← Back
Three families
8792 19 AVENUE
BROOKLYN · BIN 3168699
💬 Discuss this project
1901Year Built
2.75Stories
C0Building Class
R5Zoning
3,105 sfGross Floor Area
3Units
Rent Stabilized7 Open Violations 5 unresolved · 2 paperwork only ▸FDNY Report ↗
Three families · 2,660 sf lot · 1.17 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Floor 36p · 2 filings · 20 docs
Floor 2
Floor 1
Cellar5p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
09/06/2024$1.3M—— → —$419/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NIC 88 CORP610/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
BASIC GROUPS1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUBE BUILDERS GROUP NYGeneral Contractor404/09/2026
PIPESTYLISTS, INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NIC 88 CORP8371610/29/2025
Building Lifecycle
All (52)Filed (6)Permit Issued (3)Signed Off (2)Violation (15)Inspection (5)Special Inspection (21)
05/01/2026
Violation issued (HPD, open)
A
11/19/2025
Violation issued (HPD, closed)
I
10/29/2025
Filed — Alteration
REPAIR 2ND AND 3RD FLOOR DECK OF EXISTING 3 STORIES BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01242155-P1
10/29/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
10/29/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
10/29/2025
Special inspection requirement — Final
Eric Sun
10/29/2025
Special inspection requirement — Tenant Protection Plan Compliance
Eric Sun
06/23/2025
Permit issued — General Construction
B01242155-I1-GC
06/17/2025
Filed — Alteration
REPAIR 2ND AND 3RD FLOOR DECK OF EXISTING 3 STORIES BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01242155-I1
06/06/2025
Violation issued (HPD, open)
A
04/30/2025
Violation issued (ECB, open)
Construction
04/30/2025
Violation issued (ECB, open)
Construction
04/24/2025
Signed off — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST, 2ND AND 3RD FLOORS OF EXISTING 3 STORIES BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01122890-S1
04/24/2025
Signed off — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST, 2ND AND 3RD FLOORS OF EXISTING 3 STORIES BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01122890-I1
04/22/2025
Special inspection requirement — Interior lighting power
Eric Sun
04/22/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
04/22/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
04/22/2025
Special inspection requirement — Final
Eric Sun
04/22/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
04/22/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
04/21/2025
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST, 2ND AND 3RD FLOORS OF EXISTING 3 STORIES BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01122890-P2
04/18/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
04/18/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
04/18/2025
Special inspection requirement — Insulation placement and R values
Eric Sun
04/18/2025
Special inspection requirement — Interior lighting power
Eric Sun
04/18/2025
Special inspection requirement — Fire-Resistance Rated Construction
Eric Sun
04/18/2025
Special inspection requirement — Final
Eric Sun
04/03/2025
Inspection — Fail-Final PL - Up to 3 Requested Floors
Fail
View inspection ↗
03/11/2025
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST, 2ND AND 3RD FLOORS OF EXISTING 3 STORIES BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01122890-P1
03/11/2025
Special inspection requirement — HVAC-R and service water heating system controls
Eric Sun
03/11/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
Eric Sun
03/11/2025
Special inspection requirement — Energy Code Compliance Inspections
Eric Sun
03/11/2025
Special inspection requirement — HVAC-R and service water heating equipment
Eric Sun
03/11/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
Eric Sun
03/07/2025
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
12/18/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
12/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
12/18/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
11/26/2024
Violation issued (HPD, closed)
I
10/31/2024
Permit issued — Plumbing
B01122890-S1-PL
10/30/2024
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST, 2ND AND 3RD FLOORS OF EXISTING 3 STORIES BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01122890-S1
10/25/2024
Permit issued — General Construction
B01122890-I1-GC
10/22/2024
Filed — Alteration
INTERIOR RENOVATION OF CELLAR, 1ST, 2ND AND 3RD FLOORS OF EXISTING 3 STORIES BUILDING. DEMOLITION WORK AND CONSTRUCTION WORK AS PER PLAN. NEW PARTITION, FLOORING, CEILING AND PAINTING THROUGHOUT, NO CHANGE IN EGRESS, USE, OR OCCUPANCY.
