← Back
BuildNYC
Elevator cooperative
88-11 ELMHURST AVENUE
QUEENS · Elmhurst · BIN 4037357
💬 Discuss this project
1937Year Built
6Stories
D4Building Class
R7BZoning
92,244 sfGross Floor Area
82Units
LL97 CoveredRent Stabilized174 Active Violations 155 unresolved · 19 paperwork only 1 likely answered 14 old, status unconfirmed ▸FISP: No Report Filed
Elevator cooperative · Owner of record: Elmhurst House · 20,500 sf lot · 4.5 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 5Replace kitchen and bathroom1p · 1 filing · 4 docs
Floor 4Unit 4C1 filing · 3 docs
Floor 3
Floor 2Remove illegal partition wall and door in apartment B151 filing
Floor 1Heavy duty sidewalk shed installation1 filing · 1 doc
Site & exteriorHeavy duty sidewalk shed for facade work3p · 1 filing · 2 docs
Filed — no permit issuedWindow lintels pointing, roof and floors16p · 1 filing · 5 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Alexander Wolf & Co403/21/2026
Dba Pamenar Realty303/21/2026
Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Farhad Bassiri-Tehrani210/28/2026
Asr Engineering105/29/2026
Mumtaz Enterprises102/19/2026
Queens101/02/2024
Li Architect Associate101/19/2023
Alpha Home Design107/30/2020
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Xinos Construction203/21/2026
Reliable Enterprises203/21/2026
Ecdesign Studio203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Pamenar RealtyGeneral Contractor303/21/2026
Xinos ConstructionScaffold203/21/2026
RRP PlumbingPlumbing107/08/2026
D & L Plumbing and HeatingPlumbing105/03/1990
Everest ScaffoldingGeneral Contractor306/05/2017
Orluck ConstructionGeneral Contractor110/03/2005
Renewal ConstructionGeneral Contractor108/23/2002
Shallu ConstructionGeneral Contractor210/06/2009
United Construction USAGeneral Contractor101/26/2010
Yilin ConstructionGeneral Contractor108/19/2020
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Bassiri8394110/27/2026
Asr Engineering8404105/29/2026
Ikra Consulting7032105/29/2026
Building Lifecycle
02/20/2029
Facade inspection report due (FISP Cycle 9, sub-cycle C)
The filing window opened 02/21/2027. No Cycle 9 filing on record yet
11/18/2026
Objection raised — Other
10/28/2026
Filed — Alteration
RESOLVE ECB VIOLATION: 35004700R; RENOVATION OF EXISTING APARTMENT #B15 iN SECOND FLOOR WITH GENERAL CONSTRUCTION: REMOVE ILLEGAL PARTITION WALL AND DOOR AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01480853-I1
10/27/2026
Filed — Alteration
RESOLVE ECB VIOLATION: 35004700R; RENOVATION OF EXISTING APARTMENT #B15 iN SECOND FLOOR WITH GENERAL CONSTRUCTION: REMOVE ILLEGAL PARTITION WALL AND DOOR AS PER PLAN; NO CHANGE IN USE, EGRESS OR OCCUPANCY UNDER THIS APPLICATION.
Q01477760-I1
10/27/2026
Special inspection requirement — Tenant Protection Plan Compliance
253 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedPermit IssuedXinos Construction01/03/2024
DOB NOWPlumbingSigned-offRRP Plumbing09/04/2020
BISOTISSUEDYilin Construction08/19/2020
BISEQISSUEDEverest Scaffolding06/05/2017
BISEQISSUEDEverest Scaffolding06/15/2016
BISEQISSUEDEverest Scaffolding06/15/2015
BISOTISSUEDN/A03/21/2014
BISOTISSUEDUnited Construction USA01/26/2010
BISOTISSUEDShallu Construction10/06/2009
BISEQISSUEDShallu Construction10/05/2009
BISOTISSUEDPamenar Realty03/10/2006
BISEQISSUEDOrluck Construction10/03/2005
BISOTISSUEDPamenar Realty02/18/2005
BISOTISSUEDPamenar Realty12/31/2003
BISOTISSUEDPamenar Realty04/23/2003
BISOTISSUEDRenewal Construction08/23/2002
BISSPISSUEDD & L Plumbing and Heating05/03/1990
BIS—ISSUEDElmhurst House04/09/1990
BISOTISSUEDArkara Construction03/06/1990
2 projects · most recent 02/19/2026
General Wiring
FiledStatusContractorScope
02/19/2026Permit IssuedRichard Neu—
08/26/2020Permit IssuedKJK ElectricGeneral Wiring
2 projects · most recent 02/19/2026
Sidewalk Shed
FiledStatusContractorScope
02/19/2026——Sidewalk Shed
01/02/2024Permit IssuedXinos ConstructionSidewalk Shed
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
10/27/2026Tenant Protection Plan Compliance—special
10/27/2026Energy Code Compliance Inspections—progress
10/27/2026Fire-Resistance Rated Construction—progress
10/27/2026Tenant Protection Plan Compliance—special
10/27/2026Fire-Resistant Penetrations and Joints—special
10/21/2026Energy Code Compliance InspectionsFARHAD BASSIRI-TEHRANIprogress
10/21/2026Fire-Resistance Rated ConstructionFARHAD BASSIRI-TEHRANIprogress
10/21/2026Fire-Resistant Penetrations and JointsFARHAD BASSIRI-TEHRANIspecial
05/01/2026Tenant Protection Plan ComplianceMD MOSTAFAspecial
05/01/2026MasonryAKM RAHMANspecial
05/01/2026FinalAKM RAHMANprogress
11/17/2022Tenant Protection Plan Compliance—special
11/17/2022Fire-Resistant Penetrations and Joints—special
11/17/2022Energy Code Compliance Inspections—progress
11/17/2022Fire-Resistance Rated Construction—progress
139 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account