← Back
Public elementary, junior or senior high
I.S. 281 Joseph B Cavallaro
8781 CROPSEY AVENUE · BIN 3186626
💬 Discuss this project
1965Year Built
4Stories
W1Building Class
R5Zoning
153,313 sfGross Floor Area
1Units
LL97 Covered4 Open Violations 1 unresolved · 3 paperwork only ▸FDNY Report ↗
Public elementary, junior or senior high · Owner of record: NYC DEPARTMENT OF EDUCATION · 125,613 sf lot · 1.22 FAR built · Flood zone X500
Locations of Work
ArchitectureStructuralMechanicalPlumbing
Permit Issued — active, not yet Signed-off
RoofUnder Construction17p · 1 filing · 20 docs
Floor 4Under Construction6p · 1 filing · 20 docs
Floor 3Under Construction6p · 1 filing · 20 docs
Floor 2Under Construction8p · 2 filings · 20 docs
Floor 1Under Construction6p · 1 filing · 20 docs
Sub-BasementUnder Construction5p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
NYC SCHOOL CONSTRUCTION AUTHORITY3407/08/2026
NYC DEPARTMENT OF EDUCATION203/22/2026
DEPARTMENT OF EDUCATION1603/22/2026
DEPT OF EDUCATION I.S. 2103/22/2026
DEPT OF EDUCATION I.S. 28103/22/2026
DOE IS 281 040303/22/2026
DEPARTMENT OF EDUCATION 0203/22/2026
DOE IS 281303/22/2026
D.O.E. IS 281 0103/22/2026
DOE - JHS 281 & PLAYGROUN203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
EME CONSULTING ENG AND ARCH GROUP207/02/2026
NEIL BIENVENU302/26/2026
DSENY ENGINEERING SERVICES, PC504/15/2025
JEFF RABINER101/17/2024
BLADYKAS ENGINEERING, P.C.101/09/2024
NYGB110/13/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
SBLM503/21/2026
DSENY ENGINEERING SERVICES1003/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WHITESTONE CONSTRUCTION CORPGeneral Contractor1007/08/2026
TAMEER INCGeneral Contractor207/08/2026
VARSITY PLBG AND HTG INCPlumbing207/08/2026
DUARTE, LUIGIElectrical103/21/2026
FAJARDO, JOSEElectrical103/21/2026
FRANCIS RICHARDSElectrical103/21/2026
GIOVANNI DITURIElectrical103/21/2026
CAPIZZO, VITOElectrical103/21/2026
STANCO SYSTEM ELEC'L CONTElectrical103/22/2026
SUMMERVILLE, ERROLElectrical103/21/2026
WILLIAM NIEVESElectrical103/21/2026
CREATIVE TOUCH CONSTRUCTIGeneral Contractor107/08/2026
NIEVES WILLIAMElectrical103/21/2026
CARUSO, VElectrical103/21/2026
CHARAN ELEC'L ENTERP'S INElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JPC LOGISTICS DBA JPCL EN351106/25/2026
TWIN PEAKS INC.317702/26/2026
Building Lifecycle
All (133)Filed (13)Permit Issued (13)Signed Off (1)Violation (60)Inspection (1)Objection (15)Special Inspection (30)
07/07/2026
Objection raised — Other
07/02/2026
Filed — Alteration
CLASSROOMS 109, 111, 113 AND 214 TO BE RENOVATED TO INSTALL NEW FURNITURE, MILL-WORK, FINISH FLOOR, AND LIGHTING FIXTURES.
B01397959-S1
07/02/2026
Objection raised — Other
07/02/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/02/2026
Special inspection requirement — HVAC-R and service water piping design and insulation
07/02/2026
Special inspection requirement — Energy Code Compliance Inspections
07/02/2026
Special inspection requirement — Post-installed Anchors
06/25/2026
Filed — Alteration
CLASSROOMS 109, 111, 113 AND 214 TO BE RENOVATED TO INSTALL NEW FURNITURE, MILL-WORK, FINISH FLOOR, AND LIGHTING FIXTURES.
B01397959-I1
03/25/2026
Permit issued — Mechanical Systems
B00971121-S1-MS
03/25/2026
Permit issued — General Construction
B00971121-I1-GC
03/24/2026
Permit issued — Plumbing
B00971121-S2-PL
03/09/2026
Violation issued (ECB, open)
Construction
02/27/2026
Objection raised — Other
02/26/2026
Filed — Alteration
K281 - Remove and replace storm drain piping and roof drains in same location as existing.
