← Back
Condo, residential unit, 1-3 unit building (orig. class 1)
876 PACIFIC STREET FRONT
BROOKLYN · BIN 3425113
💬 Discuss this project
1930Year Built
2Stories
R6Building Class
R6BZoning
5,040 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Condo, residential unit, 1-3 unit building (orig. class 1) · Owner of record: 876 PACIFIC STREET, LLC · 3,180 sf lot · 1.58 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionOther
Floor 341p · 1 filing · 20 docs
Floor 230p · 1 filing · 20 docs
Floor 131p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
876 PACIFIC STREET1503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PABLO DE MIGUEL1102/07/2024
ENTHINK ENGINEERS LLC102/28/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
IDA GALEA, ARCHITECT2203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TOLLOCAN SHEET METAL INCGeneral Contractor303/21/2026
GW MECHANICALPlumbing303/22/2026
TRIBUTE RESTORATION INCGeneral Contractor207/08/2026
PHOENIX SUTTON STR INCGeneral Contractor107/08/2026
ELPO ELECTRICAL CONTG INCElectrical103/22/2026
SIMPLE CHOICE PLBG AND HTPlumbing107/08/2026
PHOENIX PLMBG & MECH CORPFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
SANTORA ENGINEERING LLC346202/07/2024
MEP INSPECTIONS, INC1102808/10/2023
Building Lifecycle
All (83)Filed (12)Permit Issued (6)Signed Off (5)Violation (20)Inspection (10)Special Inspection (30)
06/26/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/06/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/09/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
B00568283-S5
05/02/2024
Permit issued — Structural
B00568283-S5-ST
03/27/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
B00568283-S3
03/11/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
B00568283-S4
03/11/2024
Signed off — ALT-CO - New Building with Existing Elements to Remain
B00568283-S2
03/07/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/15/2024
Special inspection requirement — Final
GERARD SANTORA
02/15/2024
Special inspection requirement — Structural Steel - Details
GERARD SANTORA
02/15/2024
Special inspection requirement — Structural Steel - Welding
GERARD SANTORA
02/15/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
GERARD SANTORA
02/15/2024
Special inspection requirement — Post-installed Anchors
GERARD SANTORA
02/15/2024
Special inspection requirement — Structural Cold-Formed Steel
GERARD SANTORA
02/15/2024
Special inspection requirement — Masonry
GERARD SANTORA
02/15/2024
Special inspection requirement — Structural Steel - High Strength Bolting
GERARD SANTORA
02/07/2024
Filed — ALT-CO - New Building with Existing Elements to Remain
B00568283-P5
02/01/2024
Permit issued — Mechanical Systems
B00568283-S3-MS
01/31/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/05/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/02/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
12/21/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/18/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/28/2023
Violation issued (HPD, closed)
I
11/10/2023
Signed off — Alteration
INSTALLATION OF TEMPORARY HEAVY DUTY SIDEWALK SHED AS PER PLANS. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED SHALL COMPLY WITH CHAPTER #33 OF 2022 THE NYC BUILDING CODE. LIVE LOAD 300PSF.
B00835917-I1
10/13/2023
Violation issued (HPD, closed)
C
08/18/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
08/10/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
B00568283-P6
08/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
08/07/2023
Permit issued — Sprinklers
B00568283-S4-EW-SP
07/25/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
07/25/2023
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
07/25/2023
Special inspection requirement — Final
Nicolas Crosetto
07/25/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
07/25/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nicolas Crosetto
07/25/2023
Special inspection requirement — Maintenance information
Nicolas Crosetto
07/25/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nicolas Crosetto
07/25/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicolas Crosetto
07/21/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
B00568283-P3
07/21/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
B00568283-P4
07/20/2023
Violation issued (ECB, closed)
Construction
07/20/2023
Violation issued (ECB, closed)
Construction
07/20/2023
Violation issued (ECB, closed)
Construction
