DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 EXTERNAL HGH PRESSURE INSPECTION
DOB11/14/2025VIOLATION ISSUED-FAILURE TO FILE 2024 INTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 EXTERNAL HGH PRESSURE INSPECTION
DOB09/23/2024VIOLATION ISSUED-FAILURE TO FILE 2023 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 INTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2021 EXTERNAL HGH PRESSURE INSPECTION
DOB06/30/2023VIOLATION ISSUED-FAILURE TO FILE 2020 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 INTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2019 EXTERNAL HGH PRESSURE INSPECTION
DOB06/20/2023VIOLATION ISSUED-FAILURE TO FILE 2018 INTERNAL HGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 INTERNAL HIGH PRESSURE INSPECTION
DOB04/25/2023VIOLATION ISSUED-FAILURE TO FILE 2022 EXTERNAL HIGH PRESSURE INSPECTION
DOB03/16/2020VIOLATION ISSUED - FAILURE TO FILE 2017 INTERNAL HIGH PRESSURE BOILER INSPECTION
DOB04/06/2018VIOLATION ISSUED FOR FAILURE TO FILE ANNUAL BOILER 2016 INSPECTION REPORT
DOB06/23/2017VIOLATION ISSUED FOR FAILURE TO FILE 2015 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB03/03/2015VIOLATION ISSUED FOR FAILURE TO FILE 2013 ANNUAL HIGH PRESSURE BOILER INSPECTION
DOB12/31/2009V-DOB VIOLATION - ACTIVE
DOB01/19/2007V-DOB VIOLATION - ACTIVE
DOB01/06/2006V-DOB VIOLATION - ACTIVE
DOB03/26/2002V-DOB VIOLATION - ACTIVE
DOB09/06/2001V-DOB VIOLATION - ACTIVE
DOB09/06/2001V-DOB VIOLATION - ACTIVE
DOB09/06/2001V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
DOB02/27/2001V-DOB VIOLATION - ACTIVE
ECB05/23/2007WORK W/O PERMIT.WORK NOTED:AT REAR PROPERTY APPROX 10'LONG & 2' HIGH A SECTION OF RETAINING WALL WAS CUT & DEMOLISHED.REMEDY:OBTAIN PERMIT OR RESTORE TO PRIOR LEGAL CONDITION.Nothing owed — awaiting certificate of correction
ECB02/09/200750A,B, BQ9.50A-FIRE RATED MATERIAL ABOVE BOILER MISSING EXPOSED WOOD BEAMS.50B-DEFECTIVE FLU PIPE ON BOILER INLET NOW PROPERLY FASTENED.BQ9-INSTALLATION OF A 1996 FULTON HIGH PRESSURE GAS FIRED BOILER W/ OBTAINNothing owed — awaiting certificate of correction
ECB04/20/200518B38/40/48B/50A/50B/50C/30D/50E/50F/-1984 FULTON NATL BO.44276. 50A-COVER THE EXPOSED WOOD IN THE CEILING.50B-ENCLOSE THE BOILER IN A FIRE RATED ROOM.50C-THE SAFETY VALVE DISCHARGE PIPE THREADS ON THE END.50D-Nothing owed — awaiting certificate of correction