876 ROCKAWAY AVENUE
BIN 3430389
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
1 Active Violation ▸FDNY Report ↗
Locations of Work
ArchitectureStructuralElectricalMechanicalGeneralOther
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Filed — no permit issuedNinedot Energy33p · 3 filings · 9 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Property Development Group103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tectonic Engineering Consultants, G308/05/2026
Building Lifecycle
All (41)Filed (3)Violation (1)Objection (22)Special Inspection (15)
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/24/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Structural
08/13/2026
Objection raised — Q-3
08/13/2026
Objection raised — Q-4
08/13/2026
Objection raised — Admin
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Other
08/13/2026
Objection raised — Q-2
08/13/2026
Objection raised — Scope
08/05/2026
Filed — Alteration CO
General construction and structural modifications as per plans filed herewith. Change in use and occupancy as per Schedule of Occupancy.
B01360818-I1
08/05/2026
Filed — Alteration
Solar installation as per plans filed herewith. No change in use, egress, or occupancy.
B01360821-I1
08/05/2026
Filed — Alteration
BESS installation as per plans filed herewith. No change in use, egress, or occupancy. This application is in conjunction with existing Alt-CO filing B01360818-I1
B01360820-I1
07/20/2026
Special inspection requirement — Concrete - Cast-In-Place
07/20/2026
Special inspection requirement — Masonry
07/20/2026
Special inspection requirement — Post-installed Anchors
07/20/2026
Special inspection requirement — Structural Steel - Details
07/20/2026
Special inspection requirement — Structural Steel - High Strength Bolting
07/20/2026
Special inspection requirement — Subgrade Inspections
07/20/2026
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
07/20/2026
Special inspection requirement — Post-installed Anchors
07/20/2026
Special inspection requirement — Energy Code Compliance Inspections
02/17/2026
Special inspection requirement — Energy Code Compliance Inspections
02/17/2026
Special inspection requirement — Final
02/17/2026
Special inspection requirement — Final
02/17/2026
Special inspection requirement — Final
02/17/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
02/11/2026
Violation issued (ECB, open)
Unknown
Nothing on file for this building.
2 projects · most recent 08/05/2026
Concrete
FiledStatusContractorScope
08/05/2026——2 scope_items
08/05/2026——Concrete
1 project · most recent 08/05/2026
FiledStatusContractorScope
08/05/2026——32 panels, 9,832 kw
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/20/2026Concrete - Cast-In-Place—special
07/20/2026Masonry—special
07/20/2026Post-installed Anchors—special
07/20/2026Structural Steel - Details—special
07/20/2026Structural Steel - High Strength Bolting—special
07/20/2026Subgrade Inspections—special
07/20/2026Subsurface Conditions – Fill Placement & In-Place Density—special
07/20/2026Energy Code Compliance Inspections—progress
07/20/2026Post-installed Anchors—special
07/20/2026Energy Code Compliance Inspections—progress
02/17/2026Energy Code Compliance Inspections—progress
02/17/2026Final—progress
02/17/2026Final—progress
02/17/2026Final—progress
02/17/2026Fire-Resistant Penetrations and Joints—special
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Ninedot EnergyIndustrial / Warehouse—
Project B01360820 Alteration · Objections · 08/05/2026
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 9 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
08/16/2026B01360818-I1Request digital key ↗
08/16/2026B01360821-I1Request digital key ↗
08/16/2026B01360820-I1Request digital key ↗
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/16/2026B01360818-I1Open ↗
▸DOB NOWZoning Exhibit form (1-5)1
08/16/2026B01360818-I1Open ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
08/16/2026B01360818-I1Open ↗
08/16/2026B01360820-I1Open ↗
08/16/2026B01360821-I1Open ↗
▸Other Documents1
▸DOB NOWProperty Ownership Certification1
08/16/2026B01360818-I1Open ↗