06/09/2023
Special inspection requirement — HVAC-R and service water heating equipment
Nicolas Crosetto
06/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
06/09/2023
Special inspection requirement — Sprinkler Systems
Nicolas Crosetto
06/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
06/09/2023
Special inspection requirement — Mechanical Systems
Nicolas Crosetto
06/09/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
06/09/2023
Special inspection requirement — Final
Nicolas Crosetto
06/09/2023
Special inspection requirement — HVAC-R and service water heating system controls
Nicolas Crosetto
06/09/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
Nicolas Crosetto
06/09/2023
Special inspection requirement — Maintenance information
Nicolas Crosetto
06/08/2023
Permit issued — Plumbing
B00568283-S2-PL
06/05/2023
Filed — ALT-CO - New Building with Existing Elements to Remain
B00568283-P2
04/11/2023
Permit issued — General Construction
B00568283-I1-GC
03/07/2023
Special inspection requirement — Fire-Resistance Rated Construction
Nicolas Crosetto
03/07/2023
Special inspection requirement — Energy Code Compliance Inspections
Nicolas Crosetto
03/07/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Nicolas Crosetto
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offTRIBUTE RESTORATION INC05/02/2024
DOB NOWMechanical SystemsSigned-offTOLLOCAN SHEET METAL INC02/01/2024
DOB NOWSprinklersSigned-offGW MECHANICAL CORP08/07/2023
DOB NOWPlumbingSigned-offSIMPLE CHOICE PLBG AND HT06/08/2023
DOB NOWGeneral ConstructionPermit IssuedTRIBUTE RESTORATION INC04/11/2023
DOB NOWSidewalk ShedSigned-offPHOENIX SUTTON STR INC02/28/2023
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR05/03/2017
BISPLISSUEDNCA PLUMBING&HEATING LLC10/28/2016
BISSPISSUEDRICHMOND P & H CO, INC09/29/2016
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR04/05/2016
BIS—ISSUEDAMIN HOME IMPROVEMENTS IN04/01/2016
BISPLISSUEDJ. CAIAZZO PLBG & HTG COR03/21/2016
BISOTISSUEDAMIN HOME IMPROVEMENTS IN12/10/2015
2 projects · most recent 07/21/2023
General Wiring
FiledStatusContractorScope
07/21/2023CompleteSMART ELECTRIC SERVICESGeneral Wiring
02/27/2023CompleteELPO ELECTRICAL CONTG INC—
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
06/26/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/06/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/07/2024Pass-Final CND-Occupancy InspectionPassView ↗
01/31/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
01/05/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/02/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
12/21/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/18/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
08/18/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 51
DateRequirementInspectorRole
02/15/2024FinalGERARD SANTORAprogress
02/15/2024Structural Steel - DetailsGERARD SANTORAspecial
02/15/2024Structural Steel - WeldingGERARD SANTORAspecial
02/15/2024Structural Stability – Alterations of existing buildingsGERARD SANTORAspecial
02/15/2024Post-installed AnchorsGERARD SANTORAspecial
02/15/2024Structural Cold-Formed SteelGERARD SANTORAspecial
02/15/2024MasonryGERARD SANTORAspecial
02/15/2024Structural Steel - High Strength BoltingGERARD SANTORAspecial
08/09/2023Fire-Resistant Penetrations and JointsNicolas Crosettospecial
07/25/2023Fire-Resistant Penetrations and JointsNicolas Crosettospecial
07/25/2023Mechanical SystemsNicolas Crosettospecial
07/25/2023FinalNicolas Crosettoprogress
07/25/2023Energy Code Compliance InspectionsNicolas Crosettoprogress
07/25/2023HVAC-R and service water heating equipmentNicolas Crosettoenergy_progress
07/25/2023Maintenance informationNicolas Crosettoenergy_progress
07/25/2023HVAC-R and service water heating system controlsNicolas Crosettoenergy_progress
07/25/2023HVAC-R and service water piping design and insulationNicolas Crosettoenergy_progress
06/09/2023HVAC-R and service water heating equipmentNicolas Crosettoenergy_progress
06/09/2023Fire-Resistant Penetrations and JointsNicolas Crosettospecial
06/09/2023Sprinkler SystemsNicolas Crosettospecial
06/09/2023Fire-Resistant Penetrations and JointsNicolas Crosettospecial
06/09/2023Mechanical SystemsNicolas Crosettospecial
06/09/2023Energy Code Compliance InspectionsNicolas Crosettoprogress
06/09/2023FinalNicolas Crosettoprogress
06/09/2023HVAC-R and service water heating system controlsNicolas Crosettoenergy_progress
Latest 25 of 51.
