← Back
BuildNYC
Church, synagogue, chapel
88-29 161ST STREET
QUEENS · Jamaica · BIN 4209002
💬 Discuss this project
1954Year Built
2Stories
M1Building Class
R7XZoning
4,880 sfGross Floor Area
1Units
1 Active Violation ▸FDNY Report ↗
Church, synagogue, chapel · Owner of record: Islamic Foundation · 10,100 sf lot · 0.48 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalPlumbingFire ProtectionEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofIslamic Foundation1p · 2 filings · 19 docs
AtticIslamic Foundation14p · 3 filings · 18 docs
Floor 2Islamic Foundation16p · 3 filings · 18 docs
Floor 1Islamic Foundation29p · 8 filings · 18 docs
Site & exteriorIslamic Foundation10p · 3 filings · 18 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Islamic Foundation4510/13/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Tom Petersen Architect108/31/2026
Tabriz Design Group902/03/2026
Tabriz Group Enterprises202/03/2026
Asr Engineering107/29/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Tabriz Group Enterprise203/21/2026
Expediting103/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Precision Home DevelopmentGeneral Contractor804/09/2026
Precision Home DevelopmentScaffold303/21/2026
Kishan PlumbingPlumbing207/08/2026
Titan Services USAScaffold204/09/2026
Gerebuzza ConstructionGeneral Contractor107/08/2026
Dynamic Plumbing & SprinklerFire Protection106/28/2026
Kamtech Restorationspecialty_contractor109/18/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Thomas Petersen Architect7854108/31/2026
Tabriz Group Enterprises3275802/03/2026
Building Lifecycle
All (92)Filed (13)Permit Issued (12)Signed Off (3)Violation (5)Inspection (8)Objection (21)Special Inspection (30)
10/16/2026
Signed off — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01453689-I1
09/17/2026
Permit issued — Solar
Q01453689-I1-SL
08/31/2026
Filed — Alteration
ROOFTOP SOLAR INSTALLATION. NO CHANGE TO USE, OCCUPANCY OR EGRESS.
Q01453689-I1
08/31/2026
Special inspection requirement — Air barrier - visual inspection
TOM PETERSEN
08/31/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
TOM PETERSEN
08/31/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
TOM PETERSEN
08/31/2026
Special inspection requirement — Energy Code Compliance Inspections
TOM PETERSEN
08/31/2026
Special inspection requirement — Final
TOM PETERSEN
03/26/2026
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
03/10/2026
Objection resolved — Resolved
03/10/2026
Objection resolved — Resolved
03/10/2026
Objection resolved — Resolved
02/26/2026
Objection raised — Zoning
02/26/2026
Objection raised — Energy
02/26/2026
Objection raised — Zoning
02/26/2026
Objection raised — Scope
02/19/2026
Signed off — Alteration
Q01101788-I1
02/17/2026
Permit issued — Curb Cut
Q01165667-I1-CC
02/03/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT # Q01152289
Q01262510-P2
02/03/2026
Filed — Alteration CO
DEVELOPED PURSUANT TO ART.II CHAP-4 (COMMUNITY FACILITY) FIRST AND SECOND FLOOR REAR ENLARGEMENT AND INTERIOR MODIFICATION TO EXISTING HOUSE OF WORSHIP.EXIST. CO#400353309
Q01152289-P1
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
02/03/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/03/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
02/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
02/03/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
02/03/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
02/02/2026
Signed off — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01260822-I1
01/08/2026
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT # Q01152289
Q01262510-P1
01/08/2026
Filed — Alteration
Q01165667-I1
01/06/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
BAKHTIAR SHAMLOO
01/06/2026
Special inspection requirement — Private On-Site Storm Water Disposal Systems-, and Detention Facilities, Installation
BAKHTIAR SHAMLOO
01/06/2026
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
Rajasekhar Sakhamuri
11/14/2025
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
09/19/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
09/19/2025
Inspection — Certified Storm Drainage-ST-Piping-Underground
Certified
View inspection ↗
09/19/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
09/08/2025
Permit issued — Mechanical Systems
Q01262934-I1-MS
08/22/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
08/05/2025
Permit issued — Plumbing
Q01262510-I1-PL
08/05/2025
Permit issued — Sprinklers
Q01182713-I1-EW-SP
07/31/2025
Filed — Alteration
Q01262934-I1
07/30/2025
Filed — Alteration
PROPOSED PLUMBING WORK IN CONJUNCTION WITH ALT # Q01152289
Q01262510-I1
07/30/2025
Permit issued — Supported Scaffold
Q01260822-I1-SH
07/30/2025
Permit issued — Supported Scaffold
Q01260822-I1-SF
07/29/2025
Filed — Alteration
INSTALLATION OF 300PSF SIDEWALK SHED AND PIPE SCAFFOLDING AS PER PLANS. ALL EQUIPMENT SHALL COMPLY WITH CH #33 OF THE NYC CODE 2022. NO CHANGE IN USE, OCCUPANCY OR EGRESS UNDER THIS APPLICATION.
