← Back
Three families
8797 19 AVENUE
BROOKLYN · BIN 3168714
💬 Discuss this project
1910Year Built
3Stories
C0Building Class
R5Zoning
3,213 sfGross Floor Area
3Units
Rent Stabilized1 Open Violation ▸FDNY Report ↗
Three families · 1,933 sf lot · 1.66 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbing
Permit Issued — active, not yet Signed-off
Floor 3Under Construction11p · 1 filing · 20 docs
Floor 2Under Construction11p · 1 filing · 20 docs
Floor 1Under Construction11p · 2 filings · 20 docs
CellarUnder Construction11p · 1 filing · 20 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
03/10/2022$1.6M—TANGLORY HOLDINGS, LLC → Private party$498/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
ZHENG & ASSOCIATES LLC503/15/2024
XIE ENGINEERING, P.C.104/07/2022
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ZAQ CONSTRUCTION INCGeneral Contractor207/08/2026
SPLEN CONSTRUCTION INCGeneral Contractor107/08/2026
DPH PLUMBING & HTG CORPPlumbing107/08/2026
THOMAS F. CASH & SONS INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ZHENG & ASSOCIATES LLC7330503/15/2024
FLUSHING ENGINEERING SERV4373104/07/2022
Building Lifecycle
All (75)Filed (6)Permit Issued (5)Violation (11)Inspection (3)Objection (32)Special Inspection (18)
05/01/2026
Violation issued (HPD, open)
A
04/01/2026
Permit issued — Plumbing
B00800930-S1-PL
03/27/2026
Permit issued — General Construction
B00800930-I1-GC
02/05/2026
Violation issued (ECB, closed)
Construction
06/06/2025
Violation issued (HPD, closed)
A
04/05/2024
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
04/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
04/05/2024
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
04/03/2024
Violation issued (HPD, closed)
A
03/15/2024
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3 FAMILY HOUSE FROM 1ST, 2ND, 3RD AND CELLAR. INSTALL PARTITION AS THE PLAN SHOWN AND PAINTING. THE FILING IS ADDRESSED THE ECB VIOLATION#35411047L. THERE IS NO CHANGE OCCUPANCY, USE OR EGRESS.
B00800930-P4
06/28/2023
Permit issued — Plumbing
B00800930-S1-PL
06/06/2023
Permit issued — General Construction
B00800930-I1-GC
04/21/2023
Special inspection requirement — Interior lighting power
Jinfar Liu
04/21/2023
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
04/21/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jinfar Liu
04/21/2023
Special inspection requirement — Final
Jinfar Liu
04/21/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
04/10/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3 FAMILY HOUSE FROM 1ST, 2ND, 3RD AND CELLAR. INSTALL PARTITION AS THE PLAN SHOWN AND PAINTING. THE FILING IS ADDRESSED THE ECB VIOLATION#35411047L. THERE IS NO CHANGE OCCUPANCY, USE OR EGRESS.
B00800930-P2
04/06/2023
Special inspection requirement — Interior lighting power
Jinfar Liu
04/06/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
04/06/2023
Special inspection requirement — Final
Jinfar Liu
04/06/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jinfar Liu
04/06/2023
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
03/20/2023
Violation issued (HPD, closed)
A
03/15/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3 FAMILY HOUSE FROM 1ST, 2ND, 3RD AND CELLAR. INSTALL PARTITION AS THE PLAN SHOWN AND PAINTING. THE FILING IS ADDRESSED THE ECB VIOLATION#35411047L. THERE IS NO CHANGE OCCUPANCY, USE OR EGRESS.
B00800930-P1
03/09/2023
Special inspection requirement — Final
Jinfar Liu
03/09/2023
Special inspection requirement — Lighting in dwelling units
Jinfar Liu
03/09/2023
Special inspection requirement — Interior lighting power
Jinfar Liu
03/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
Jinfar Liu
03/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jinfar Liu
02/08/2023
Objection raised — Mechanical
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Other
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Fire_Protection
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Mechanical
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Other
02/08/2023
Objection resolved — Addressed
02/08/2023
Objection raised — Admin
02/08/2023
Objection resolved — Addressed
02/07/2023
Filed — Alteration
INTERIOR RENOVATION OF EXISTING 3 FAMILY HOUSE FROM 1ST, 2ND, 3RD AND CELLAR. INSTALL PARTITION AS THE PLAN SHOWN AND PAINTING. THE FILING IS ADDRESSED THE ECB VIOLATION#35411047L. THERE IS NO CHANGE OCCUPANCY, USE OR EGRESS.