B01122890-I1
04/03/2024
Violation issued (HPD, open)
A
11/20/2023
Violation issued (HPD, closed)
I
03/20/2023
Violation issued (HPD, open)
A
11/09/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, closed)
I
02/22/2022
Violation issued (HPD, open)
A
04/06/2021
Violation issued (HPD, closed)
A
10/28/2019
Violation issued (HPD, closed)
I
10/12/2018
Violation issued (HPD, closed)
I
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCUBE BUILDERS GROUP NY06/23/2025
DOB NOWPlumbingSigned-offT & T PLUMBING INC10/31/2024
DOB NOWGeneral ConstructionSigned-offCUBE BUILDERS GROUP NY10/25/2024
2 jobs · most recent 04/16/2025
General Wiring
FiledStatusContractorScope
04/16/2025CompleteALL AROUND ELECTRIC CORP.General Wiring
12/30/2024CompleteALL AROUND ELECTRIC CORP.4 meters, 4 new_meters
▾Field Inspections (DOB CAP) — 5
DateTypeResultReport
04/03/2025Fail-Final PL - Up to 3 Requested FloorsFailView ↗
03/07/2025Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/18/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
12/18/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/18/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
10/29/2025Fire-Resistant Penetrations and JointsEric Sunspecial
10/29/2025Fire-Resistance Rated ConstructionEric Sunprogress
10/29/2025FinalEric Sunprogress
10/29/2025Tenant Protection Plan ComplianceEric Sunspecial
04/22/2025Interior lighting powerEric Sunenergy_progress
04/22/2025Fire-Resistant Penetrations and JointsEric Sunspecial
04/22/2025Energy Code Compliance InspectionsEric Sunprogress
04/22/2025FinalEric Sunprogress
04/22/2025Fire-Resistance Rated ConstructionEric Sunprogress
04/22/2025Insulation placement and R valuesEric Sunenergy_progress
04/18/2025Fire-Resistant Penetrations and JointsEric Sunspecial
04/18/2025Energy Code Compliance InspectionsEric Sunprogress
04/18/2025Insulation placement and R valuesEric Sunenergy_progress
04/18/2025Interior lighting powerEric Sunenergy_progress
04/18/2025Fire-Resistance Rated ConstructionEric Sunprogress
04/18/2025FinalEric Sunprogress
03/11/2025HVAC-R and service water heating system controlsEric Sunenergy_progress
03/11/2025Fire-Resistant Penetrations and JointsEric Sunspecial
03/11/2025Energy Code Compliance InspectionsEric Sunprogress
03/11/2025HVAC-R and service water heating equipmentEric Sunenergy_progress
03/11/2025HVAC-R and service water piping design and insulationEric Sunenergy_progress
▾Documents — 29 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/21/2026B01122890-I1Request digital key ↗
08/21/2026B01122890-S1Request digital key ↗
08/21/2026B01122890-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
09/02/2026B01122890-I1Open ↗
09/02/2026B01122890-I1Open ↗
09/01/2026B01122890-P1Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature6
08/21/2026B01122890-S1Open ↗
08/21/2026B01122890-I1Open ↗
08/20/2026B01242155-P1Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/02/2026B01122890-I1Open ↗
09/01/2026B01122890-P1Open ↗
08/28/2026B01122890-P2Open ↗
Showing 3 of 4 on file for this type
▸Environmental & Asbestos6
▸DOB NOWDEP ACP-5: Asbestos Assessment Report6
08/21/2026B01122890-I1Open ↗
08/21/2026B01122890-S1Open ↗
08/20/2026B01242155-P1Open ↗
Showing 3 of 6 on file for this type