← Back
Three families
8778 24 AVENUE
BROOKLYN · Gravesend (West) · BIN 3185957
💬 Discuss this project
1960Year Built
3Stories
C0Building Class
R5Zoning
2,308 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations ▸FDNY Report ↗
Three families · 2,981 sf lot · 0.77 FAR built · Flood zone X500
Locations of Work
ArchitecturePlumbingGeneral
Floor 32p · 1 filing · 12 docs
Floor 26p · 2 filings · 18 docs
Floor 11p · 2 filings · 18 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
08/12/2025$990K—— → —$429/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
PAUL ENGR. INSP. (PEI) CONSULTANTS611/20/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ECDESIGN STUDIO1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
KALE CONSTRUCTION INCGeneral Contractor107/08/2026
CATMAN PLUMBING INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
PAUL ENGINEERING INSPECTI4672311/20/2025
Building Lifecycle
All (36)Filed (6)Permit Issued (2)Signed Off (2)Violation (12)Inspection (5)Special Inspection (9)
01/22/2026
Signed off — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01282971-I1
01/22/2026
Signed off — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBINED BOILERS IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01282973-I1
01/21/2026
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
01/07/2026
Inspection — Fail-Final General Construction Non-Directive 14
Fail
View inspection ↗
11/24/2025
Violation issued (HPD, open)
I
11/20/2025
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBINED BOILERS IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01282973-P2
11/20/2025
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01282971-P2
11/20/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hugues Paul
11/20/2025
Special inspection requirement — Energy Code Compliance Inspections
Hugues Paul
11/20/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hugues Paul
11/19/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hugues Paul
11/19/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hugues Paul
11/19/2025
Special inspection requirement — Energy Code Compliance Inspections
Hugues Paul
10/23/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
10/23/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
10/21/2025
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
10/08/2025
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01282971-P1
10/08/2025
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBINED BOILERS IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01282973-P1
10/07/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Hugues Paul
10/07/2025
Special inspection requirement — Energy Code Compliance Inspections
Hugues Paul
10/07/2025
Special inspection requirement — Fire-Resistance Rated Construction
Hugues Paul
09/18/2025
Permit issued — Plumbing
B01282973-I1-PL
09/17/2025
Permit issued — General Construction
B01282971-I1-GC
09/16/2025
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH GENERAL CONSTRUCTION:NEW PARTITIONS, DOORS, FLOORING AND COSMETIC WORK; NO CHANGE IN USE,EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01282971-I1
09/16/2025
Filed — Alteration
RENOVATION OF EXISTING 1ST, 2ND AND 3RD FLOOR WITH PLUMBING WORK: RELOCATE KITCHEN AND BATHROOM FIXTURES; NEW COMBINED BOILERS IN 1ST FLOOR; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
B01282973-I1
12/04/2024
Violation issued (HPD, closed)
I
11/28/2023
Violation issued (HPD, closed)
I
11/17/2022
Violation issued (HPD, closed)
I
03/16/2022
Violation issued (HPD, closed)
I
04/21/2021
Violation issued (HPD, closed)
I
02/24/2008
Violation issued (HPD, open)
C
02/24/2008
Violation issued (HPD, open)
B
02/24/2008
Violation issued (HPD, open)
B
02/24/2008
Violation issued (HPD, open)
B
02/24/2008
Violation issued (HPD, open)
B
02/24/2008
Violation issued (HPD, open)
B
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offCATMAN PLUMBING INC09/18/2025
DOB NOWGeneral ConstructionSigned-offKALE CONSTRUCTION INC09/17/2025
1 project · most recent 09/29/2025
General Wiring
FiledStatusContractorScope
09/29/2025CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
01/21/2026Pass-Final General Construction Non-Directive 14PassView ↗
01/07/2026Fail-Final General Construction Non-Directive 14FailView ↗
10/23/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
10/23/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
10/21/2025Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
11/20/2025Fire-Resistant Penetrations and JointsHugues Paulspecial
11/20/2025Energy Code Compliance InspectionsHugues Paulprogress
11/20/2025Fire-Resistance Rated ConstructionHugues Paulprogress
11/19/2025Fire-Resistance Rated ConstructionHugues Paulprogress
11/19/2025Fire-Resistant Penetrations and JointsHugues Paulspecial
11/19/2025Energy Code Compliance InspectionsHugues Paulprogress
10/07/2025Fire-Resistant Penetrations and JointsHugues Paulspecial
10/07/2025Energy Code Compliance InspectionsHugues Paulprogress
10/07/2025Fire-Resistance Rated ConstructionHugues Paulprogress
▾Documents — 18 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/20/2026B01282971-P2Request digital key ↗
08/20/2026B01282971-P1Request digital key ↗
08/20/2026B01282971-I1Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications12
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/20/2026B01282971-P1Open ↗
08/20/2026B01282971-I1Open ↗
08/20/2026B01282973-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
08/31/2026B01282971-P1Open ↗
08/29/2026B01282971-P2Open ↗
08/26/2026B01282971-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature3
08/31/2026B01282971-P1Open ↗
08/29/2026B01282971-P2Open ↗
08/26/2026B01282971-I1Open ↗