Primarily 2 family with 1 store or office
877 HUGUENOT AVENUE
STATEN ISLAND · Annadale-Huguenot-Prince's Bay-Woodrow · BIN 5081450
💬 Discuss this project
1930Year Built
3Stories
S2Building Class
R3XZoning
4,512 sfGross Floor Area
3Units
Rent Stabilized0 Open ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: 877 HUGENOT, LLC · 18,626 sf lot · 0.24 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 317p · 1 filing · 20 docs
Floor 211p · 1 filing · 20 docs
Floor 117p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NATES MANAGEMENT1907/08/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ROGERS CALVANICO GROUP PLLC602/28/2025
MICHAEL DERUVO & ASSOC. ARCHITECTS209/04/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
PATRICIA L. GASS403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
HUDSON CONTRACTING GROUPGeneral Contractor707/08/2026
ALEXANDER LEVINElectrical103/21/2026
LEVIN ALEXANDERElectrical103/21/2026
RITE-FLO P.H.& COOLING INPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ROGERS CALVANICO GROUP PL1324202/28/2025
A TECH ENGINEERING NYC, P6738105/17/2024
Building Lifecycle
All (50)Filed (8)Permit Issued (6)Signed Off (1)Violation (8)Inspection (3)Objection (4)Special Inspection (20)
06/22/2026
Signed off — Alteration
HVAC APPLICATION & PLAN TO ADD DUCTED HEAT PUMP UNITS TO EXISTING APARTMENTS. ADD ELECTRIC HOT WATER HEATERS RECONNECTING TO EXIST DISTRIBUTION. NO CHANGE TO EXISTING HTG OR HOT WATER SYSTEM UNDER THIS APPLICATION.
S08016938-I1
03/03/2025
Special inspection requirement — Maintenance information
KEVIN MICK
03/03/2025
Special inspection requirement — HVAC-R and service water heating system controls
KEVIN MICK
03/03/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
KEVIN MICK
03/03/2025
Special inspection requirement — HVAC-R and service water heating equipment
KEVIN MICK
03/03/2025
Special inspection requirement — Mechanical Systems
KEVIN MICK
03/03/2025
Special inspection requirement — Final
KEVIN MICK
03/03/2025
Special inspection requirement — Energy Code Compliance Inspections
KEVIN MICK
02/28/2025
Filed — Alteration
HVAC APPLICATION & PLAN TO ADD DUCTED HEAT PUMP UNITS TO EXISTING APARTMENTS. ADD ELECTRIC HOT WATER HEATERS RECONNECTING TO EXIST DISTRIBUTION. NO CHANGE TO EXISTING HTG OR HOT WATER SYSTEM UNDER THIS APPLICATION.
S08016938-P2
09/17/2024
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
09/10/2024
Permit issued — General Construction
S08016938-S3-GC
09/10/2024
Objection resolved — Addressed
09/09/2024
Objection raised — Other
09/04/2024
Filed — Alteration
APPLICATION FILED HEREWITH TO INSTALL NEW GAS METER AND NEW GAS EQUIPMENT AT FIRST FLOOR COMMERCIAL BUILDING.
S01051674-P1
08/29/2024
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
08/28/2024
Filed — Alteration
HVAC APPLICATION & PLAN TO ADD DUCTED HEAT PUMP UNITS TO EXISTING APARTMENTS. ADD ELECTRIC HOT WATER HEATERS RECONNECTING TO EXIST DISTRIBUTION. NO CHANGE TO EXISTING HTG OR HOT WATER SYSTEM UNDER THIS APPLICATION.
S08016938-S3
08/24/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/08/2024
Permit issued — General Construction
S08016938-S2-GC
08/06/2024
Permit issued — Mechanical Systems
S08016938-I1-MS
06/07/2024
Permit issued — Plumbing
S01051674-I1-PL
06/04/2024
Objection resolved — Addressed
05/23/2024
Objection raised — Other
05/17/2024
Filed — Alteration
HVAC APPLICATION & PLAN TO ADD DUCTED HEAT PUMP UNITS TO EXISTING APARTMENTS. ADD ELECTRIC HOT WATER HEATERS RECONNECTING TO EXIST DISTRIBUTION. NO CHANGE TO EXISTING HTG OR HOT WATER SYSTEM UNDER THIS APPLICATION.
S08016938-S2
05/17/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
05/15/2024
Filed — Alteration
APPLICATION FILED HEREWITH TO INSTALL NEW GAS METER AND NEW GAS EQUIPMENT AT FIRST FLOOR COMMERCIAL BUILDING.
