← Back
BuildNYC
Primarily 2 family with 1 store or office
878 CASTLETON AVENUE
STATEN ISLAND · BIN 5175921
💬 Discuss this project
2023Year Built
3Stories
S2Building Class
R3XZoning
3,728 sfGross Floor Area
3Units
Rent Stabilized0 Active ViolationsFDNY Report ↗
Primarily 2 family with 1 store or office · Owner of record: Giselle Properties · 3,977 sf lot · 0.94 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Attic2p · 1 filing · 3 docs
Floor 318p · 2 filings · 20 docs
Floor 217p · 2 filings · 20 docs
Floor 1Proposed office build out28p · 3 filings · 20 docs
Site & exteriorAdult Health Modern Wellness2p · 1 filing · 3 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Giselle Properties103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Richard Wainer Architect108/04/2025
Island Associates305/21/2025
Joseph M. Morace, A.I.A., Architect507/26/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Island Associates803/21/2026
Louis Striar203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Wallace Avenue ConstructionGeneral Contractor803/21/2026
Flow-Right Plumbing & HeatingPlumbing407/08/2026
A1 SpecializedSign hanger107/08/2026
Flow-Right Fire SuppFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Island Engineering Associates264307/26/2024
Building Lifecycle
All (69)Filed (9)Permit Issued (10)Signed Off (6)Violation (4)Inspection (10)Special Inspection (30)
08/27/2025
Signed off — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - ADULT HEALTH NP MODERN WELLNESS PRACTICE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01260925-I1
08/25/2025
Signed off — Alteration
Minor plumbing work to existing building
S01227961-I1
08/25/2025
Signed off — Alteration
Minor plumbing work to existing building
S01227961-S1
08/14/2025
Inspection — Pass-Final General Construction Non-Directive 14
Pass
View inspection ↗
08/06/2025
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
08/05/2025
Permit issued — Sign
S01260925-I1-SG
08/04/2025
Filed — Alteration
NON-ILLUMINATED NON-ADVERTISING ACCESSORY WALL SIGN - ADULT HEALTH NP MODERN WELLNESS PRACTICE. NO CHANGE OF USE, EGRESS OR OCCUPANCY.
S01260925-I1
08/04/2025
Special inspection requirement — Final
Richard Wainer
07/02/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
06/10/2025
Permit issued — Plumbing
S01227961-S1-PL
06/09/2025
Permit issued — General Construction
S01227961-I1-GC
05/21/2025
Filed — Alteration
Minor plumbing work to existing building
S01227961-S1
05/20/2025
Filed — Alteration
Minor plumbing work to existing building
S01227961-I1
08/21/2024
Special inspection requirement — Structural Steel - Details
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Masonry
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Structural Steel - High Strength Bolting
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Structural Wood Frame
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Fire-Resistance Rated Construction
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Final
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Energy Code Compliance Inspections
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Footing and Foundation
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — HVAC-R and service water heating system controls
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Subgrade Inspections
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Lighting controls
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Lighting in dwelling units
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Maintenance information
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Duct leakage testing, insulation and design
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Exterior lighting power
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Interior lighting power
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Permanent certificate
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Ventilation and air distribution system
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Fenestration areas
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Fenestration and door U-factor and product ratings
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Electric vehicle service equipment requirements
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Fenestration air leakage
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Insulation placement and R values
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Air barrier — testing
WILLIAM DURDEN, P.E.
08/21/2024
Special inspection requirement — Structural Steel - Welding
WILLIAM DURDEN, P.E.
08/05/2024
Signed off — Alteration
FILED HEREWITH; FIRE SPRINKLER PLAN.
S00807345-I1
07/31/2024
Signed off — New Building
PROPOSED INSTALLATION OF 10' WIDE CURB CUT FOR NEW MIXED USE BUILDING.
S00823484-S1
07/31/2024
Signed off — New Building
PROPOSED INSTALLATION OF 10' WIDE CURB CUT FOR NEW MIXED USE BUILDING.
S00823484-S2
07/26/2024
Filed — New Building
PROPOSED INSTALLATION OF 10' WIDE CURB CUT FOR NEW MIXED USE BUILDING.
