← Back
Predominantly retail with other uses
8780 19 AVENUE
BROOKLYN · BIN 3168696
💬 Discuss this project
1920Year Built
2Stories
K4Building Class
R5Zoning
4,812 sfGross Floor Area
3Units
Predominantly retail with other uses · Owner of record: 8780 19 AVE LLC · 3,865 sf lot · 1.25 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Floor 217p · 1 filing · 20 docs
Floor 117p · 1 filing · 20 docs
Cellar19p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
1266 PARK PLACE2107/08/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/06/2022$2.0M—— → —$416/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MGM CREATIONS ARCHITECTURE704/27/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
A2ZCM803/21/2026
ADAM BERGMAN CONSTRUCTION AND DEVEL203/21/2026
BMB BUILDING CONSULTING203/21/2026
RELIABLE EXPEDITING103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
BYBLOS INC. NYGeneral Contractor407/08/2026
NICE PLUMBING CORPPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616604/27/2023
Building Lifecycle
All (66)Filed (7)Permit Issued (4)Signed Off (3)Inspection (6)Objection (16)Special Inspection (30)
06/05/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/05/2023
Signed off — Alteration CO
PROPOSED MECHANICAL WORK @ T.0 ROOF. INSTALLATION OF NEW ELECTRICAL EXTERIOR CONDENSERS AS PER PLANS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. FILING MECHANICAL APPLICATION IN CONJUNCTION WITH DOB ALT CO- JOB# B00698416-I1
B00698416-S1
05/02/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
05/02/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
05/02/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
05/02/2023
Special inspection requirement — Heating Systems
FAHAD FATEH
05/02/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
05/02/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
05/02/2023
Special inspection requirement — Final
FAHAD FATEH
05/02/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
05/02/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
05/02/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/27/2023
Filed — Alteration CO
PROPOSED MECHANICAL WORK @ T.0 ROOF. INSTALLATION OF NEW ELECTRICAL EXTERIOR CONDENSERS AS PER PLANS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. FILING MECHANICAL APPLICATION IN CONJUNCTION WITH DOB ALT CO- JOB# B00698416-I1
B00698416-P2
04/19/2023
Special inspection requirement — Heating Systems
FAHAD FATEH
04/19/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
04/19/2023
Special inspection requirement — Final
FAHAD FATEH
04/19/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
04/19/2023
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
04/19/2023
Special inspection requirement — Shutoff dampers
FAHAD FATEH
04/19/2023
Special inspection requirement — Maintenance information
FAHAD FATEH
04/19/2023
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
04/19/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
04/19/2023
Special inspection requirement — Mechanical Systems
FAHAD FATEH
04/10/2023
Signed off — Alteration CO
PROPOSED MECHANICAL WORK @ T.0 ROOF. INSTALLATION OF NEW ELECTRICAL EXTERIOR CONDENSERS AS PER PLANS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. FILING MECHANICAL APPLICATION IN CONJUNCTION WITH DOB ALT CO- JOB# B00698416-I1
B00698416-S3
04/04/2023
Signed off — Alteration CO
PROPOSED MECHANICAL WORK @ T.0 ROOF. INSTALLATION OF NEW ELECTRICAL EXTERIOR CONDENSERS AS PER PLANS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. FILING MECHANICAL APPLICATION IN CONJUNCTION WITH DOB ALT CO- JOB# B00698416-I1
B00698416-S2
03/29/2023
Inspection — Certified Remove/Cap - work done in accordance with code
Certified
View inspection ↗
03/29/2023
Inspection — Certified Water and Sanitary-WS-Fixtures-Finish
Certified
View inspection ↗
