← Back
Office only, 2-6 stories
876 BUSHWICK AVENUE
BROOKLYN · BIN 3074331
💬 Discuss this project
1931Year Built
2Stories
O2Building Class
R6Zoning
2,306 sfGross Floor Area
2Units
14 Open Violations 12 unresolved · 2 paperwork only ▸FDNY Report ↗
Office only, 2-6 stories · Owner of record: BUSHWICK BH 876 LLC · 1,402 sf lot · 1.64 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralPlumbing
Permit Issued — active, not yet Signed-off
Floor 4Under Construction8p · 2 filings · 20 docs
Floor 3Under Construction9p · 2 filings · 20 docs
Floor 2Under Construction8p · 2 filings · 20 docs
Floor 1Under Construction8p · 2 filings · 20 docs
CellarUnder Construction2p · 1 filing · 20 docs
Sub-Basement6p · 1 filing · 19 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TRIBECA CONSTRUCTION GROUP404/09/2026
BUSHWICK BH 876 LLC103/22/2026
Y R A DEVELOPMENT103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/20/2024$750K—Private party → BUSHWICK BH 876 LLC$325/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ARCHITECTURAL CONCEPT708/10/2026
RIMKUS103/27/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARCHITECTUAL CONCEPT1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CASA AZOUTR INCGeneral Contractor808/20/2026
POWER SURGE ELECTRIC, INCElectrical103/22/2026
TRIBECA CONSTRUCTION GROUPGeneral Contractor104/09/2026
ROCK E SMALL PLBG&HTG INCPlumbing106/28/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ARCHITECTURAL CONCEPT3642608/10/2026
Building Lifecycle
All (130)Filed (8)Permit Issued (8)Violation (41)Inspection (4)Objection (39)Special Inspection (30)
08/19/2026
Permit issued — Foundation
B00954346-I1-GC-CX
08/19/2026
Permit issued — Construction Fence
B00960299-I1-FN
08/10/2026
Filed — Alteration
Install new plumbing fixtures as per drawing.
B00960300-P2
07/29/2026
Violation issued (ECB, open)
Construction
07/07/2026
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
07/07/2026
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
07/07/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
07/07/2026
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
07/07/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
04/22/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/19/2026
Violation issued (ECB, closed)
Unknown
01/19/2026
Violation issued (ECB, closed)
Construction
01/07/2026
Violation issued (ECB, open)
Construction
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
10/31/2025
Violation issued (ECB, closed)
Unknown
10/31/2025
Violation issued (ECB, closed)
Unknown
10/31/2025
Violation issued (ECB, closed)
Unknown
08/27/2025
Permit issued — Foundation
B00954346-I1-GC-CX
08/27/2025
Permit issued — Construction Fence
B00960299-I1-FN
08/26/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/26/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
07/24/2025
Permit issued — Plumbing
B00960300-I1-PL
06/04/2025
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
06/04/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
06/04/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
06/04/2025
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
06/04/2025
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
05/29/2025
Filed — Alteration
Install new plumbing fixtures as per drawing.
B00960300-P1
05/19/2025
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
05/19/2025
Special inspection requirement — Energy Code Compliance Inspections
MUZAFFAR JAMAL
05/19/2025
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
MUZAFFAR JAMAL
05/19/2025
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
05/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
MUZAFFAR JAMAL
03/28/2025
Permit issued — Supported Scaffold
B01202077-I1-SF
03/27/2025
Filed — Alteration
INSTALLATION OF PIPE SCAFFOLDING. NO CHANGE IN USE, EGRESS OR OCCUPANCY.
B01202077-I1
02/07/2025
Special inspection requirement — Insulation placement and R values
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Permanent certificate
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Maintenance information
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Vestibules
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Shutoff dampers
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Air barrier — testing
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — HVAC-R and service water heating system controls
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Interior lighting power
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Protection of exposed foundation insulation
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Lighting controls
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Air barrier - visual inspection
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — HVAC-R and service water heating equipment
MUZAFFAR JAMAL
02/07/2025
Special inspection requirement — Fenestration air leakage
MUZAFFAR JAMAL
02/04/2025
Objection resolved — Addressed
01/14/2025
Objection raised — Scope
12/24/2024
Filed — Alteration CO
Interior renovation / alteration and vertical addition of existing building as per drawings herewith filed to convert into two family house. Obtain new certificate of occupancy.
