← Back
Two family frame
877 SINCLAIR AVENUE
STATEN ISLAND · BIN 5174989
💬 Discuss this project
0Year Built
3Stories
B2Building Class
R3XZoning
2,511 sfGross Floor Area
2Units
Two family frame · 4,225 sf lot · 0.59 FAR built · Flood zone X
Locations of Work
Fire Protection
Floor 22p · 1 filing · 6 docs
Floor 1
Basement2p · 1 filing · 6 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
FASBUILDINGCORP1707/08/2026
875 SINCLAIR AVENUE503/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
STANLEY M. KREBUSHEVSKI, R.A.211/10/2022
WILLIAM MONTAGUE ENGINEER110/17/2022
C&P DESIGN CONSULTANTS210/14/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
MPC PLUMBING & HEATING INCPlumbing207/08/2026
MERCURY FIRE SUPP INCFire Protection107/08/2026
FAS BUILDING CORPGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738211/10/2022
SRA PLANNING & EXPEDITING5677211/10/2022
C&P DESIGN CONSULTANT8472210/14/2022
Building Lifecycle
All (31)Filed (5)Permit Issued (4)Signed Off (3)Inspection (9)Special Inspection (10)
12/22/2022
Signed off — Alteration
Plumbing work filed in conjuction with NB application for a two family residence.
S00465916-I1
12/21/2022
Signed off — Alteration
Installation of New sprinkler System with booster pump, New Combined water service with BFPA
S00793609-I1
12/08/2022
Signed off — Alteration
PROPOSED 9' CURB CUT
S00465910-I1
12/07/2022
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
11/25/2022
Permit issued — Curb Cut
S00465910-I1-CC
11/15/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
11/15/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
11/15/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
11/14/2022
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
11/10/2022
Filed — Alteration
Plumbing work filed in conjuction with NB application for a two family residence.
S00465916-P1
11/09/2022
Special inspection requirement — Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilities
anthony santoro
11/09/2022
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
11/09/2022
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM MONTAGUE
11/08/2022
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
11/07/2022
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
11/01/2022
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
10/26/2022
Permit issued — Sprinklers
S00793609-I1-EW-SP
10/25/2022
Permit issued — Sprinklers
S00793609-I1-PL
10/17/2022
Filed — Alteration
PROPOSED 9' CURB CUT
S00465910-I1
10/17/2022
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
10/17/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
10/14/2022
Filed — Alteration
Installation of New sprinkler System with booster pump, New Combined water service with BFPA
S00793609-P1
10/14/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Stanislav Pilipenko
10/14/2022
Special inspection requirement — Sprinkler Systems
Stanislav Pilipenko
08/17/2022
Filed — Alteration
Installation of New sprinkler System with booster pump, New Combined water service with BFPA
S00793609-I1
08/11/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
08/11/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
05/10/2022
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
05/04/2022
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/26/2022
Permit issued — Plumbing
S00465916-I1-PL
03/23/2022
Filed — Alteration
Plumbing work filed in conjuction with NB application for a two family residence.
S00465916-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWCurb CutSigned-offFAS BUILDING CORP11/25/2022
DOB NOWSprinklersSigned-offMERCURY FIRE SUPP INC10/26/2022
DOB NOWSprinklersSigned-offMPC PLUMBING & HEATING IN10/25/2022
DOB NOWPlumbingSigned-offMPC PLUMBING & HEATING IN04/26/2022
BIS—ISSUEDFAS BUILDING CORP04/04/2022
1 project · most recent 05/24/2022
General Wiring
FiledStatusContractorScope
05/24/2022CompleteS.T.K. ELECTRICAL CORP.General Wiring
▾Field Inspections (DOB CAP) — 9
DateTypeResultReport
12/07/2022Pass-Final Curb Cut Non-Directive 14PassView ↗
11/14/2022Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
11/08/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
11/07/2022Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
11/01/2022Fail-Final PL - Up to 3 Requested FloorsFailView ↗
08/11/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
08/11/2022Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
05/10/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
05/04/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
11/15/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
11/15/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/15/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
11/09/2022Soil Percolation Test - Private On-Site Storm Water Drainage Disposal Systems, and Detention Facilitiesanthony santorospecial
11/09/2022Subsurface Investigations (Borings/Test Pits)anthony santorospecial
11/09/2022Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM MONTAGUEspecial
10/17/2022Sprinkler SystemsStanislav Pilipenkospecial
10/17/2022Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
10/14/2022Fire-Resistant Penetrations and JointsStanislav Pilipenkospecial
10/14/2022Sprinkler SystemsStanislav Pilipenkospecial
▾Documents — 101 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch - Plumbing2