B00971121-P2
02/25/2026
Special inspection requirement — Air barrier - visual inspection
MIKHAIL ZEYGMAN
02/25/2026
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
02/25/2026
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
02/25/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
02/25/2026
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
02/25/2026
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
02/25/2026
Special inspection requirement — Fenestration areas
MIKHAIL ZEYGMAN
02/25/2026
Special inspection requirement — Fenestration and door U-factor and product ratings
MIKHAIL ZEYGMAN
02/25/2026
Special inspection requirement — Fenestration air leakage
MIKHAIL ZEYGMAN
02/25/2026
Special inspection requirement — Insulation placement and R values
MIKHAIL ZEYGMAN
11/03/2025
Permit issued — Construction Fence
B01088248-I1-FN
11/03/2025
Permit issued — Sidewalk Shed
B01088253-I1-SH
11/03/2025
Permit issued — Supported Scaffold
B01088273-I1-SF
08/25/2025
Violation issued (ECB, open)
Boilers
06/13/2025
Violation issued (FDNY_ORDER, closed)
06/13/2025
Violation issued (FDNY_ORDER, closed)
04/28/2025
Violation issued (ECB, closed)
Construction
04/17/2025
Objection resolved — Addressed
04/17/2025
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
04/16/2025
Objection raised — Other
04/15/2025
Filed — Alteration
SF/IS281K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(SCAFFOLD) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB# B00971121 NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01088273-P1
03/27/2025
Permit issued — General Construction
B00971121-I1-GC
03/26/2025
Permit issued — Mechanical Systems
B00971121-S1-MS
03/21/2025
Permit issued — Plumbing
B00971121-S2-PL
03/04/2025
Objection resolved — Addressed
03/04/2025
Special inspection requirement — Fire-Resistance Rated Construction
MIKHAIL ZEYGMAN
03/04/2025
Special inspection requirement — Masonry
MIKHAIL ZEYGMAN
03/04/2025
Special inspection requirement — Post-installed Anchors
MIKHAIL ZEYGMAN
03/04/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
MIKHAIL ZEYGMAN
03/04/2025
Special inspection requirement — Insulation placement and R values
MIKHAIL ZEYGMAN
03/04/2025
Special inspection requirement — Fenestration areas
MIKHAIL ZEYGMAN
03/04/2025
Special inspection requirement — Air barrier - visual inspection
MIKHAIL ZEYGMAN
03/04/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
MIKHAIL ZEYGMAN
03/04/2025
Special inspection requirement — Fenestration air leakage
MIKHAIL ZEYGMAN
03/04/2025
Special inspection requirement — Energy Code Compliance Inspections
MIKHAIL ZEYGMAN
01/14/2025
Violation issued (FDNY_ORDER, closed)
01/14/2025
Violation issued (FDNY_ORDER, closed)
12/17/2024
Objection raised — Other
12/12/2024
Filed — Alteration
K281 - Remove and replace storm drain piping and roof drains in same location as existing.
B00971121-P1
11/15/2024
Filed — Alteration
FN/IS281K - FOR TEMPORARY CONSTRUCTION EQUIPMENT(FENCE) SUBMITTING ON BEHALF OF CONTRACTOR, RELATED TO DOB# B00971121 NO CHANGE IN USE, OCCUPANCY OR EGRESS
B01088248-P1
11/07/2024
Permit issued — Supported Scaffold
B01088273-I1-SF
11/06/2024
Permit issued — Sidewalk Shed
B01088253-I1-SH
11/06/2024
Permit issued — Construction Fence
B01088248-I1-FN
11/06/2024
Objection resolved — Addressed
10/31/2024
Objection resolved — Addressed
09/18/2024
Objection resolved — Addressed
Latest 60 of 133 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedTAMEER INC03/25/2026