S01051674-I1
04/17/2024
Violation issued (ECB, closed)
Construction
04/10/2024
Permit issued — Mechanical Systems
S08016938-I1-MS
01/02/2024
Permit issued — Mechanical Systems
S08016938-I1-MS
12/19/2023
Filed — Alteration
HVAC APPLICATION & PLAN TO ADD DUCTED HEAT PUMP UNITS TO EXISTING APARTMENTS. ADD ELECTRIC HOT WATER HEATERS RECONNECTING TO EXIST DISTRIBUTION. NO CHANGE TO EXISTING HTG OR HOT WATER SYSTEM UNDER THIS APPLICATION.
S08016938-P1
12/12/2023
Special inspection requirement — Mechanical Systems
12/12/2023
Special inspection requirement — Final
12/12/2023
Special inspection requirement — HVAC-R and service water heating system controls
12/12/2023
Special inspection requirement — Maintenance information
12/12/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
12/12/2023
Special inspection requirement — HVAC-R and service water heating equipment
12/12/2023
Special inspection requirement — Energy Code Compliance Inspections
07/20/2023
Violation issued (FDNY_NOV, closed)
07/20/2023
Violation issued (FDNY_NOV, closed)
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/30/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/28/2022
Filed — Alteration
HVAC APPLICATION & PLAN TO ADD DUCTED HEAT PUMP UNITS TO EXISTING APARTMENTS. ADD ELECTRIC HOT WATER HEATERS RECONNECTING TO EXIST DISTRIBUTION. NO CHANGE TO EXISTING HTG OR HOT WATER SYSTEM UNDER THIS APPLICATION.
S08016938-S1
11/28/2022
Special inspection requirement — Maintenance information
11/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
11/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
11/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
11/23/2022
Filed — Alteration
HVAC APPLICATION & PLAN TO ADD DUCTED HEAT PUMP UNITS TO EXISTING APARTMENTS. ADD ELECTRIC HOT WATER HEATERS RECONNECTING TO EXIST DISTRIBUTION. NO CHANGE TO EXISTING HTG OR HOT WATER SYSTEM UNDER THIS APPLICATION.
S08016938-I1
04/22/2021
Violation issued (HPD, closed)
I
10/31/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedHUDSON CONTRACTING GROUP09/10/2024
DOB NOWGeneral ConstructionPermit IssuedHUDSON CONTRACTING GROUP08/08/2024
DOB NOWMechanical SystemsSigned-offHUDSON CONTRACTING GROUP08/06/2024
DOB NOWPlumbingSigned-offDJ PLUMBING & HEATING COR06/07/2024
DOB NOWMechanical SystemsSigned-offHUDSON CONTRACTING GROUP04/10/2024
DOB NOWMechanical SystemsSigned-offHUDSON CONTRACTING GROUP01/02/2024
BISFPISSUEDFIRE COMMAND CO, INC09/28/2017
BISPLISSUEDTRISTAR PLUMBING & HTG IN07/27/2017
BISOTISSUEDP. LINO INC07/12/2017
BISOTISSUEDALCO STORE DEVELOPMENT CORP08/03/2016
BISOTISSUEDALCO STORE DEVELOPMENT CORP05/25/2016
1 project · most recent 02/28/2025
Air Conditioning Systems Heating Systems
FiledStatusContractorScopeMake / Model / Capacity
02/28/2025Permit IssuedHUDSON CONTRACTING GROUPAir Conditioning Systems, Heating Systems
Cooling
Mitsubishi Electric SVZ-KP36NAMX (2-HP-1) , SUZ-KA36NAHZ (CU-1), PVFY-P36NAMU-E1 (3-HP-1), MXZ-SM36NAMHZ (CU-2) 36,000 BTU · Heat Pump Outdoor ×8
PVFY-P36 NAMU-E1 36,000 BTU · Vrf Indoor ×2
Heating
Mitsubishi Electric SVZ-KP36NAMX (2-HP-1) , SUZ-KA36NAHZ (CU-1), PVFY-P36NAMU-E1 (3-HP-1), MXZ-SM36NAMHZ (CU-2) 36,000 BTU · Heat Pump Outdoor ×8
MXZ-SM36 NAMHZ 36,000 BTU · Vrf Outdoor ×2
PVFY-P36NAMU-E1 36,000 BTU · Vrf Indoor ×2
2 projects · most recent 02/28/2025
Water/Sanitary Gas
FiledStatusContractorScope
02/28/2025——Water/Sanitary
09/04/2024Signed-offRITE-FLO P.H.& COOLING INGas
2 projects · most recent 09/26/2024
General Wiring
FiledStatusContractorScope
09/26/2024CompleteA.L. ELECTRICAL CORP.General Wiring
07/17/2024Permit IssuedDAGNACHEW & ASSOCIATES IN5 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
09/17/2024Pass-Final PL - Up to 3 Requested FloorsPassView ↗
08/29/2024Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/24/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 20
DateRequirementInspectorRole
03/03/2025Maintenance informationKEVIN MICKenergy_progress
03/03/2025HVAC-R and service water heating system controlsKEVIN MICKenergy_progress