▾Documents — 175 on file (BIS + DOB NOW)
▸Plans & Drawings12
▸DOB NOWPlans/Sketch12
08/28/2026B00568283-S3Request digital key ↗
08/28/2026B00568283-I1Request digital key ↗
08/28/2026B00568283-P1Request digital key ↗
Showing 3 of 12 on file for this type
▸Applications & Permits22
▸BISPLAN / WORK APPROVAL APPLICATION13
02/26/2021322088584Open ↗
09/22/2020322088584Open ↗
09/21/2020321752938Open ↗
Showing 3 of 13 on file for this type
▸BISWORK PERMIT APPLICATION4
10/28/2016340405984Open ↗
09/29/2016340405984Open ↗
04/11/2016321267419Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION3
10/22/2016321267419Open ↗
10/07/2016321267419Open ↗
05/04/2016321267419Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
08/09/2016321267419Open ↗
▸BISApplication Withdrawal/Address Change Form OP-1131
08/15/2016321139923Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED2
09/25/2020321752938Open ↗
09/22/2020322088584Open ↗
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026B00568283-I1Open ↗
08/13/2026B00568283-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026B00568283-P1Open ↗
08/13/2026B00568283-I1Open ↗
▸BISTAX LOT: FINAL LOT NUMBER ISSUED1
09/22/2020322088584Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
09/25/2020321752938Open ↗
▸BISZONING DIAGRAM1
04/06/2016321267419Open ↗
▸BISZONING EXHIBIT I: CERTIFICATION1
09/25/2020321752938Open ↗
▸Seals & Professional Certifications43
▸DOB NOWSpecial Inspector Seal & Signature12
09/01/2026B00568283-S3Open ↗
09/01/2026B00568283-P3Open ↗
08/31/2026B00568283-P4Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature12
08/28/2026B00568283-I1Open ↗
08/28/2026B00568283-P6Open ↗
08/28/2026B00568283-P5Open ↗
Showing 3 of 12 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
01/05/2018321267419Open ↗
07/14/2017340405984Open ↗
10/25/2016321267419Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B00568283-S3Open ↗
09/01/2026B00568283-S3Open ↗
09/01/2026B00568283-P3Open ↗
Showing 3 of 7 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
08/01/2016340405984Open ↗
04/06/2016321358945Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION1
08/01/2016340405984Open ↗
▸BISPROFESSIONAL CERTIFIED CHECKLIST1
04/06/2016321358945Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
08/01/2016340405984Open ↗
▸Trade Schedules & Equipment9
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE5
04/12/2016321267419Open ↗
04/06/2016321358945Open ↗
01/28/2016321267419Open ↗
Showing 3 of 5 on file for this type
▸BISSCHEDULE B - PLUMBING2
02/10/2017340405984Open ↗
08/01/2016340405984Open ↗
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026B00568283-I1Open ↗
08/13/2026B00568283-P1Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
12/02/2015321267419Open ↗
09/18/2015321139923Open ↗
▸BISDEMOLITION SUBMITTAL CERTIFICATION FORM1
04/07/2016321267419Open ↗
▸Environmental & Asbestos14
▸DOB NOWDEP ACP-5: Asbestos Assessment Report11
08/28/2026B00568283-S2Open ↗
08/28/2026B00568283-P6Open ↗
08/28/2026B00568283-P5Open ↗
Showing 3 of 11 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)3
04/07/2016321267419Open ↗
04/06/2016321358945Open ↗
09/18/2015321139923Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS6
01/05/2018321267419Open ↗
10/25/2016321267419Open ↗
04/07/2016321267419Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWEN2: As Built Energy Analysis.2
08/13/2026B00568283-I1Open ↗
08/13/2026B00568283-S3Open ↗
▸BISAS-BUILT ENERGY ANALYSIS1
11/03/2016321267419Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY1
08/01/2016340405984Open ↗
▸BISHYDRO FLOW TEST LETTER1
08/01/2016340405984Open ↗
▸BISHYDRAULIC FLOW CALCULATIONS1
08/01/2016340405984Open ↗
▸Approvals, Objections & Sign-offs9
▸BISLETTERS - SUPPORTING DOCUMENTATION5
08/14/2017340405984Open ↗
08/15/2016321139923Open ↗
04/07/2016321267419Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/11/2018321267419Open ↗
01/05/2018321267419Open ↗
08/14/2017340405984Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE1
12/02/2015321267419Open ↗
▸Cost, Insurance & Ownership12
▸BISCOST AFFIDAVIT9
01/11/2018321267419Open ↗
01/05/2018321267419Open ↗
08/14/2017340405984Open ↗
Showing 3 of 9 on file for this type
▸BISCIVIL PENALTY AFFIDAVIT/REQUEST1
02/26/2021322088584Open ↗
▸DOB NOWCertificate of Insurance1
08/13/2026B00568283-I1Open ↗
▸DOB NOWCertification by Insurance Broker or Agency1
08/13/2026B00568283-I1Open ↗
▸Filing & Intake Forms13
▸BISADDITIONAL INFORMATION5
10/11/2017321267419Open ↗
10/25/2016321267419Open ↗
10/12/2016321267419Open ↗
Showing 3 of 5 on file for this type
▸BISEFILING COVER SHEET5
02/26/2021322088584Open ↗
05/07/2018321752938Open ↗
04/01/2016321358945Open ↗
Showing 3 of 5 on file for this type
▸BISBOROUGH INTAKE FORM2
01/11/2018321267419Open ↗
01/05/2018321267419Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
08/01/2016340405984Open ↗
▸Other Documents16
▸BISPLOT DIAGRAM4
02/26/2021321267419Open ↗
09/25/2020321752938Open ↗
09/22/2020322088584Open ↗
Showing 3 of 4 on file for this type
▸BISBPP - SUPPORTING DOCUMENTATION2
09/18/2015321139923Open ↗
09/18/2015321139923Open ↗
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
10/25/2016321267419Open ↗
10/25/2016321267419Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION2
09/25/2020321752938Open ↗
09/25/2020321752938Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026B00568283-P1Open ↗
08/13/2026B00568283-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026B00568283-P1Open ↗
08/13/2026B00568283-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00568283-I1Open ↗
▸DOB NOWAdditional Insured Authorizations1
08/13/2026B00568283-I1Open ↗