← Back
Two stories - detached, small or mid-size
88-24 170 STREET
QUEENS · BIN 4210157
💬 Discuss this project
1920Year Built
2.5Stories
A1Building Class
R6AZoning
1,668 sfGross Floor Area
1Units
0 Open ViolationsFDNY Report ↗
Two stories - detached, small or mid-size · 3,600 sf lot · 0.46 FAR built · Flood zone X
Locations of Work
ArchitectureStructural
Roof2p · 1 filing · 16 docs
Floor 62p · 1 filing · 16 docs
Floor 51p · 1 filing · 16 docs
Floor 41p · 1 filing · 16 docs
Floor 31p · 1 filing · 16 docs
Floor 21p · 1 filing · 16 docs
Floor 11p · 1 filing · 16 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
TITAN CONTRACTING203/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
LUIS PICHARDO, PE704/11/2023
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ENKAY DESIGN CONSULTING1403/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
BUILDTECH ENGINEERING6369110/29/2022
Building Lifecycle
All (30)Filed (7)Violation (1)Objection (1)Special Inspection (21)
04/20/2023
Special inspection requirement — HVAC-R and service water heating system controls
04/20/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
04/20/2023
Special inspection requirement — Duct leakage testing, insulation and design
04/20/2023
Special inspection requirement — Shutoff dampers
04/20/2023
Special inspection requirement — Ventilation and air distribution system
04/20/2023
Special inspection requirement — HVAC-R and service water heating equipment
04/20/2023
Special inspection requirement — Maintenance information
04/18/2023
Objection raised — Scope
04/11/2023
Filed — New Building
PLUMBING SCOPE OF WORK INCONJUNCTION WITH NB MIXED USE DEVELOPMENT.
Q08014693-S1
04/11/2023
Filed — New Building
PLUMBING SCOPE OF WORK INCONJUNCTION WITH NB MIXED USE DEVELOPMENT.
Q08014693-S5
04/11/2023
Filed — New Building
PLUMBING SCOPE OF WORK INCONJUNCTION WITH NB MIXED USE DEVELOPMENT.
Q08014693-S4
04/11/2023
Filed — New Building
PLUMBING SCOPE OF WORK INCONJUNCTION WITH NB MIXED USE DEVELOPMENT.
Q08014693-S3
04/11/2023
Filed — New Building
PLUMBING SCOPE OF WORK INCONJUNCTION WITH NB MIXED USE DEVELOPMENT.
Q08014693-S2
04/11/2023
Filed — New Building
PLUMBING SCOPE OF WORK INCONJUNCTION WITH NB MIXED USE DEVELOPMENT.
Q08014693-S6
04/11/2023
Special inspection requirement — Footing and Foundation
04/11/2023
Special inspection requirement — Concrete - Cast-In-Place
04/11/2023
Special inspection requirement — Preliminary
04/11/2023
Special inspection requirement — Subgrade Inspections
04/11/2023
Special inspection requirement — Construction Operations Influencing Adjacent Structures
04/11/2023
Special inspection requirement — Excavations - Sheeting, Shoring, and Bracing
04/11/2023
Special inspection requirement — Subgrade Inspections
04/11/2023
Special inspection requirement — Subsurface Conditions – Fill Placement & In-Place Density
04/11/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
03/22/2023
Special inspection requirement — Sprinkler Systems
03/22/2023
Special inspection requirement — Final
03/22/2023
Special inspection requirement — Final
03/22/2023
Special inspection requirement — Footing and Foundation
03/22/2023
Special inspection requirement — Mechanical Systems
10/29/2022
Filed — New Building
PLUMBING SCOPE OF WORK INCONJUNCTION WITH NB MIXED USE DEVELOPMENT.
Q08014693-I1
04/23/2013
Violation issued (ECB, closed)
Construction
Nothing on file for this building.
1 project · most recent 04/11/2023
Gas Storm Water/Sanitary
FiledStatusContractorScope
04/11/2023——Gas, Storm, Water/Sanitary
1 project · most recent 01/13/2025
General Wiring
FiledStatusContractorScope
01/13/2025Permit IssuedRAINBOW ELECTRIC CO., INCGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 21
DateRequirementInspectorRole
04/20/2023HVAC-R and service water heating system controls—energy_progress
04/20/2023HVAC-R and service water piping design and insulation—energy_progress
04/20/2023Duct leakage testing, insulation and design—energy_progress
04/20/2023Shutoff dampers—energy_progress
04/20/2023Ventilation and air distribution system—energy_progress
04/20/2023HVAC-R and service water heating equipment—energy_progress
04/20/2023Maintenance information—energy_progress
04/11/2023Footing and Foundation—progress
04/11/2023Concrete - Cast-In-Place—special
04/11/2023Preliminary—progress
04/11/2023Subgrade Inspections—special
04/11/2023Construction Operations Influencing Adjacent Structures—special
04/11/2023Excavations - Sheeting, Shoring, and Bracing—special
04/11/2023Subgrade Inspections—special
04/11/2023Subsurface Conditions – Fill Placement & In-Place Density—special
04/11/2023Subsurface Investigations (Borings/Test Pits)—special
03/22/2023Sprinkler Systems—special
03/22/2023Final—progress
03/22/2023Final—progress
03/22/2023Footing and Foundation—progress
03/22/2023Mechanical Systems—special
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings7
▸DOB NOWPlans/Sketch7
08/25/2026Q08014693-I1Request digital key ↗
08/25/2026Q08014693-S6Request digital key ↗
08/25/2026Q08014693-S1Request digital key ↗
Showing 3 of 7 on file for this type
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZD1: DOB Zoning Diagram1
08/13/2026Q08014693-I1Open ↗
▸Seals & Professional Certifications7
▸DOB NOWDPL-1: Design Professional Seal & Signature7
08/25/2026Q08014693-S1Open ↗
08/25/2026Q08014693-I1Open ↗
08/25/2026Q08014693-S6Open ↗
Showing 3 of 7 on file for this type
▸Other Documents1
▸DOB NOWSite Survey: Initial1
08/13/2026Q08014693-I1Open ↗