Q01260822-I1
06/12/2025
Permit issued — General Construction
Q01152289-I1-GC-CX
04/25/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/05/2025
Permit issued — Foundation
Q01152289-I1-GC-CX
02/18/2025
Filed — Alteration
SPRINKLER FILING FOR EXISTING HOUSE OF WORSHIP, TWO STORY BUILDING. APP # Q01152289.
Q01182713-I1
02/18/2025
Permit issued — Construction Fence
Q01182297-I1-FN
02/18/2025
Special inspection requirement — Sprinkler Systems
BAKHTIAR SHAMLOO
02/17/2025
Filed — Alteration
TEMPORARY PLYWOOD CONSTRUCTION FENCE TO SECURE SITE FOR FUTURE CONSTRUCTION.
Q01182297-I1
01/29/2025
Objection resolved — Addressed
01/29/2025
Objection resolved — Addressed
01/20/2025
Objection resolved — Addressed
01/09/2025
Objection resolved — Addressed
01/09/2025
Objection resolved — Addressed
01/09/2025
Objection resolved — Addressed
01/09/2025
Objection resolved — Addressed
01/09/2025
Special inspection requirement — Lighting in dwelling units
BAKHTIAR SHAMLOO
Latest 60 of 92 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offKamtech Restoration09/17/2026
DOB NOWCurb CutPermit IssuedPrecision Home Development02/17/2026
DOB NOWMechanical SystemsPermit IssuedGerebuzza Construction09/08/2025
DOB NOWPlumbingPermit IssuedN and S Plumbing08/05/2025
DOB NOWSprinklersPermit IssuedCitywide Plumbing, Heating & Sprinkler08/05/2025
DOB NOWSupported ScaffoldSigned-offTitan Services USA07/30/2025
DOB NOWSupported ScaffoldSigned-offTitan Services USA07/30/2025
DOB NOWGeneral ConstructionPermit IssuedPrecision Home Development06/12/2025
DOB NOWFoundationPermit IssuedPrecision Home Development03/05/2025
DOB NOWConstruction FencePermit IssuedPrecision Home Development02/18/2025
DOB NOWPlumbingPermit IssuedN and S Plumbing10/29/2024
DOB NOWGeneral ConstructionSigned-offPrecision Home Development09/03/2024
BISPLISSUEDRock E Small Plumbing & Heating11/04/2005
BISMHISSUEDMond Design02/01/2005
BIS—ISSUEDMasters Mechanical Plumbing and Heating10/06/2003
BIS—ISSUEDMasters Mechanical Plumbing and Heating10/02/2002
BIS—ISSUEDMasters Mechanical Plumbing and Heating03/05/2002
BIS—ISSUEDMasters Mechanical Plumbing and Heating10/19/2001
BISPLISSUEDMaster Mechanical Plumbing04/16/1999
BIS—ISSUEDMasters Mechanical Plumbing and Heating04/16/1999
BIS—ISSUEDMasters Mechanical Plumbing and Heating04/04/1995
BIS—ISSUEDMasters Mechanical Plumbing and Heating02/15/1994
BISPLISSUEDMaster Mechanical Plumbing05/07/1993
BIS—ISSUEDZinai K Hack02/23/1993
1 project · most recent 02/18/2025
FiledStatusContractorScope
02/18/2025Permit IssuedDynamic Plumbing & Sprinkler50 heads
1 project · most recent 02/03/2026
Gas Storm Water/Sanitary
FiledStatusContractorScope
02/03/2026Permit IssuedKishan PlumbingGas, Storm, Water/Sanitary
3 projects · most recent 08/28/2026
General Wiring
FiledStatusContractorScope