B00954346-P1
11/19/2024
Objection raised — Structural
11/19/2024
Objection raised — Other
11/19/2024
Objection raised — Mechanical
11/19/2024
Objection raised — Structural
11/19/2024
Objection raised — Structural
11/19/2024
Objection raised — Structural
Latest 60 of 130 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWFoundationPermit IssuedCASA AZOUTR INC08/19/2026
DOB NOWConstruction FencePermit IssuedCASA AZOUTR INC08/19/2026
DOB NOWFoundationPermit IssuedCASA AZOUTR INC08/27/2025
DOB NOWConstruction FencePermit IssuedCASA AZOUTR INC08/27/2025
DOB NOWPlumbingPermit IssuedROCK E SMALL PLBG&HTG INC07/24/2025
DOB NOWSupported ScaffoldPermit IssuedTRIBECA CONSTRUCTION GROU03/28/2025
DOB NOWStructuralPermit IssuedCASA AZOUTR INC11/13/2024
DOB NOWConstruction FencePermit IssuedCASA AZOUTR INC10/09/2024
1 project · most recent 12/24/2024
Air Conditioning Systems Ventilation Systems
FiledStatusContractorScopeMake / Model / Capacity
12/24/2024Permit IssuedCASA AZOUTR INCAir Conditioning Systems, Ventilation Systems
Cooling
Fujitsu FUJITSU MODEL # ASU7RLF1 98,000 BTU · Fan Coil Indoor ×28
1 project · most recent 08/10/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
08/10/2026Permit IssuedROCK E SMALL PLBG&HTG INCGas, Storm, Water/Sanitary
2 projects · most recent 07/23/2026
General Wiring
FiledStatusContractorScope
07/23/2026Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
11/12/2024Permit IssuedPOWER SURGE ELECTRIC, INCGeneral Wiring
1 project · most recent 12/24/2024
Steel Concrete Masonry
FiledStatusContractorScope
12/24/2024Permit IssuedCASA AZOUTR INCSteel, Concrete, Masonry
2 projects · most recent 03/27/2025
Scaffold Fence
FiledStatusContractorScope
03/27/2025Permit IssuedTRIBECA CONSTRUCTION GROUScaffold
10/03/2024Permit IssuedCASA AZOUTR INCFence
▾Field Inspections (DOB CAP) — 4
DateTypeResultReport
04/22/2026Pass-Final General Construction Non-Directive 14PassView ↗
08/26/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/26/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/26/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 47
DateRequirementInspectorRole
07/07/2026HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
07/07/2026HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
07/07/2026Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
07/07/2026Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
07/07/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
06/04/2025Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
06/04/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
06/04/2025Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
06/04/2025HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
06/04/2025HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
05/19/2025HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
05/19/2025Energy Code Compliance InspectionsMUZAFFAR JAMALprogress
05/19/2025Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationMUZAFFAR JAMALspecial
05/19/2025HVAC-R and service water heating equipmentMUZAFFAR JAMALenergy_progress
05/19/2025Fire-Resistant Penetrations and JointsMUZAFFAR JAMALspecial
02/07/2025Insulation placement and R valuesMUZAFFAR JAMALenergy_progress
02/07/2025Permanent certificateMUZAFFAR JAMALenergy_progress
02/07/2025Maintenance informationMUZAFFAR JAMALenergy_progress
02/07/2025VestibulesMUZAFFAR JAMALenergy_progress
02/07/2025Shutoff dampersMUZAFFAR JAMALenergy_progress
02/07/2025Air barrier — testing MUZAFFAR JAMALenergy_progress
02/07/2025HVAC-R and service water piping design and insulationMUZAFFAR JAMALenergy_progress
02/07/2025HVAC-R and service water heating system controlsMUZAFFAR JAMALenergy_progress
02/07/2025Fenestration and door U-factor and product ratingsMUZAFFAR JAMALenergy_progress
02/07/2025Interior lighting powerMUZAFFAR JAMALenergy_progress
Latest 25 of 47.
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/23/2026B00960299-I1Request digital key ↗
08/23/2026B01140208-I1Request digital key ↗
08/23/2026B00954346-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00954346-P1Open ↗
08/13/2026B00954346-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWProgress Inspector Seal & Signature9
08/30/2026B00960300-I1Open ↗
08/30/2026B00960300-I1Open ↗
08/28/2026B00960300-P1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/23/2026B00954346-I1Open ↗
08/23/2026B00954346-P1Open ↗
08/22/2026B01202077-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
08/30/2026B00960300-I1Open ↗
08/28/2026B00960300-P1Open ↗
08/25/2026B00960300-P2Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection2
▸DOB NOWStreet Tree Checklist2
08/13/2026B00954346-I1Open ↗
08/13/2026B00954346-P1Open ↗
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/23/2026B01140208-I1Open ↗
08/23/2026B00954346-I1Open ↗
08/23/2026B00954346-P1Open ↗
Showing 3 of 6 on file for this type
▸Other Documents11
▸DOB NOWProperty Ownership Certification2
08/23/2026B00954346-I1Open ↗
08/23/2026B00954346-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00954346-P1Open ↗
08/13/2026B00954346-I1Open ↗
▸DOB NOWEvaluation of Adjacent Building Report (BC 1817.3)2
08/13/2026B00954346-P1Open ↗
08/13/2026B00954346-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00954346-I1Open ↗
08/13/2026B00954346-P1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026B00954346-P1Open ↗
08/13/2026B00954346-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026B00954346-I1Open ↗