← Back
Three families
88-30 43RD AVENUE
QUEENS · BIN 4625420
💬 Discuss this project
2022Year Built
3Stories
C0Building Class
R5Zoning
3,522 sfGross Floor Area
3Units
Three families · 2,800 sf lot · 1.26 FAR built · Flood zone X
Locations of Work
ArchitecturePlumbingFire Protection
Roof7p · 3 filings · 20 docs
Floor 35p · 1 filing · 20 docs
Floor 25p · 1 filing · 20 docs
Floor 16p · 2 filings · 20 docs
Cellar7p · 3 filings · 20 docs
Basement5p · 1 filing · 20 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
TAN ARCHITECT P.C1904/26/2025
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NEW DA HUA INCGeneral Contractor1907/08/2026
XH&RC PLBG AND HTG INCPlumbing207/08/2026
KJK ELECTRIC INCElectrical103/22/2026
XH&RC PLBG AND HTG INCFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
G ENGINEERING PC77781304/26/2025
Building Lifecycle
All (103)Filed (16)Permit Issued (10)Signed Off (5)Inspection (14)Objection (28)Special Inspection (30)
06/17/2025
Special inspection requirement — Fenestration areas
XIONGCAI GU
06/17/2025
Special inspection requirement — Air barrier - visual inspection
XIONGCAI GU
06/17/2025
Special inspection requirement — Insulation placement and R values
XIONGCAI GU
06/17/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIONGCAI GU
06/17/2025
Special inspection requirement — Fenestration air leakage
XIONGCAI GU
06/17/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
06/17/2025
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
06/17/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
04/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
04/28/2025
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
04/28/2025
Special inspection requirement — Air barrier - visual inspection
XIONGCAI GU
04/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIONGCAI GU
04/28/2025
Special inspection requirement — Insulation placement and R values
XIONGCAI GU
04/28/2025
Special inspection requirement — Fenestration areas
XIONGCAI GU
04/28/2025
Special inspection requirement — Fenestration air leakage
XIONGCAI GU
04/28/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
04/28/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
04/28/2025
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
04/28/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIONGCAI GU
04/28/2025
Special inspection requirement — Fenestration air leakage
XIONGCAI GU
04/28/2025
Special inspection requirement — Insulation placement and R values
XIONGCAI GU
04/28/2025
Special inspection requirement — Air barrier - visual inspection
XIONGCAI GU
04/28/2025
Special inspection requirement — Fenestration areas
XIONGCAI GU
04/26/2025
Filed — New Building
PROPOSED 4 STORY 3 FAMILY DWELLINGS
Q00685584-A4
04/24/2025
Special inspection requirement — Fenestration areas
XIONGCAI GU
04/24/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
XIONGCAI GU
04/24/2025
Special inspection requirement — Energy Code Compliance Inspections
XIONGCAI GU
04/24/2025
Special inspection requirement — Fire-Resistance Rated Construction
XIONGCAI GU
04/24/2025
Special inspection requirement — Fenestration and door U-factor and product ratings
XIONGCAI GU
04/24/2025
Special inspection requirement — Air barrier - visual inspection
XIONGCAI GU
03/21/2025
Filed — New Building
PROPOSED 4 STORY 3 FAMILY DWELLINGS
Q00685584-A2
03/14/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
01/03/2025
Objection resolved — Addressed
01/02/2025
Objection raised — Structural
12/16/2024
Filed — New Building
PROPOSED 4 STORY 3 FAMILY DWELLINGS
Q00685584-A1
10/03/2024
Filed — New Building
PROPOSED 4 STORY 3 FAMILY DWELLINGS
Q00685584-P7
10/03/2024
Permit issued — General Construction
Q00685584-I1-GC
09/23/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/29/2024
Objection resolved — Addressed
08/27/2024
Objection raised — Other
08/15/2024
Filed — New Building
PROPOSED 4 STORY 3 FAMILY DWELLINGS
Q00685584-P6
07/31/2024
Signed off — New Building
PROPOSED 4 STORY 3 FAMILY DWELLINGS
Q00685584-S2
06/18/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/03/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
05/23/2024
Signed off — Alteration
PROPOSED PLUMBING WORK ON A PROPOSED 4 STORY 3 FAMILY DWELLINGS
Q00719010-I1
05/23/2024
Signed off — Alteration
PROPOSED INSTALLATION OF SPRINKLER SYSTEM FOR A 4-STORY 3-FAMILY DWELLINGS.