S00823484-P2
07/12/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
07/12/2024
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
07/10/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
07/10/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
07/02/2024
Inspection — Pass-Final SP - Up to 3 Requested Floors
Pass
View inspection ↗
06/26/2024
Permit issued — Plumbing
S00823484-S1-PL
06/17/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/10/2024
Permit issued — Foundation
S00823484-I1-GC-CX
03/04/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/04/2024
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
01/18/2024
Permit issued — Sprinklers
S00807345-I1-PL
01/18/2024
Permit issued — Sprinklers
S00807345-I1-EW-SP
08/17/2023
Violation issued (ECB, closed)
Construction
08/17/2023
Violation issued (ECB, closed)
Site Safety
Latest 60 of 69 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSignSigned-offMad Signs08/05/2025
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating06/10/2025
DOB NOWGeneral ConstructionSigned-offWallace Avenue Construction06/09/2025
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating06/26/2024
DOB NOWFoundationPermit IssuedWallace Avenue Construction05/10/2024
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating01/18/2024
DOB NOWSprinklersSigned-offFlow-Right Fire Supp01/18/2024
DOB NOWPlumbingSigned-offFlow-Right Plumbing & Heating06/26/2023
DOB NOWCurb CutSigned-offWallace Avenue Construction06/13/2023
DOB NOWGeneral ConstructionPermit IssuedWallace Avenue Construction05/17/2023
1 project · most recent 07/26/2024
Gas Storm Water/Sanitary
FiledStatusContractorScope
07/26/2024Signed-offFlow-Right Plumbing & HeatingGas, Storm, Water/Sanitary
2 projects · most recent 05/21/2025
General Wiring
FiledStatusContractorScope
05/21/2025CompleteA. J. Caruso Electrical I1 meters
02/04/2024CompleteA. J. Caruso Electrical IGeneral Wiring
1 project · most recent 07/26/2024
Concrete Masonry Wood
FiledStatusContractorScope
07/26/2024Signed-offFlow-Right Plumbing & HeatingConcrete, Masonry, Wood
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
08/14/2025Pass-Final General Construction Non-Directive 14PassView ↗
08/06/2025Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/02/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
07/12/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/12/2024Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
07/10/2024Pass-Final CND-Occupancy InspectionPassView ↗
07/10/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
07/02/2024Pass-Final SP - Up to 3 Requested FloorsPassView ↗
06/17/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
07/25/2023Pass-Final PL - UndergroundPassView ↗
▾Special Inspection Requirements (DOB NOW) — 66
DateRequirementInspectorRole
08/04/2025FinalRichard Wainerprogress
08/21/2024Structural Steel - DetailsWILLIAM DURDEN, P.E.special
08/21/2024Subgrade InspectionsWILLIAM DURDEN, P.E.special
08/21/2024Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationWILLIAM DURDEN, P.E.special
08/21/2024Subsurface Investigations (Borings/Test Pits)WILLIAM DURDEN, P.E.special
08/21/2024Fire-Resistant Penetrations and JointsWILLIAM DURDEN, P.E.special
08/21/2024MasonryWILLIAM DURDEN, P.E.special
08/21/2024Structural Steel - High Strength BoltingWILLIAM DURDEN, P.E.special
08/21/2024Structural Wood FrameWILLIAM DURDEN, P.E.progress
08/21/2024Fire-Resistance Rated ConstructionWILLIAM DURDEN, P.E.progress
08/21/2024FinalWILLIAM DURDEN, P.E.progress
08/21/2024Energy Code Compliance InspectionsWILLIAM DURDEN, P.E.progress
08/21/2024Footing and FoundationWILLIAM DURDEN, P.E.progress
08/21/2024HVAC-R and service water heating system controlsWILLIAM DURDEN, P.E.energy_progress
08/21/2024HVAC-R and service water piping design and insulationWILLIAM DURDEN, P.E.energy_progress
08/21/2024Lighting controlsWILLIAM DURDEN, P.E.energy_progress
08/21/2024Structural Steel - WeldingWILLIAM DURDEN, P.E.special
08/21/2024Maintenance informationWILLIAM DURDEN, P.E.energy_progress
08/21/2024Duct leakage testing, insulation and designWILLIAM DURDEN, P.E.energy_progress
08/21/2024Exterior lighting powerWILLIAM DURDEN, P.E.energy_progress
08/21/2024Interior lighting powerWILLIAM DURDEN, P.E.energy_progress
08/21/2024Permanent certificateWILLIAM DURDEN, P.E.energy_progress
08/21/2024Ventilation and air distribution systemWILLIAM DURDEN, P.E.energy_progress
08/21/2024Fenestration areasWILLIAM DURDEN, P.E.energy_progress
08/21/2024Concrete - Cast-In-PlaceWILLIAM DURDEN, P.E.special
Latest 25 of 66.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Adult Health Modern WellnessMedical / Healthcare—
Project S01260925 Alteration · LOC Issued · 08/04/2025
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 56 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/23/2026S00807345-I1Request digital key ↗
08/23/2026S00823484-S2Request digital key ↗
08/23/2026S00823484-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
09/23/2022520452750Open ↗
▸Zoning, Tax Lot & Property Records6
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026S00823484-I1Open ↗
08/13/2026S00823484-P2Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026S00823484-P2Open ↗
08/13/2026S00823484-I1Open ↗
▸BISTAX LOT: TENTATIVE LOT NUMBER ISSUED1
09/29/2022520452750Open ↗
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026S00823484-I1Open ↗
▸Seals & Professional Certifications21
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/23/2026S00823484-S2Open ↗
08/23/2026S00823484-S1Open ↗
08/23/2026S00823484-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
08/29/2026S00823484-I1Open ↗
08/29/2026S00823484-I1Open ↗
08/29/2026S00823484-I1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWProgress Inspector Seal & Signature5
09/01/2026S01260925-I1Open ↗
08/29/2026S00823484-I1Open ↗
08/29/2026S00823484-I1Open ↗
Showing 3 of 5 on file for this type
▸Trade Schedules & Equipment2
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)2
08/13/2026S00823484-I1Open ↗
08/13/2026S00823484-P2Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/13/2026S00823484-I1Open ↗
08/13/2026S00823484-P2Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026S00823484-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026S00823484-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026S00823484-I1Open ↗
▸Inspections & Test Reports3
▸DOB NOWSOIL REPORT2
08/13/2026S00823484-P2Open ↗
08/13/2026S00823484-I1Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026S00823484-I1Open ↗
▸Filing & Intake Forms2
▸BISBOROUGH INTAKE FORM1
09/23/2022520452750Open ↗
▸BISEFILING COVER SHEET1
09/23/2022520452750Open ↗
▸Other Documents7
▸DOB NOWSite Survey: Initial2
08/13/2026S00823484-P2Open ↗
08/13/2026S00823484-I1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/13/2026S00823484-P2Open ↗
08/13/2026S00823484-I1Open ↗
▸DOB NOWProperty Ownership Certification2
08/23/2026S00823484-I1Open ↗
08/23/2026S00823484-P2Open ↗
▸DOB NOWFinal Survey1
08/13/2026S00823484-I1Open ↗