← Back
Cape Cod
88-18 218 PLACE
QUEENS · BIN 4228854
💬 Discuss this project
1950Year Built
1.5Stories
A0Building Class
R2Zoning
1,442 sfGross Floor Area
1Units
0 Open Violations
Cape Cod · 4,000 sf lot · 0.36 FAR built · Flood zone X
Locations of Work
Electrical
Permit Issued — active, not yet Signed-off
RoofUnder Construction2p · 1 filing · 8 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TRINITY SOLAR LLC106/08/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
TRINITY SOLAR LLCGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BITOPI CONSULTANTS LLC7036106/08/2026
Building Lifecycle
All (9)Filed (1)Permit Issued (1)Violation (2)Special Inspection (5)
06/11/2026
Permit issued — Solar
Q01409989-I1-SL
06/08/2026
Filed — Alteration
Installation of solar system on the roof as per plan. No change in use, egress or occupancy
Q01409989-I1
06/01/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
KAMRUL AHSAN
06/01/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
KAMRUL AHSAN
06/01/2026
Special inspection requirement — Energy Code Compliance Inspections
Ayracon Almaraz
06/01/2026
Special inspection requirement — Final
Ayracon Almaraz
06/01/2026
Special inspection requirement — Air barrier - visual inspection
Ayracon Almaraz
03/05/2001
Violation issued (ECB, closed)
Quality of Life
03/05/2001
Violation issued (ECB, closed)
Quality of Life
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedTRINITY SOLAR LLC06/11/2026
1 project · most recent 05/27/2026
FiledStatusContractorScope
05/27/2026CompleteREDLINE ELECTRIC INC—
1 project · most recent 06/08/2026
FiledStatusContractorScope
06/08/2026Permit IssuedTRINITY SOLAR LLC19 panels, 7.79 kw, 10,678 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/01/2026Structural Stability – Alterations of existing buildingsKAMRUL AHSANspecial
06/01/2026Fire-Resistant Penetrations and JointsKAMRUL AHSANspecial
06/01/2026Energy Code Compliance InspectionsAyracon Almarazprogress
06/01/2026FinalAyracon Almarazprogress
06/01/2026Air barrier - visual inspectionAyracon Almarazenergy_progress
▾Documents — 8 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/16/2026Q01409989-I1Request digital key ↗
▸Seals & Professional Certifications6
▸DOB NOWProgress Inspector Seal & Signature3
08/30/2026Q01409989-I1Open ↗
08/30/2026Q01409989-I1Open ↗
08/30/2026Q01409989-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/30/2026Q01409989-I1Open ↗
08/30/2026Q01409989-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/16/2026Q01409989-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/16/2026Q01409989-I1Open ↗