08/28/2026CompleteBerger Quality Electrical Con—
06/05/2026CompleteDNR ElectricGeneral Wiring
07/31/2025CompleteRichard Neu—
1 project · most recent 02/03/2026
Steel Masonry
FiledStatusContractorScope
02/03/2026Permit IssuedPrecision Home DevelopmentSteel, Masonry
1 project · most recent 08/31/2026
FiledStatusContractorScope
08/31/2026Signed-offKamtech Restoration12 panels, 5.28 kw, 252.24 roof_area_sqft
1 project · most recent 02/17/2025
Fence
FiledStatusContractorScope
02/17/2025Permit IssuedPrecision Home DevelopmentFence
▾Field Inspections (DOB CAP) — 8
DateTypeResultReport
03/26/2026Pass-Final PL - Up to 3 Requested FloorsPassView ↗
09/19/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
09/19/2025Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/19/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
08/22/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
04/25/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
12/10/2024Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
12/10/2024Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 41
DateRequirementInspectorRole
08/31/2026Air barrier - visual inspectionTOM PETERSENenergy_progress
08/31/2026Structural Stability – Alterations of existing buildingsTOM PETERSENspecial
08/31/2026Fire-Resistant Penetrations and JointsTOM PETERSENspecial
08/31/2026Energy Code Compliance InspectionsTOM PETERSENprogress
08/31/2026FinalTOM PETERSENprogress
02/03/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
02/03/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/03/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
02/03/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
02/03/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
02/03/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
01/06/2026Fire-Resistant Penetrations and JointsBAKHTIAR SHAMLOOspecial
01/06/2026Private On-Site Storm Water Disposal Systems-, and Detention Facilities, InstallationBAKHTIAR SHAMLOOspecial
01/06/2026Subsurface Investigations (Borings/Test Pits)Rajasekhar Sakhamurispecial
02/18/2025Sprinkler SystemsBAKHTIAR SHAMLOOspecial
01/09/2025Lighting in dwelling unitsBAKHTIAR SHAMLOOenergy_progress
12/09/2024Lighting controlsBAKHTIAR SHAMLOOenergy_progress
12/09/2024Insulation placement and R valuesBAKHTIAR SHAMLOOenergy_progress
12/09/2024Permanent certificateBAKHTIAR SHAMLOOenergy_progress
12/09/2024Fenestration and door U-factor and product ratingsBAKHTIAR SHAMLOOenergy_progress
12/09/2024Air barrier - visual inspectionBAKHTIAR SHAMLOOenergy_progress
12/09/2024Interior lighting powerBAKHTIAR SHAMLOOenergy_progress
12/09/2024Fenestration areasBAKHTIAR SHAMLOOenergy_progress
12/09/2024Maintenance informationBAKHTIAR SHAMLOOenergy_progress
12/09/2024Exterior lighting powerBAKHTIAR SHAMLOOenergy_progress
Latest 25 of 41.
