/20/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 04/17/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 04/15/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 03/11/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 03/11/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 03/05/2026 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| 02/27/2026 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 02/27/2026 | Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test | Certified | View ↗ |
| 02/26/2026 | Pass-Final CND-Occupancy Inspection | Pass | View ↗ |
| 01/23/2026 | Pass-Final PL - Up to 3 Requested Floors | Pass | View ↗ |
| 01/23/2026 | Pass-Final SD - Up to 3 Requested Floors | Pass | View ↗ |
| 01/23/2026 | Pass-Final SP - Up to 3 Requested Floors | Pass | View ↗ |
| 01/14/2026 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 01/14/2026 | Fail-Final General Construction Non-Directive 14 | Fail | View ↗ |
| 12/18/2025 | Fail-Final PL - Up to 3 Requested Floors | Fail | View ↗ |
| 12/03/2025 | Certified Remove/Cap - work done in accordance with code | Certified | View ↗ |
| 11/14/2025 | Certified Storm Drainage-ST-Piping-Roughing | Certified | View ↗ |
| 11/14/2025 | Certified Storm Drainage-ST-Piping-Underground | Certified | View ↗ |
| 11/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Roughing | Certified | View ↗ |
| 11/14/2025 | Certified Water and Sanitary-WS-Sanitary Piping-Underground | Certified | View ↗ |
| 11/12/2025 | Certified Sprinkler-SP-Fixtures-Finish | Certified | View ↗ |
| Date | Requirement | Inspector | Role |
|---|---|---|---|
| 09/03/2026 | Final | EUGENE BIFULCO | progress |
| 09/03/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 06/08/2026 | Final | EUGENE BIFULCO | progress |
| 06/08/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 06/02/2026 | Final | JOHN CATAPANO | progress |
| 06/02/2026 | Energy Code Compliance Inspections | JOHN CATAPANO | progress |
| 06/02/2026 | Fire-Resistant Penetrations and Joints | JOHN CATAPANO | special |
| 06/02/2026 | Mechanical Systems | JOHN CATAPANO | special |
| 06/02/2026 | Maintenance information | JOHN CATAPANO | energy_progress |
| 06/02/2026 | Shutoff dampers | JOHN CATAPANO | energy_progress |
| 06/02/2026 | HVAC and service water heating equipment | JOHN CATAPANO | energy_progress |
| 06/02/2026 | HVAC and service water heating system controls | JOHN CATAPANO | energy_progress |
| 06/02/2026 | HVAC insulation and sealing | JOHN CATAPANO | energy_progress |
| 05/06/2026 | Fire-Resistant Penetrations and Joints | JOHN CATAPANO | special |
| 05/06/2026 | Shutoff dampers | JOHN CATAPANO | energy_progress |
| 05/06/2026 | HVAC and service water heating equipment | JOHN CATAPANO | energy_progress |
| 05/06/2026 | Maintenance information | JOHN CATAPANO | energy_progress |
| 05/06/2026 | HVAC insulation and sealing | JOHN CATAPANO | energy_progress |
| 05/06/2026 | HVAC and service water heating system controls | JOHN CATAPANO | energy_progress |
| 05/06/2026 | Final | JOHN CATAPANO | progress |
| 05/06/2026 | Energy Code Compliance Inspections | JOHN CATAPANO | progress |
| 05/06/2026 | Mechanical Systems | JOHN CATAPANO | special |
| 05/05/2026 | Fire-Resistant Penetrations and Joints | EUGENE BIFULCO | special |
| 04/28/2026 | Final | EUGENE BIFULCO | progress |
| 02/05/2026 | Standpipe Systems | ALEXIS SCHLESSINGERMAN | special |
| Tenant | Space | Floors | Renovation projects |
|---|---|---|---|
| Lee & Associates | Office | Floors 16, 17, 19 | Project M00546189 Project M00525716 Project M00546214 Project M00318023 |
| Florentine Films | Office | Floor 17 | Project M00546202 |
| Northmarq Capital Lee & Associates | Office | Floor 16 | Project M00526702 |
| Northmarq Capital | Office | Floor 16 | Project M00525645 |
| Starbucks | Restaurant / Food Service | Floor 1 | Project M00290168 |
| Cambridge Insurance Advisors | Office | Floor 10 | Project M00197180 Project M00206299 |