ECB04/23/2024WORK WITHOUT A PERMIT. 1ST FLOOR, FULL HEIGHT PARTITION WALLS WERE ERECTED TO CREATE BATHROOM AND 2 ROOMS, WATER AND WASTE LINES WERE INSTALLED, RESIDENTIAL SINK AND ELECTRICAL WIRING, OBTAIN ALL PERMITS; OBTAI$6K due
ECB02/21/2024RESPONDENT ISSUED RCA THAT WAS DUE TO BE CORRECTED BY 03-20-2022 FOR ON THE 1ST FLOOR NO VENTILATION FOR THE BOILER THAT IS NOT CODE COMPLIANT, ON THE 2ND FLOOR NOT CODE COMPLIANT FLEX EXHAUST USED FOR THE GAS$6K due
ECB02/21/2024RESPONDENT ISSUED RCA THAT WAS DUE TO BE CORRECTED BY 03-20-2022 FOR GAS BEING SUPPLIED TO THE BUILDING WITHOUT DOB AUTHORIZATION AFTER NEW GAS APPLIANCES WERE INSTALLED ON THE 1ST FLOOR BOILER ALSO REPLACED ON$25K due
ECB02/21/2024RESPONDENT ISSUED RCA THAT WAS DUE TO BE CORRECTED BY 03-20-2022 FOR NEW GAS APPLIANCES ON THE 1ST FLOOR BOILER INSTALLED AND 2ND FLOOR DRYER, HOT WATER HEATER AND FURNACE REPLACED THAT HAVE NOT BEEN TESTED. FA$12K due
ECB02/21/2024RESPONDENT ISSUED RCA THAT WAS DUE TO BE CORRECTED BY 03-20-2022 FOR ON THE 1ST FLOOR A BOILER AND FULL BATHROOM INSTALLED WITHOUT A PERMIT, ALSO ON THE 2ND FLOOR UTILITY ROOM GAS DRYER, GAS FURNACE AND GAS HOT$12K due