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Islamic FoundationReligiousEntire building
Project Q01453689 Alteration · LOC Issued · 08/31/2026
Project Q01262934 Alteration · Permit Entire · 07/31/2025
Project Q01262510 Alteration · Permit Entire · 07/30/2025
Project Q01260822 Alteration · LOC Issued · 07/29/2025
Project Q01182713 Alteration · Permit Entire · 02/18/2025
Project Q01182297 Alteration · Permit Entire · 02/17/2025
Project Q01152289 Alteration CO · Permit Entire · 12/10/2024
Project Q01101788 Alteration · LOC Issued · 08/28/2024
Project Q01102061 Alteration · Permit Entire · 08/28/2024
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 74 on file (BIS + DOB NOW)
▸Plans & Drawings9
▸DOB NOWPlans/Sketch9
10/13/2026Q01453689-I1Request digital key ↗
08/21/2026Q01102061-I1Request digital key ↗
08/21/2026Q01101788-I1Request digital key ↗
Showing 3 of 9 on file for this type
▸Zoning, Tax Lot & Property Records4
▸DOB NOWZD1: DOB Zoning Diagram2
08/13/2026Q01152289-I1Open ↗
08/13/2026Q01152289-P1Open ↗
▸DOB NOWZoning Exhibit form (1-5)2
08/13/2026Q01152289-I1Open ↗
08/13/2026Q01152289-P1Open ↗
▸Seals & Professional Certifications23
▸DOB NOWSpecial Inspector Seal & Signature10
09/01/2026Q01182713-I1Open ↗
09/01/2026Q01101788-I1Open ↗
09/01/2026Q01262510-P2Open ↗
Showing 3 of 10 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature9
09/18/2026Q01453689-I1Open ↗
08/21/2026Q01102061-I1Open ↗
08/20/2026Q01182297-I1Open ↗
Showing 3 of 9 on file for this type
▸DOB NOWProgress Inspector Seal & Signature4
09/01/2026Q01101788-I1Open ↗
08/29/2026Q01152289-I1Open ↗
08/29/2026Q01152289-I1Open ↗
Showing 3 of 4 on file for this type
▸Safety & Tenant Protection3
▸DOB NOWStreet Tree Checklist2
08/13/2026Q01152289-P1Open ↗
08/13/2026Q01152289-I1Open ↗
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan1
08/13/2026Q01152289-I1Open ↗
▸Environmental & Asbestos7
▸DOB NOWDEP ACP-5: Asbestos Assessment Report7
09/18/2026Q01453689-I1Open ↗
08/21/2026Q01102061-I1Open ↗
08/19/2026Q01262934-I1Open ↗
Showing 3 of 7 on file for this type
▸Inspections & Test Reports7
▸DOB NOWSOIL REPORT5
08/13/2026Q01152289-I1Open ↗
08/13/2026Q01262510-P2Open ↗
08/13/2026Q01152289-P1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWTR4 Test Report and Plot Diagram2
08/13/2026Q01152289-I1Open ↗
08/13/2026Q01262510-I1Open ↗
▸Approvals, Objections & Sign-offs9
▸DOB NOWFee Exempt Supporting Document - DOF ACRIS report or BIB letter8
09/18/2026Q01453689-I1Open ↗
08/19/2026Q01262934-I1Open ↗
08/13/2026Q01152289-P1Open ↗
Showing 3 of 8 on file for this type
▸DOB NOWUtility Company Final Acceptance Letter1
10/20/2026Q01453689-I1Open ↗
▸Other Documents12
▸DOB NOWFee Exempt Supporting Document - DOF Property Tax Assessment Roll3
08/13/2026Q01262510-P2Open ↗
08/13/2026Q01262510-I1Open ↗
08/13/2026Q01262510-P1Open ↗
▸DOB NOWSite Survey: Initial2
08/13/2026Q01152289-I1Open ↗
08/13/2026Q01152289-P1Open ↗
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone2
08/14/2026Q01152289-P1Open ↗
08/13/2026Q01152289-I1Open ↗
▸DOB NOWPlot Diagram2
08/13/2026Q01152289-I1Open ↗
08/13/2026Q01152289-P1Open ↗
▸DOB NOWProperty Ownership Certification2
08/17/2026Q01152289-I1Open ↗
08/14/2026Q01152289-P1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/13/2026Q01152289-I1Open ↗