Q00718839-I1
04/25/2024
Filed — Alteration
PROPOSED PLUMBING WORK ON A PROPOSED 4 STORY 3 FAMILY DWELLINGS
Q00719010-P1
04/11/2024
Signed off — New Building
PROPOSED 4 STORY 3 FAMILY DWELLINGS
Q00685584-S1
04/09/2024
Signed off — Alteration
PROPOSED 12' CURBCUT INCLUDING SPLAY
Q00723843-I1
04/08/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
03/22/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/19/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/15/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
02/12/2024
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
02/06/2024
Filed — Alteration
PROPOSED INSTALLATION OF SPRINKLER SYSTEM FOR A 4-STORY 3-FAMILY DWELLINGS.
Q00718839-P1
02/05/2024
Permit issued — Curb Cut
Q00723843-I1-CC
02/03/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
01/23/2024
Permit issued — Plumbing
Q00719010-I1-PL
01/23/2024
Permit issued — Sprinklers
Q00718839-I1-EW-SP
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedNEW DA HUA INC10/03/2024
DOB NOWCurb CutSigned-offNEW DA HUA INC02/05/2024
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC01/23/2024
DOB NOWSprinklersSigned-offXH&RC PLBG AND HTG INC01/23/2024
DOB NOWPlumbingSigned-offXH&RC PLBG AND HTG INC01/17/2023
DOB NOWGeneral ConstructionPermit IssuedNEW DA HUA INC01/04/2023
DOB NOWStructuralSigned-offNEW DA HUA INC01/04/2023
DOB NOWGeneral ConstructionPermit IssuedNEW DA HUA INC09/12/2022
DOB NOWStructuralSigned-offNEW DA HUA INC09/12/2022
DOB NOWSupport of ExcavationSigned-offNEW DA HUA INC09/08/2022
1 project · most recent 02/05/2024
General Wiring
FiledStatusContractorScope
02/05/2024CompleteKJK ELECTRIC INCGeneral Wiring
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
03/14/2025Pass-Final CND-Occupancy InspectionPassView ↗
09/23/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/18/2024Pass-Final CND-Occupancy InspectionPassView ↗
06/03/2024Pass-Final CND-Occupancy InspectionPassView ↗
04/08/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
03/22/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/19/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/15/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
02/12/2024Pass-Final CND-Occupancy InspectionPassView ↗
02/03/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/14/2023Certified Gas-Gas-Piping-RoughingCertifiedView ↗
07/14/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
03/02/2023Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
03/02/2023Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 58
DateRequirementInspectorRole
06/17/2025Fenestration areasXIONGCAI GUenergy_progress
06/17/2025Air barrier - visual inspectionXIONGCAI GUenergy_progress
06/17/2025Insulation placement and R valuesXIONGCAI GUenergy_progress
06/17/2025Fenestration and door U-factor and product ratingsXIONGCAI GUenergy_progress
06/17/2025Fenestration air leakageXIONGCAI GUenergy_progress
06/17/2025Fire-Resistance Rated ConstructionXIONGCAI GUprogress
06/17/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
06/17/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
04/28/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
04/28/2025Fire-Resistance Rated ConstructionXIONGCAI GUprogress
04/28/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
04/28/2025Air barrier - visual inspectionXIONGCAI GUenergy_progress
04/28/2025Fenestration and door U-factor and product ratingsXIONGCAI GUenergy_progress
04/28/2025Insulation placement and R valuesXIONGCAI GUenergy_progress
04/28/2025Fenestration areasXIONGCAI GUenergy_progress
04/28/2025Fenestration air leakageXIONGCAI GUenergy_progress
04/28/2025Fire-Resistant Penetrations and JointsXIONGCAI GUspecial
04/28/2025Fire-Resistance Rated ConstructionXIONGCAI GUprogress
04/28/2025Energy Code Compliance InspectionsXIONGCAI GUprogress
04/28/2025Fenestration and door U-factor and product ratingsXIONGCAI GUenergy_progress
04/28/2025Fenestration air leakageXIONGCAI GUenergy_progress
04/28/2025Insulation placement and R valuesXIONGCAI GUenergy_progress
04/28/2025Air barrier - visual inspectionXIONGCAI GUenergy_progress
04/28/2025Fenestration areasXIONGCAI GUenergy_progress
04/24/2025Fenestration areasXIONGCAI GUenergy_progress
Latest 25 of 58.