03/28/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/13/2023
Filed — Alteration CO
PROPOSED MECHANICAL WORK @ T.0 ROOF. INSTALLATION OF NEW ELECTRICAL EXTERIOR CONDENSERS AS PER PLANS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. FILING MECHANICAL APPLICATION IN CONJUNCTION WITH DOB ALT CO- JOB# B00698416-I1
B00698416-P1
03/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
FAHAD FATEH
03/09/2023
Special inspection requirement — Lighting controls
FAHAD FATEH
03/09/2023
Special inspection requirement — Interior lighting power
FAHAD FATEH
03/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/09/2023
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
02/22/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/01/2023
Permit issued — Structural
B00698416-S3-ST
01/20/2023
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
01/17/2023
Permit issued — Mechanical Systems
B00698416-S1-MS
01/13/2023
Permit issued — Plumbing
B00698416-S2-PL
01/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
01/06/2023
Permit issued — General Construction
B00698416-I1-GC
10/07/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
10/07/2022
Special inspection requirement — Energy Code Compliance Inspections
FAHAD FATEH
09/20/2022
Filed — Alteration CO
PROPOSED MECHANICAL WORK @ T.0 ROOF. INSTALLATION OF NEW ELECTRICAL EXTERIOR CONDENSERS AS PER PLANS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. FILING MECHANICAL APPLICATION IN CONJUNCTION WITH DOB ALT CO- JOB# B00698416-I1
B00698416-S3
09/16/2022
Special inspection requirement — Structural Stability – Alterations of existing buildings
FAHAD FATEH
09/16/2022
Special inspection requirement — Structural Cold-Formed Steel
FAHAD FATEH
08/01/2022
Filed — Alteration CO
PROPOSED MECHANICAL WORK @ T.0 ROOF. INSTALLATION OF NEW ELECTRICAL EXTERIOR CONDENSERS AS PER PLANS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. FILING MECHANICAL APPLICATION IN CONJUNCTION WITH DOB ALT CO- JOB# B00698416-I1
B00698416-S1
08/01/2022
Filed — Alteration CO
PROPOSED MECHANICAL WORK @ T.0 ROOF. INSTALLATION OF NEW ELECTRICAL EXTERIOR CONDENSERS AS PER PLANS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. FILING MECHANICAL APPLICATION IN CONJUNCTION WITH DOB ALT CO- JOB# B00698416-I1
B00698416-S2
03/28/2022
Filed — Alteration CO
PROPOSED MECHANICAL WORK @ T.0 ROOF. INSTALLATION OF NEW ELECTRICAL EXTERIOR CONDENSERS AS PER PLANS. NO CHANGE IN USE,EGRESS, OR OCCUPANCY UNDER THIS APPLICATION. FILING MECHANICAL APPLICATION IN CONJUNCTION WITH DOB ALT CO- JOB# B00698416-I1
B00698416-I1
01/12/2022
Objection resolved — Addressed
01/12/2022
Objection resolved — Addressed
01/12/2022
Objection resolved — Addressed
01/12/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
01/06/2022
Objection resolved — Addressed
12/22/2021
Objection raised — Fire_Protection
12/22/2021
Objection raised — Mechanical
12/22/2021
Objection raised — Fire_Protection
Latest 60 of 66 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWStructuralSigned-offBYBLOS INC NY02/01/2023
DOB NOWMechanical SystemsSigned-offBYBLOS INC NY01/17/2023
DOB NOWPlumbingSigned-offNICE PLUMBING CORP01/13/2023
DOB NOWGeneral ConstructionPermit IssuedBYBLOS INC NY01/06/2023
BISCCISSUEDHELLAS GLASS WORKS CORP.05/03/2006
1 project · most recent 04/27/2023
Heating and Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
04/27/2023Signed-offBYBLOS INC. NYHeating and Air Conditioning Systems
Heat / Cool
Daikin RXTQ36TAVJ9A 36,000 BTU · Vrf Outdoor ×1
Mitsubishi Electric MXZ-SM60NAM-UI 60,000 BTU · Vrf Outdoor ×1
1 project · most recent 04/27/2023
Water/Sanitary
FiledStatusContractorScope
04/27/2023Signed-offNICE PLUMBING CORPWater/Sanitary
2 projects · most recent 12/22/2023
General Wiring
FiledStatusContractorScope
12/22/2023CancelledFOREST BROOK ELEC'L CONTRGeneral Wiring
12/30/2022CompleteFOREST BROOK ELEC'L CONTRGeneral Wiring