B00800930-S1
12/25/2022
Objection raised — Structural
12/25/2022
Objection resolved — Addressed
12/24/2022
Objection raised — Fire_Protection
12/24/2022
Objection resolved — Addressed
12/24/2022
Objection raised — Admin
12/24/2022
Objection resolved — Addressed
12/24/2022
Objection raised — Other
12/24/2022
Objection resolved — Addressed
12/24/2022
Objection raised — Fire_Protection
12/24/2022
Objection resolved — Addressed
12/24/2022
Objection raised — Other
12/24/2022
Objection resolved — Addressed
12/24/2022
Objection raised — Other
12/24/2022
Objection resolved — Addressed
12/24/2022
Objection raised — Scope
12/24/2022
Objection resolved — Addressed
12/24/2022
Objection raised — Fire_Protection
Latest 60 of 75 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingPermit IssuedTHOMAS F. CASH & SONS INC04/01/2026
DOB NOWGeneral ConstructionPermit IssuedZAQ CONSTRUCTION INC03/27/2026
DOB NOWPlumbingPermit IssuedDPH PLUMBING & HTG CORP06/28/2023
DOB NOWGeneral ConstructionPermit IssuedZAQ CONSTRUCTION INC06/06/2023
DOB NOWGeneral ConstructionPermit IssuedSPLEN CONSTRUCTION INC04/13/2022
BISOTISSUEDHENRYSMITH PROPERTY MGMT11/02/2012
1 project · most recent 03/15/2024
Gas Water/Sanitary
FiledStatusContractorScope
03/15/2024Permit IssuedTHOMAS F. CASH & SONS INCGas, Water/Sanitary
2 projects · most recent 08/01/2023
General Wiring
FiledStatusContractorScope
08/01/2023Permit IssuedKJK ELECTRIC INCGeneral Wiring
06/02/2023Permit IssuedKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
04/05/2024Certified Gas-Gas-Piping-RoughingCertifiedView ↗
04/05/2024Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
04/05/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 18
DateRequirementInspectorRole
04/21/2023Interior lighting powerJinfar Liuenergy_progress
04/21/2023Lighting in dwelling unitsJinfar Liuenergy_progress
04/21/2023Fire-Resistance Rated ConstructionJinfar Liuprogress
04/21/2023FinalJinfar Liuprogress
04/21/2023Fire-Resistant Penetrations and JointsJinfar Liuspecial
04/06/2023Interior lighting powerJinfar Liuenergy_progress
04/06/2023Fire-Resistant Penetrations and JointsJinfar Liuspecial
04/06/2023FinalJinfar Liuprogress
04/06/2023Fire-Resistance Rated ConstructionJinfar Liuprogress
04/06/2023Lighting in dwelling unitsJinfar Liuenergy_progress
03/09/2023FinalJinfar Liuprogress
03/09/2023Lighting in dwelling unitsJinfar Liuenergy_progress
03/09/2023Interior lighting powerJinfar Liuenergy_progress
03/09/2023Fire-Resistance Rated ConstructionJinfar Liuprogress
03/09/2023Fire-Resistant Penetrations and JointsJinfar Liuspecial
04/07/2022Energy Code Compliance InspectionsKY FUprogress
04/07/2022Fire-Resistant Penetrations and JointsKY FUspecial
04/03/2022FinalKY FUprogress
▾Documents — 50 on file (BIS + DOB NOW)
▸Plans & Drawings6
▸DOB NOWPlans/Sketch6
08/30/2026B00711441-I1Request digital key ↗
08/27/2026B00800930-S1Request digital key ↗
08/27/2026B00800930-P2Request digital key ↗
Showing 3 of 6 on file for this type
▸Applications & Permits3
▸BISPLAN / WORK APPROVAL APPLICATION2
01/25/2022320540072Open ↗
09/26/2012320540072Open ↗
▸BISWORK PERMIT APPLICATION1
11/19/2012320540072Open ↗
▸Seals & Professional Certifications22
▸DOB NOWProgress Inspector Seal & Signature8
09/01/2026B00800930-P2Open ↗
09/01/2026B00800930-P2Open ↗
08/31/2026B00800930-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/30/2026B00711441-I1Open ↗
08/13/2026B00800930-P1Open ↗
08/13/2026B00800930-P3Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature4
09/01/2026B00800930-P2Open ↗
08/31/2026B00800930-P1Open ↗
08/24/2026B00800930-I1Open ↗
Showing 3 of 4 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY-CERTIFICATION3
11/19/2012320540072Open ↗
11/19/2012320540072Open ↗
09/26/2012320540072Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
08/30/2026B00711441-I1Open ↗
08/13/2026B00800930-P4Open ↗
08/13/2026B00800930-P2Open ↗
Showing 3 of 7 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)1
09/26/2012320540072Open ↗
▸Energy Compliance3
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
01/25/2022320540072Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS1
09/26/2012320540072Open ↗
▸BISTR8: Energy Code Progress Inspections1
11/19/2012320540072Open ↗
▸Inspections & Test Reports2
▸BISTECHNICAL REPORT: RESPONSIBILITY2
01/25/2022320540072Open ↗
01/25/2022320540072Open ↗
▸Approvals, Objections & Sign-offs2
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST1
01/26/2022320540072Open ↗
▸BISADMINISTRATIVE OBJECTIONS1
09/26/2012320540072Open ↗
▸Cost, Insurance & Ownership3
▸BISCOST AFFIDAVIT2
10/19/2012320540072Open ↗
09/26/2012320540072Open ↗
▸BISCOST AFFIDAVIT (FINAL): PW31
01/25/2022320540072Open ↗
▸Filing & Intake Forms1
▸BISEFILING COVER SHEET1
09/26/2012320540072Open ↗