← Back
BuildNYC
Two stories - detached, small or mid-size
88-04 AUBREY AVENUE
QUEENS · Glendale · BIN 4094235
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R4AZoning
1,228 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,280 sf lot · 0.54 FAR built · Flood zone X
Locations of Work
ArchitectureElectrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofSolar panel installation on existing roof3p · 1 filing · 7 docs
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/20/2023$800K—Private party → Private party$651/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
NY Building Associates103/03/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
S R Solar Design203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Harvest PowerGeneral Contractor303/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
NKM Engineering6244103/03/2025
Building Lifecycle
06/11/2025
Signed off — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01178768-I1
03/08/2025
Permit issued — Solar
Q01178768-I1-SL
03/03/2025
Filed — Alteration
INSTALLATION OF SOLAR PANELS ON EXISTING ROOF. NO CHANGE IN USE, OCCUPANCY, OR EGRESS. NO CHANGE IN BULK
Q01178768-I1
02/10/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
NARESH MAHANGU
02/10/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
NARESH MAHANGU
8 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offHarvest Power03/08/2025
1 project · most recent 02/14/2025
FiledStatusContractorScope
02/14/2025CompleteIsland Electric—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
02/10/2025Fire-Resistant Penetrations and JointsNARESH MAHANGUspecial
02/10/2025Structural Stability – Alterations of existing buildingsNARESH MAHANGUspecial
02/10/2025Energy Code Compliance InspectionsNARESH MAHANGUprogress
02/10/2025FinalNARESH MAHANGUprogress
02/10/2025Air barrier - visual inspectionNARESH MAHANGUenergy_progress
7 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account