DOB NOWGeneral ConstructionPermit IssuedWHITESTONE CONSTRUCTION CORP03/25/2026
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC03/24/2026
DOB NOWConstruction FencePermit IssuedWHITESTONE CONSTRUCTION CORP11/03/2025
DOB NOWSidewalk ShedPermit IssuedWHITESTONE CONSTRUCTION CORP11/03/2025
DOB NOWSupported ScaffoldPermit IssuedWHITESTONE CONSTRUCTION CORP11/03/2025
DOB NOWGeneral ConstructionPermit IssuedWHITESTONE CONSTRUCTION CORP03/27/2025
DOB NOWMechanical SystemsPermit IssuedTAMEER INC03/26/2025
DOB NOWPlumbingPermit IssuedVARSITY PLBG AND HTG INC03/21/2025
DOB NOWSupported ScaffoldPermit IssuedWHITESTONE CONSTRUCTION CORP11/07/2024
DOB NOWSidewalk ShedPermit IssuedWHITESTONE CONSTRUCTION CORP11/06/2024
DOB NOWConstruction FencePermit IssuedWHITESTONE CONSTRUCTION CORP11/06/2024
DOB NOWConstruction FenceSigned-offCREATIVE TOUCH CONSTRUCTI11/09/2022
BISOTISSUEDCREATIVE TOUCH CONSTRUCTI09/11/2025
BISOTISSUEDCREATIVE TOUCH CONSTRUCTI03/13/2025
BISOTISSUEDCREATIVE TOUCH CONSTRUCTI06/27/2023
BISOTISSUEDCREATIVE TOUCH CONSTRUCTI06/23/2023
BISOTISSUEDCREATIVE TOUCH CONSTRUCTI06/09/2023
BISOTISSUEDCREATIVE TOUCH CONSTRUCTI01/06/2023
BISOTISSUEDCREATIVE TOUCH CONSTRUCTI01/06/2023
BISOTISSUEDDORION NORTON ELECTRICAL01/06/2023
BISMHISSUEDVOLMAR CONSTRUCTION INC09/24/2020
BISOTISSUEDAWL INDUSTRIES INC06/20/2018
BISMHISSUEDAWL INDUSTRIES INC06/20/2018
BISOTISSUEDEURO CASTLE CONSTRUCTION06/01/2018
BISOTISSUEDEURO CASTLE CONSTRUCTION06/01/2018
BISMHISSUEDGRIDSPAN CORPORATION12/26/2017
BISSPISSUEDEAGLE MECHANICAL INC12/13/2017
BISPLISSUEDVITAL PLUMBING, INC10/30/2017
BISMHISSUEDU & I MECHANICAL CORP08/22/2017
BISMHISSUEDAWL INDUSTRIES INC07/26/2017
BISOTISSUEDAWL INDUSTRIES INC07/26/2017
BISOTISSUEDEURO CASTLE CONSTRUCTION05/26/2017
BISOTISSUEDEURO CASTLE CONSTRUCTION05/26/2017
BISOTISSUEDEURO CASTLE CONSTRUCTION05/10/2017
BISOTISSUEDEURO CASTLE CONSTRUCTION05/10/2017
BISOTISSUEDGRIDSPAN CORPORATION04/25/2017
BISMHISSUEDU & I MECHANICAL CORP07/14/2016
BISPLISSUEDDH EAGLE PLBG & HTG INC07/07/2016
BISOTISSUEDEURO CASTLE CONSTRUCTION05/10/2016
+ 23 more permits on file
1 project · most recent 07/02/2026
Gas Water/Sanitary
FiledStatusContractorScope
07/02/2026——Gas, Water/Sanitary
19 projects · most recent 06/23/2025
General Wiring
FiledStatusContractorScope
06/23/2025CompleteEVEREST ELECTRIC CORP—
06/05/2025Permit IssuedHEXAGON CONST & ELECL GRP—
03/25/2025Permit IssuedSTANCO SYSTEM ELEC'L CONTGeneral Wiring
12/30/2024Permit IssuedHEXAGON CONST & ELECL GRP—
10/28/2024CompleteEVEREST ELECTRIC CORP—
03/22/2023Permit IssuedA & S ELECTRIC INC.General Wiring
01/24/2023CompleteDORION NORTON ELECL CONTGeneral Wiring
10/26/2022CompleteCHARAN ELEC'L ENTERP'S IN—
09/29/2022CompleteCHARAN ELEC'L ENTERP'S IN—
07/01/2022Permit IssuedGEMINI ELECTRIC CO., INC.General Wiring
03/02/2022CompleteCHARAN ELEC'L ENTERP'S IN—
10/13/2021CompleteCHARAN ELEC'L ENTERP'S IN—
07/07/2021CompleteABM ELECTRIC, INC—
08/21/2020Permit IssuedINTERPHASE ELECTRIC CORP.General Wiring
10/25/2019Permit IssuedA & S ELECTRIC INC.General Wiring
3 projects · most recent 04/15/2025
Scaffold Fence Sidewalk Shed
FiledStatusContractorScope
04/15/2025Permit IssuedWHITESTONE CONSTRUCTION CScaffold
11/15/2024Permit IssuedWHITESTONE CONSTRUCTION CFence
08/05/2024Permit IssuedWHITESTONE CONSTRUCTION CSidewalk Shed
▾Field Inspections (DOB CAP) — 1
DateTypeResultReport
11/29/2023Pass-Final Construction Permit WithdrawalPassView ↗
▾Special Inspection Requirements (DOB NOW) — 34
