← Back
Office only, 2-6 stories
88-08 ROCKAWAY BEACH BLVD
QUEENS · Rockaway Beach-Arverne-Edgemere · BIN 4303497
💬 Discuss this project
1930Year Built
3Stories
O2Building Class
R5DZoning
12,300 sfGross Floor Area
13Units
0 Open ViolationsFDNY Report ↗
Office only, 2-6 stories · Owner of record: BH 8808 LLC · 4,520 sf lot · 2.72 FAR built · Flood zone AE
Locations of Work
ArchitectureFire ProtectionGeneral
Floor 13p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ROCKAWAY DEVELOPMENT GROUP2807/08/2026
8808 ROCKAWAY503/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
11/25/2024$3.5M—8808 ROCKAWAY LLC → BH 8808 LLC$285/sf building
12/20/2019$1.4M—WAVE BUILD, INC. → 8808 ROCKAWAY LLC$114/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TK ENGINEERING401/13/2023
JOSE L. PENA,P.E.511/23/2022
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
HURTADO DESIGN803/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
ROCKAWAY DEVELOPMENT GROUPGeneral Contractor1007/08/2026
CROSSWIRE ELECTRICAL INCElectrical103/22/2026
MCMANUS MECH MAINT P&H COFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
JOSE L. PENA, P.E5969801/13/2023
Building Lifecycle
All (62)Filed (9)Permit Issued (5)Signed Off (4)Violation (15)Inspection (2)Objection (2)Special Inspection (25)
02/03/2023
Signed off — Alteration
THIS APPLICATION IS FILED TO CONJUNCTION WITH I1 # Q00510030 FOR SPRINKLER WORK TYPE.
Q00539923-I1
01/31/2023
Signed off — Alteration
RENOVATE EXISTING COMMERCIAL SPACE. NO CHANGE TO EGRESS, OCCUPANCY, OR USE, NEW FLAT CANOPY @ FRONT FACADE
Q00510030-I1
01/27/2023
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
01/24/2023
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/19/2023
Special inspection requirement — Sprinkler Systems
Jose Pena
01/18/2023
Signed off — Alteration
Installation of 1 new 36K Fujitsu condenser model #AOU36RLXFZ1 serial #LXN053778 at open space (rear yard) and 2 new 18K / each split units model # ASU18RFL serial #KSA145896 and serial #KSA145997.
Q00642500-I1
01/13/2023
Filed — Alteration
THIS APPLICATION IS FILED TO CONJUNCTION WITH I1 # Q00510030 FOR SPRINKLER WORK TYPE.
Q00539923-P3
01/12/2023
Signed off — Alteration
Q00573716-I1
01/10/2023
Special inspection requirement — Sprinkler Systems
Jose Pena
12/10/2022
Filed — Alteration
THIS APPLICATION IS FILED TO CONJUNCTION WITH I1 # Q00510030 FOR SPRINKLER WORK TYPE.
Q00539923-P2
12/07/2022
Special inspection requirement — Sprinkler Systems
Jose Pena
11/28/2022
Special inspection requirement — Maintenance information
Jose Pena
11/28/2022
Special inspection requirement — Heating Systems
Jose Pena
11/28/2022
Special inspection requirement — Mechanical Systems
Jose Pena
11/28/2022
Special inspection requirement — Final
Jose Pena
11/28/2022
Special inspection requirement — Energy Code Compliance Inspections
Jose Pena
11/28/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jose Pena
11/28/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jose Pena
11/28/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Pena
11/23/2022
Filed — Alteration
Installation of 1 new 36K Fujitsu condenser model #AOU36RLXFZ1 serial #LXN053778 at open space (rear yard) and 2 new 18K / each split units model # ASU18RFL serial #KSA145896 and serial #KSA145997.