▾Field Inspections (DOB CAP) — 6
DateTypeResultReport
06/05/2024Pass-Final CND-Occupancy InspectionPassView ↗
03/29/2023Certified Remove/Cap - work done in accordance with codeCertifiedView ↗
03/29/2023Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
03/28/2023Pass-Final CND-Occupancy InspectionPassView ↗
02/22/2023Pass-Final CND-Occupancy InspectionPassView ↗
01/20/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
05/02/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
05/02/2023Shutoff dampersFAHAD FATEHenergy_progress
05/02/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
05/02/2023Heating SystemsFAHAD FATEHspecial
05/02/2023Mechanical SystemsFAHAD FATEHspecial
05/02/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
05/02/2023FinalFAHAD FATEHprogress
05/02/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
05/02/2023Maintenance informationFAHAD FATEHenergy_progress
05/02/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/19/2023Heating SystemsFAHAD FATEHspecial
04/19/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
04/19/2023FinalFAHAD FATEHprogress
04/19/2023HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
04/19/2023HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
04/19/2023Shutoff dampersFAHAD FATEHenergy_progress
04/19/2023Maintenance informationFAHAD FATEHenergy_progress
04/19/2023HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
04/19/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
04/19/2023Mechanical SystemsFAHAD FATEHspecial
03/09/2023Fire-Resistance Rated ConstructionFAHAD FATEHprogress
03/09/2023Lighting controlsFAHAD FATEHenergy_progress
03/09/2023Interior lighting powerFAHAD FATEHenergy_progress
03/09/2023Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
03/09/2023Energy Code Compliance InspectionsFAHAD FATEHprogress
Latest 25 of 34.
▾Documents — 52 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/28/2026B00698416-I1Request digital key ↗
08/28/2026B00698416-P2Request digital key ↗
08/28/2026B00698416-P1Request digital key ↗
Showing 3 of 7 on file for this type
▸Applications & Permits2
▸BISPLAN / WORK APPROVAL APPLICATION2
08/11/2009320003125Open ↗
04/01/2009320003125Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/13/2026B00698416-I1Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature9
09/20/2026B00698416-P2Open ↗
09/20/2026B00698416-P2Open ↗
08/28/2026B00698416-S3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/31/2026B00639801-I1Open ↗
08/28/2026B00698416-I1Open ↗
08/28/2026B00698416-S3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/20/2026B00698416-P2Open ↗
08/28/2026B00698416-S3Open ↗
08/28/2026B00698416-S1Open ↗
Showing 3 of 5 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
04/01/2009320003125Open ↗
▸Safety & Tenant Protection5
▸DOB NOWStreet Tree Checklist2
08/28/2026B00698416-P1Open ↗
08/28/2026B00698416-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/13/2026B00698416-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/13/2026B00698416-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026B00698416-I1Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/28/2026B00698416-P2Open ↗
08/28/2026B00698416-P1Open ↗
08/28/2026B00698416-S3Open ↗
Showing 3 of 7 on file for this type
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
04/01/2009320003125Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/13/2026B00698416-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸BISADMINISTRATIVE OBJECTIONS1
04/01/2009320003125Open ↗
▸Cost, Insurance & Ownership1
▸BISCOST AFFIDAVIT1
04/01/2009320003125Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
04/01/2009320003125Open ↗
▸Other Documents3
▸DOB NOWProperty Ownership Certification2
08/28/2026B00698416-P1Open ↗
08/28/2026B00698416-I1Open ↗
▸DOB NOWFinal Survey1
08/13/2026B00698416-I1Open ↗