DateRequirementInspectorRole
07/02/2026Fire-Resistant Penetrations and Joints—special
07/02/2026HVAC-R and service water piping design and insulation—energy_progress
07/02/2026Energy Code Compliance Inspections—progress
07/02/2026Post-installed Anchors—special
02/25/2026Air barrier - visual inspectionMIKHAIL ZEYGMANenergy_progress
02/25/2026MasonryMIKHAIL ZEYGMANspecial
02/25/2026Post-installed AnchorsMIKHAIL ZEYGMANspecial
02/25/2026Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
02/25/2026Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
02/25/2026Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
02/25/2026Fenestration areasMIKHAIL ZEYGMANenergy_progress
02/25/2026Fenestration and door U-factor and product ratingsMIKHAIL ZEYGMANenergy_progress
02/25/2026Fenestration air leakageMIKHAIL ZEYGMANenergy_progress
02/25/2026Insulation placement and R valuesMIKHAIL ZEYGMANenergy_progress
04/17/2025Post-installed AnchorsMIKHAIL ZEYGMANspecial
03/04/2025Fire-Resistance Rated ConstructionMIKHAIL ZEYGMANprogress
03/04/2025MasonryMIKHAIL ZEYGMANspecial
03/04/2025Post-installed AnchorsMIKHAIL ZEYGMANspecial
03/04/2025Structural Stability – Alterations of existing buildingsMIKHAIL ZEYGMANspecial
03/04/2025Insulation placement and R valuesMIKHAIL ZEYGMANenergy_progress
03/04/2025Fenestration areasMIKHAIL ZEYGMANenergy_progress
03/04/2025Air barrier - visual inspectionMIKHAIL ZEYGMANenergy_progress
03/04/2025Fenestration and door U-factor and product ratingsMIKHAIL ZEYGMANenergy_progress
03/04/2025Fenestration air leakageMIKHAIL ZEYGMANenergy_progress
03/04/2025Energy Code Compliance InspectionsMIKHAIL ZEYGMANprogress
Latest 25 of 34.
▾Documents — 96 on file (BIS + DOB NOW)
▸Plans & Drawings11
▸DOB NOWPlans/Sketch11
08/24/2026B01088253-I1Request digital key ↗
08/23/2026B01088248-P1Request digital key ↗
08/23/2026B01088248-I1Request digital key ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications41
▸DOB NOWProgress Inspector Seal & Signature19
09/06/2026B00971121-P2Open ↗
09/06/2026B00971121-P2Open ↗
09/06/2026B00971121-P2Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature11
09/06/2026B00971121-P2Open ↗
09/06/2026B00971121-P2Open ↗
09/06/2026B00971121-P2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature11
08/28/2026B08016000-I1Open ↗
08/24/2026B01088253-I1Open ↗
08/23/2026B01088248-P1Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection6
▸DOB NOWNYCSCA - Approved Site Safety Plans6
08/13/2026B01088273-P1Open ↗
08/13/2026B08016000-I1Open ↗
08/13/2026B01088248-P1Open ↗
Showing 3 of 6 on file for this type
▸Approvals, Objections & Sign-offs26
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter11
08/23/2026B00971121-P1Open ↗
08/23/2026B00971121-I1Open ↗
08/13/2026B01088248-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDesign Commission Approval City Owned (Exterior Work)11
08/23/2026B00971121-P1Open ↗
08/23/2026B00971121-I1Open ↗
08/13/2026B00971121-S2Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWDEP Variance (V5) letter3
08/13/2026B00971121-S2Open ↗
08/13/2026B00971121-I1Open ↗
08/13/2026B00971121-S1Open ↗
▸DOB NOWDesign Commission Sign Off City Owned (Exterior Work)1
08/13/2026B08016000-I1Open ↗
▸Other Documents12
▸DOB NOWNYCSCA - BCC Plan Examination Transmittal11
08/23/2026B00971121-P1Open ↗
08/23/2026B00971121-I1Open ↗
08/13/2026B01088273-P1Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWNYCSCA Exhibit 21
08/13/2026B08016000-I1Open ↗