Q00642500-P1
11/14/2022
Special inspection requirement — HVAC-R and service water heating system controls
Jose Pena
11/14/2022
Special inspection requirement — Heating Systems
Jose Pena
11/14/2022
Special inspection requirement — HVAC-R and service water piping design and insulation
Jose Pena
11/14/2022
Special inspection requirement — Maintenance information
Jose Pena
11/14/2022
Special inspection requirement — Mechanical Systems
Jose Pena
11/14/2022
Special inspection requirement — Final
Jose Pena
11/14/2022
Special inspection requirement — Energy Code Compliance Inspections
Jose Pena
11/14/2022
Special inspection requirement — HVAC-R and service water heating equipment
Jose Pena
10/25/2022
Objection resolved — Addressed
10/23/2022
Objection raised — Scope
10/17/2022
Filed — Alteration
RENOVATE EXISTING COMMERCIAL SPACE. NO CHANGE TO EGRESS, OCCUPANCY, OR USE, NEW FLAT CANOPY @ FRONT FACADE
Q00510030-P1
10/14/2022
Filed — Alteration
THIS APPLICATION IS FILED TO CONJUNCTION WITH I1 # Q00510030 FOR SPRINKLER WORK TYPE.
Q00539923-P1
09/23/2022
Permit issued — General Construction
Q00510030-I1-GC
09/18/2022
Special inspection requirement — Final
Jose Pena
09/18/2022
Special inspection requirement — Interior lighting power
Jose Pena
09/06/2022
Special inspection requirement — Energy Code Compliance Inspections
Jose Pena
09/06/2022
Special inspection requirement — Insulation placement and R values
Jose Pena
09/06/2022
Special inspection requirement — Fire-Resistant Penetrations and Joints
Jose Pena
09/06/2022
Special inspection requirement — Fire-Resistance Rated Construction
Jose Pena
06/27/2022
Permit issued — Sprinklers
Q00539923-I1-EW-SP
02/09/2022
Permit issued — Mechanical Systems
Q00642500-I1-MS
02/02/2022
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/08/2021
Filed — Alteration
Installation of 1 new 36K Fujitsu condenser model #AOU36RLXFZ1 serial #LXN053778 at open space (rear yard) and 2 new 18K / each split units model # ASU18RFL serial #KSA145896 and serial #KSA145997.
Q00642500-I1
11/03/2021
Violation issued (ECB, closed)
Unknown
10/05/2021
Permit issued — Construction Fence
Q00573716-I1-FN
09/30/2021
Filed — Alteration
Q00573716-I1
09/21/2021
Permit issued — General Construction
Q00510030-I1-GC
07/25/2021
Filed — Alteration
THIS APPLICATION IS FILED TO CONJUNCTION WITH I1 # Q00510030 FOR SPRINKLER WORK TYPE.
Q00539923-I1
05/19/2021
Filed — Alteration
RENOVATE EXISTING COMMERCIAL SPACE. NO CHANGE TO EGRESS, OCCUPANCY, OR USE, NEW FLAT CANOPY @ FRONT FACADE
Q00510030-I1
05/30/2014
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
11/20/2013
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
10/18/2012
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
11/18/2011
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
10/12/2007
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
12/29/2006
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
04/06/2004
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/28/1993
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/07/1992
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
04/25/1991
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/29/1990
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
Latest 60 of 62 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offROCKAWAY DEVELOPMENT GROU09/23/2022