▾Documents — 173 on file (BIS + DOB NOW)
▸Plans & Drawings19
▸DOB NOWPlans/Sketch19
08/26/2026Q00718839-P1Request digital key ↗
08/24/2026Q00723843-I1Request digital key ↗
08/22/2026Q00719010-P1Request digital key ↗
Showing 3 of 19 on file for this type
▸Zoning, Tax Lot & Property Records19
▸DOB NOWZD1: DOB Zoning Diagram11
08/21/2026Q00685584-A2Open ↗
08/21/2026Q00685584-A1Open ↗
08/21/2026Q00685584-P9Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWZoning Exhibit form (1-5)7
08/21/2026Q00685584-A2Open ↗
08/21/2026Q00685584-A1Open ↗
08/21/2026Q00685584-P9Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWHouse Number Verification: TOPO Stamp1
08/21/2026Q00685584-I1Open ↗
▸Seals & Professional Certifications69
▸DOB NOWProgress Inspector Seal & Signature43
09/02/2026Q00685584-P9Open ↗
09/02/2026Q00685584-P9Open ↗
09/02/2026Q00685584-P9Open ↗
Showing 3 of 43 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature19
08/26/2026Q00718839-P1Open ↗
08/26/2026Q00718839-I1Open ↗
08/22/2026Q00719010-P1Open ↗
Showing 3 of 19 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature7
09/02/2026Q00685584-P9Open ↗
09/01/2026Q00685584-A3Open ↗
09/01/2026Q00685584-A5Open ↗
Showing 3 of 7 on file for this type
▸Trade Schedules & Equipment11
▸DOB NOWDEP: Sewer Certification (Sanitary/Storm)11
08/21/2026Q00685584-A1Open ↗
08/21/2026Q00685584-P9Open ↗
08/21/2026Q00685584-P7Open ↗
Showing 3 of 11 on file for this type
▸Safety & Tenant Protection15
▸DOB NOWStreet Tree Checklist11
08/21/2026Q00685584-A2Open ↗
08/21/2026Q00685584-A1Open ↗
08/21/2026Q00685584-P9Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWParks Department Acknowledgment Letter for Street Trees Plan2
08/21/2026Q00685584-S2Open ↗
08/21/2026Q00685584-I1Open ↗
▸DOB NOWStreet Tree Sign Off1
08/21/2026Q00685584-I1Open ↗
▸DOB NOWStreet Trees Site Plan1
08/21/2026Q00685584-I1Open ↗
▸Energy Compliance1
▸DOB NOWEN2: As Built Energy Analysis1
08/21/2026Q00685584-I1Open ↗
▸Inspections & Test Reports2
▸DOB NOWTR4 Test Report and Plot Diagram1
08/21/2026Q00685584-S2Open ↗
▸DOB NOWSOIL REPORT1
08/21/2026Q00685584-S2Open ↗
▸Other Documents37
▸DOB NOWProperty Ownership Certification12
08/21/2026Q00685584-A1Open ↗
08/21/2026Q00685584-P9Open ↗
08/21/2026Q00685584-P7Open ↗
Showing 3 of 12 on file for this type
▸DOB NOWSite Survey: Initial11
08/21/2026Q00685584-A1Open ↗
08/21/2026Q00685584-P9Open ↗
08/21/2026Q00685584-P7Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWLocal Law 92/94 of 2019 Sustainable Roof Zone11
08/21/2026Q00685584-A1Open ↗
08/21/2026Q00685584-P9Open ↗
08/21/2026Q00685584-P7Open ↗
Showing 3 of 11 on file for this type
▸DOB NOWProject Specific General Liability (PGL1)1
08/21/2026Q00685584-I1Open ↗
▸DOB NOWFinal Survey1
08/21/2026Q00685584-I1Open ↗
▸DOB NOWAdjoining Owners Notification1
08/21/2026Q00685584-S1Open ↗