← Back
Three families
8751 16 AVENUE
BROOKLYN · Bath Beach · BIN 3167503
💬 Discuss this project
1925Year Built
2.5Stories
C0Building Class
R4Zoning
2,700 sfGross Floor Area
3Units
Rent Stabilized9 Open Violations ▸FDNY Report ↗
Three families · 5,417 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingGeneral
Floor 38p · 2 filings · 18 docs
Floor 210p · 2 filings · 18 docs
Floor 110p · 2 filings · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2023$1.6M—Private party → Private party$607/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
BASSIRI609/23/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KLE CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BASSIRI8394309/23/2024
Building Lifecycle
All (40)Filed (6)Permit Issued (2)Signed Off (2)Violation (17)Inspection (4)Special Inspection (9)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, open)
I
06/06/2025
Violation issued (HPD, open)
A
11/26/2024
Violation issued (HPD, open)
I
10/04/2024
Signed off — Alteration
RENOVATION OF EXISTING FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00992595-I1
10/03/2024
Signed off — Alteration
RENOVATION OF EXISTING FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON FIRST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00992599-I1
10/03/2024
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
09/25/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/25/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/25/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/23/2024
Filed — Alteration
RENOVATION OF EXISTING FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00992595-P2
09/23/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
09/23/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
09/23/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
09/04/2024
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
07/23/2024
Filed — Alteration
RENOVATION OF EXISTING FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON FIRST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00992599-P2
07/22/2024
Filed — Alteration
RENOVATION OF EXISTING FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00992595-P1
07/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FARHAD BASSIRI-TEHRANI
07/22/2024
Special inspection requirement — Energy Code Compliance Inspections
FARHAD BASSIRI-TEHRANI
07/22/2024
Special inspection requirement — Fire-Resistance Rated Construction
FARHAD BASSIRI-TEHRANI
05/10/2024
Filed — Alteration
RENOVATION OF EXISTING FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON FIRST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00992599-P1
04/15/2024
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
04/15/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/03/2024
Violation issued (HPD, open)
A
01/23/2024
Permit issued — General Construction
B00992595-I1-GC
01/22/2024
Permit issued — Plumbing
B00992599-I1-PL
01/19/2024
Filed — Alteration
RENOVATION OF EXISTING FIRST, SECOND AND THIRD FLOOR WITH GENERAL CONSTRUCTION: NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00992595-I1
01/19/2024
Filed — Alteration
RENOVATION OF EXISTING FIRST, SECOND AND THIRD FLOOR WITH PLUMBING WORK:RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW BOILERS AND HOT WATER HEATERS ON FIRST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B00992599-I1
01/08/2024
Violation issued (ECB, closed)
Construction
11/20/2023
Violation issued (HPD, open)
I
03/20/2023
Violation issued (HPD, open)
A
02/22/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, open)
A
04/06/2021
Violation issued (HPD, open)
A
10/28/2019
Violation issued (HPD, closed)
I
11/15/2017
Violation issued (HPD, closed)
I
11/01/2016
Violation issued (HPD, closed)
I
10/06/2015
Violation issued (HPD, closed)
I
02/06/2015
Violation issued (HPD, closed)
I
07/30/1992
Violation issued (ECB, closed)
Construction
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offKLE CONSTRUCTION INC01/23/2024
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC01/22/2024
Nothing on file for this building.
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
10/03/2024Pass-Final General Construction Non-Directive 14PassView ↗
09/04/2024Fail-Final General Construction Non-Directive 14FailView ↗
04/15/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
04/15/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
09/25/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/25/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/25/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
09/23/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
09/23/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
09/23/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
07/22/2024Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
07/22/2024Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
07/22/2024Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/26/2026B00992599-I1Request digital key ↗
08/26/2026B00992599-P2Request digital key ↗
08/26/2026B00992599-P1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/26/2026B00992599-P1Open ↗
08/26/2026B00992599-I1Open ↗
08/26/2026B00992595-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/29/2026B00992595-P2Open ↗
08/26/2026B00992595-I1Open ↗
08/25/2026B00992595-P1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/29/2026B00992595-P2Open ↗
08/26/2026B00992595-I1Open ↗
08/25/2026B00992595-P1Open ↗