08/23/2026S00465916-I1Request digital key ↗
08/23/2026S00465916-P1Request digital key ↗
▸DOB NOWPlans/Sketch2
08/24/2026S00793609-I1Request digital key ↗
08/24/2026S00793609-P1Request digital key ↗
▸DOB NOWPlans/Sketch - Curb Cut1
08/23/2026S00465910-I1Request digital key ↗
▸Applications & Permits7
▸BISPLAN / WORK APPROVAL APPLICATION3
01/10/2022540212214Open ↗
11/22/2021540196633Open ↗
03/08/2021540196633Open ↗
▸BISWORK PERMIT APPLICATION2
04/05/2022540196633Open ↗
04/04/2022540196633Open ↗
▸BISCERTIFICATE OF OCCUPANCY: APPLICATION1
09/20/2022540196633Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
03/16/2022540212214Open ↗
▸Zoning, Tax Lot & Property Records4
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
03/08/2021540196633Open ↗
▸BISZONING EXHIBIT III:DESC. & OWNRSHP.STMNT1
11/22/2021540196633Open ↗
▸BISVERIFY TAX LOT1
10/17/2022540196633Open ↗
▸BISZONING DIAGRAM1
03/17/2022540196633Open ↗
▸Seals & Professional Certifications19
▸DOB NOWSpecial Inspector Seal & Signature8
09/23/2026S00793609-I1Open ↗
09/23/2026S00793609-I1Open ↗
08/27/2026S00465916-I1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00465910-I1Open ↗
08/13/2026S00793609-I1Open ↗
08/13/2026S00465916-P1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
01/10/2022540212214Open ↗
03/08/2021540196633Open ↗
▸BISAPPLICANT OWNER SIGNATURE2
01/10/2022540212214Open ↗
03/08/2021540196633Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION2
01/03/2023540196633Open ↗
01/03/2023540196633Open ↗
▸Trade Schedules & Equipment7
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)2
11/22/2022540196633Open ↗
08/31/2021540196633Open ↗
▸BISHVAC & SERVICE WATER HEATING EQUIPMENT1
11/21/2022540196633Open ↗
▸BISHVAC & SERVICE WATER HEATING SYSTEM CONTROLS1
11/21/2022540196633Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
08/31/2021540196633Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
12/07/2022540196633Open ↗
▸BISDETECTOR:CARBON MONOXIDE-CERT.OF INSTALL1
12/07/2022540196633Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
03/17/2022540196633Open ↗
▸BISSTREET TREE CHECKLIST1
03/08/2021540196633Open ↗
▸BISSTREET TREE SIGNOFF1
10/17/2022540196633Open ↗
▸Energy Compliance12
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
12/29/2022540196633Open ↗
08/31/2021540196633Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL1
11/21/2022540196633Open ↗
▸BISTR8: ENERGY CODE PROGRESS INSPS TECHNICAL REPORT1
08/31/2021540196633Open ↗
▸BISINTERIOR LIGHTING POWER1
11/21/2022540196633Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING1
11/21/2022540196633Open ↗
▸BISFENESTRATION AREAS1
11/21/2022540196633Open ↗
▸BISAIR SEALING AND INSULATION - TESTING1
11/21/2022540196633Open ↗
▸BISINSULATION PLACEMENT & R VALUES1
11/21/2022540196633Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
11/21/2022540196633Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
11/21/2022540196633Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY FOR ENERGY CODE PROGRESS INSPECTIONS1
03/08/2021540196633Open ↗
▸Inspections & Test Reports16
▸BISTECHNICAL REPORT: CONCRETE DESIGN MIX2
03/18/2022540196633Open ↗
03/17/2022540196633Open ↗
▸BISTECHNICAL REPORT: RESPONSIBILITY2
08/31/2021540196633Open ↗
08/31/2021540196633Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026S00465916-P1Open ↗
08/13/2026S00465916-I1Open ↗
▸BISCONCRETE - CAST-IN-PLACE1
11/21/2022540196633Open ↗
▸BISSUBSURFACE / SOILS INVESTIGATION (BORINGS/TEST PITS)1
01/03/2023540196633Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
11/21/2022540196633Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
11/21/2022540196633Open ↗
▸BISFOOTING AND FOUNDATION INSPECTION1
11/21/2022540196633Open ↗
▸BISBPP-9 - Request for Builders Pavement Field Inspection1
01/10/2022540212214Open ↗
▸BISSUBGRADE INSP / SOILS-SITE PREP1
11/21/2022540196633Open ↗
▸BISSOIL REPORT1
08/31/2021540196633Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
08/31/2021540196633Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00465916-I1Open ↗
▸Approvals, Objections & Sign-offs5
▸BISBSA/CPC APPROVAL2
03/17/2022540196633Open ↗
03/17/2022540196633Open ↗
▸BISSCHEDULE A - OCCUPANCY / USE2
11/22/2021540196633Open ↗
08/31/2021540196633Open ↗
▸BISCPC APPROVAL FOR SCHOOL SEATS.1
08/31/2021540196633Open ↗
▸Filing & Intake Forms5
▸BISADDITIONAL INFORMATION2
08/31/2021540196633Open ↗
08/31/2021540196633Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET2
01/10/2022540212214Open ↗
03/08/2021540196633Open ↗
▸BISAI1 ECC OBJECTIONS RESPONSE1
08/31/2021540196633Open ↗
▸Other Documents11
▸BISSUSTAINABLE ROOF ZONE FORM1
03/08/2021540196633Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS)1
11/21/2022540196633Open ↗
▸BISMAINTENANCE INFORMATION1
11/21/2022540196633Open ↗
▸BISHVAC & SERVICE WATER PIPING DESIGN AND INSULATION1
11/21/2022540196633Open ↗
▸BISPERMANENT CERTIFICATE1
11/21/2022540196633Open ↗
▸BISBPP: FILING REQUIRED1
03/17/2022540196633Open ↗
▸BISWAIVER OF CURB ALIGNMENT1
03/16/2022540212214Open ↗
▸BISDUCT DESIGN, INSULATION AND LEAKAGE TESTING1
11/21/2022540196633Open ↗
▸BISVENTILATION AND AIR DISTRIBUTION SYSTEM1
11/21/2022540196633Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION1
01/10/2022540212214Open ↗
▸BISPLOT DIAGRAM1
03/08/2021540196633Open ↗