03/03/2025HVAC-R and service water piping design and insulationKEVIN MICKenergy_progress
03/03/2025HVAC-R and service water heating equipmentKEVIN MICKenergy_progress
03/03/2025Mechanical SystemsKEVIN MICKspecial
03/03/2025FinalKEVIN MICKprogress
03/03/2025Energy Code Compliance InspectionsKEVIN MICKprogress
05/17/2024Fire-Resistant Penetrations and Jointsanthony santorospecial
12/12/2023Mechanical Systems—special
12/12/2023Final—progress
12/12/2023HVAC-R and service water heating system controls—energy_progress
12/12/2023Maintenance information—energy_progress
12/12/2023HVAC-R and service water piping design and insulation—energy_progress
12/12/2023HVAC-R and service water heating equipment—energy_progress
12/12/2023Energy Code Compliance Inspections—progress
11/28/2022Maintenance information—energy_progress
11/28/2022HVAC-R and service water piping design and insulation—energy_progress
11/28/2022HVAC-R and service water heating system controls—energy_progress
11/28/2022HVAC-R and service water heating equipment—energy_progress
11/28/2022Energy Code Compliance Inspections—progress
▾Documents — 85 on file (BIS + DOB NOW)
▸Plans & Drawings8
▸DOB NOWPlans/Sketch8
08/21/2026S01051674-P1Request digital key ↗
08/21/2026S01051674-I1Request digital key ↗
08/21/2026S08016938-I1Request digital key ↗
Showing 3 of 8 on file for this type
▸Applications & Permits12
▸BISPLAN / WORK APPROVAL APPLICATION7
12/11/2017540140426Open ↗
10/03/2017520305161Open ↗
09/27/2017540135780Open ↗
Showing 3 of 7 on file for this type
▸BISWORK PERMIT APPLICATION5
09/27/2017540135780Open ↗
08/10/2017520305161Open ↗
08/01/2017520305161Open ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications28
▸DOB NOWDPL-1: Design Professional Seal & Signature8
08/21/2026S08016938-S1Open ↗
08/21/2026S08016938-I1Open ↗
08/21/2026S08016938-P2Open ↗
Showing 3 of 8 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION6
02/22/2019520226540Open ↗
02/22/2019520226540Open ↗
07/25/2017520305161Open ↗
Showing 3 of 6 on file for this type
▸BISPROFESSIONAL CERTIFICATION STATEMENT4
12/11/2017540140426Open ↗
09/27/2017540135780Open ↗
07/25/2017520305161Open ↗
Showing 3 of 4 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
07/25/2017520305161Open ↗
05/13/2016520226540Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
12/11/2017540140426Open ↗
09/27/2017540135780Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
12/11/2017540140426Open ↗
09/27/2017540135780Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026S08016938-I1Open ↗
08/22/2026S08016938-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/23/2026S08016938-S2Open ↗
08/22/2026S08016938-I1Open ↗
▸Trade Schedules & Equipment2
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
09/11/2017520305161Open ↗
07/25/2017520305161Open ↗
▸Safety & Tenant Protection1
▸BISTENANT PROTECTION PLAN AND NOTES1
12/11/2017540140426Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026S08016938-I1Open ↗
08/21/2026S08016938-P2Open ↗
08/21/2026S08016938-S3Open ↗
Showing 3 of 6 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
12/11/2017540140426Open ↗
05/13/2016520226540Open ↗
▸Inspections & Test Reports4
▸BISTECHNICAL REPORT: RESPONSIBILITY3
09/08/2020540135780Open ↗
12/11/2017540140426Open ↗
09/27/2017540135780Open ↗
▸BISDOB FINAL INSPECTION REQUIRED1
07/20/2020520305161Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST5
09/08/2020540135780Open ↗
08/14/2020520305161Open ↗
02/28/2019520226540Open ↗
Showing 3 of 5 on file for this type
▸BISADMINISTRATIVE OBJECTIONS2
07/25/2017520305161Open ↗
05/13/2016520226540Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION1
09/27/2017540135780Open ↗
▸Cost, Insurance & Ownership8
▸BISCOST AFFIDAVIT8
09/08/2020540135780Open ↗
02/22/2019520226540Open ↗
02/22/2019520305161Open ↗
Showing 3 of 8 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET2
07/25/2017520305161Open ↗
05/13/2016520226540Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
12/11/2017540140426Open ↗
09/27/2017540135780Open ↗
▸BISBOROUGH INTAKE FORM2
02/22/2019520226540Open ↗
02/22/2019520305161Open ↗