DOB NOWSprinklersSigned-offMCMANUS MECH MAINT P&H CO06/27/2022
DOB NOWMechanical SystemsSigned-offROCKAWAY DEVELOPMENT GROU02/09/2022
DOB NOWConstruction FenceSigned-offROCKAWAY DEVELOPMENT GROU10/05/2021
DOB NOWGeneral ConstructionSigned-offROCKAWAY DEVELOPMENT GROU09/21/2021
BISPLISSUEDORBIT PLBG & HTG INC02/12/2019
BISPLISSUEDORBIT PLBG & HTG INC12/20/2017
BISOTISSUEDNYC DAYLIGHTING INC11/20/2017
BISOTISSUEDKAPLAN HOME IMPROVEMENT C06/15/2017
BISMHISSUEDKAPLAN HOME IMPROVEMENT C04/15/2016
BISOTISSUEDKAPLAN HOME IMPROVEMENT C01/22/2016
BISEQISSUEDT.N.T INSTALLATION CORP06/21/2011
BISOTISSUEDT.N.T INSTALLATION CORP06/21/2011
BISEQISSUEDCS BRIDGE CORP04/04/2011
BISEQISSUEDANNANDALE CONTRACTING INC02/23/2011
BISOTISSUEDANNANDALE CONTRACTING INC02/23/2011
BISEQISSUEDCS BRIDGE CORP06/07/2010
7 projects · most recent 11/20/2024
General Wiring
FiledStatusContractorScope
11/20/2024CompleteCROSSWIRE ELECTRICAL INCGeneral Wiring
09/15/2022CompleteCROSSWIRE ELECTRICAL INCGeneral Wiring
07/25/2022CompleteCROSSWIRE ELECTRICAL INC—
06/27/2022CompleteCROSSWIRE ELECTRICAL INCGeneral Wiring
12/22/2021CompleteLIU ELECTRIC, LLCGeneral Wiring
11/03/2021CompleteLIU ELECTRIC, LLCGeneral Wiring
02/14/2018CompleteURBAN TECH ELECTRIC INC7 meters, 1 new_meters
▾Field Inspections (DOB CAP) — 2
DateTypeResultReport
01/27/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
01/24/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 25
DateRequirementInspectorRole
01/19/2023Sprinkler SystemsJose Penaspecial
01/10/2023Sprinkler SystemsJose Penaspecial
12/07/2022Sprinkler SystemsJose Penaspecial
11/28/2022Maintenance informationJose Penaenergy_progress
11/28/2022Heating SystemsJose Penaspecial
11/28/2022Mechanical SystemsJose Penaspecial
11/28/2022FinalJose Penaprogress
11/28/2022Energy Code Compliance InspectionsJose Penaprogress
11/28/2022HVAC-R and service water heating equipmentJose Penaenergy_progress
11/28/2022HVAC-R and service water heating system controlsJose Penaenergy_progress
11/28/2022HVAC-R and service water piping design and insulationJose Penaenergy_progress
11/14/2022HVAC-R and service water heating system controlsJose Penaenergy_progress
11/14/2022Heating SystemsJose Penaspecial
11/14/2022HVAC-R and service water piping design and insulationJose Penaenergy_progress
11/14/2022Maintenance informationJose Penaenergy_progress
11/14/2022Mechanical SystemsJose Penaspecial
11/14/2022FinalJose Penaprogress
11/14/2022Energy Code Compliance InspectionsJose Penaprogress
11/14/2022HVAC-R and service water heating equipmentJose Penaenergy_progress
09/18/2022FinalJose Penaprogress
09/18/2022Interior lighting powerJose Penaenergy_progress
09/06/2022Energy Code Compliance InspectionsJose Penaprogress
09/06/2022Insulation placement and R valuesJose Penaenergy_progress
09/06/2022Fire-Resistant Penetrations and JointsJose Penaspecial
09/06/2022Fire-Resistance Rated ConstructionJose Penaprogress
▾Documents — 145 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
08/27/2026Q00510030-I1Request digital key ↗
08/27/2026Q00573716-I1Request digital key ↗
08/25/2026Q00539923-P2Request digital key ↗
Showing 3 of 9 on file for this type
▸Applications & Permits29
▸BISPLAN / WORK APPROVAL APPLICATION18
07/15/2021421190311Open ↗
03/12/2021421190311Open ↗
03/02/2021421190311Open ↗
Showing 3 of 18 on file for this type
▸BISWORK PERMIT APPLICATION11
12/22/2017421190311Open ↗
11/24/2017421513865Open ↗
06/21/2017421190311Open ↗
Showing 3 of 11 on file for this type
▸Seals & Professional Certifications49
▸DOB NOWProgress Inspector Seal & Signature16
09/01/2026Q00642500-I1Open ↗
09/01/2026Q00642500-I1Open ↗
09/01/2026Q00642500-I1Open ↗
Showing 3 of 16 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION12
10/10/2019420197646Open ↗
06/20/2019420008002Open ↗
04/18/2018421190311Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
08/27/2026Q00510030-P1Open ↗
08/27/2026Q00510030-I1Open ↗
08/25/2026Q00539923-P3Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature8
09/01/2026Q00642500-I1Open ↗
09/01/2026Q00642500-I1Open ↗
09/01/2026Q00510030-P1Open ↗
Showing 3 of 8 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST2
06/08/2010420197646Open ↗
05/22/2009420008002Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
06/08/2010420197646Open ↗
05/22/2009420008002Open ↗
▸Trade Schedules & Equipment6
▸BISSCHEDULE B - PLUMBING3
03/12/2021421190311Open ↗
03/02/2021421190311Open ↗
02/25/2021421190311Open ↗
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE3
01/03/2020421190311Open ↗
09/09/2019421190311Open ↗
07/31/2015421190311Open ↗
▸Safety & Tenant Protection3
▸BISSTREET TREE CHECKLIST2
11/16/2017421513865Open ↗
07/31/2015421190311Open ↗
▸BISTenant Protection Plan and Notes1
11/22/2017421513865Open ↗
▸Environmental & Asbestos9
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER4
06/08/2010420197646Open ↗
05/22/2009420008002Open ↗
01/29/2009410204158Open ↗
Showing 3 of 4 on file for this type
▸BISASBESTOS: CERTIFICATION (DEP ACP5)2
11/16/2017421513865Open ↗
07/31/2015421190311Open ↗
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/27/2026Q00510030-I1Open ↗
08/15/2026Q00510030-P1Open ↗
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
11/24/2017421513865Open ↗
▸Energy Compliance9
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS3
04/18/2018421190311Open ↗
12/28/2017421513865Open ↗
01/26/2016421190311Open ↗
▸BISAS-BUILT ENERGY ANALYSIS2
04/29/2021421190311Open ↗
12/28/2017421513865Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/06/2021421190311Open ↗
04/29/2021421190311Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00642500-I1Open ↗
08/13/2026Q00510030-I1Open ↗
▸Inspections & Test Reports3
▸BISTECHNICAL REPORT: RESPONSIBILITY3
05/06/2021421190311Open ↗
05/03/2021421190311Open ↗
04/29/2021421190311Open ↗
▸Approvals, Objections & Sign-offs10
▸BISADMINISTRATIVE OBJECTIONS5
07/31/2015421190311Open ↗
06/08/2010420197646Open ↗
05/22/2009420008002Open ↗
Showing 3 of 5 on file for this type
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST4
05/06/2021421190311Open ↗
10/10/2019420197646Open ↗
06/26/2019420008002Open ↗
Showing 3 of 4 on file for this type
▸BISSCHEDULE A - OCCUPANCY / USE1
11/29/2019421190311Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
04/29/2021421190311Open ↗
06/20/2019420008002Open ↗
12/28/2017421513865Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms12
▸BISEFILING COVER SHEET6
11/16/2017421513865Open ↗
07/31/2015421190311Open ↗
06/08/2010420197646Open ↗
Showing 3 of 6 on file for this type
▸BISADDITIONAL INFORMATION4
09/09/2019421190311Open ↗
06/08/2019420008002Open ↗
04/18/2018421190311Open ↗
Showing 3 of 4 on file for this type
▸BISBOROUGH INTAKE FORM2
02/20/2018421190311Open ↗
12/27/2017421513865Open ↗