Elevator apt, semi-fireproof with stores
138-45 JAMAICA AVENUE
QUEENS · BIN 4623670
💬 Discuss this project
2022Year Built
8Stories
D7Building Class
R7XZoning
80,006 sfGross Floor Area
83Units
LL97 CoveredRent Stabilized10 Open Violations ▸FDNY Report ↗
Elevator apt, semi-fireproof with stores · Owner of record: ZDJ JAMAICA LLC · 15,028 sf lot · 5.32 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralMechanicalPlumbingFire ProtectionEquipmentCivil
Roof14p · 7 filings · 20 docs
Bulkhead5p · 4 filings · 14 docs
Floor 84p · 4 filings · 8 docs
Floor 79p · 7 filings · 20 docs
Floor 69p · 6 filings · 20 docs
Floor 510p · 8 filings · 20 docs
Floor 411p · 7 filings · 20 docs
Floor 34p · 4 filings · 17 docs
Floor 211p · 7 filings · 20 docs
Floor 15p · 3 filings · 20 docs
Cellar9p · 6 filings · 20 docs
Sub-Cellar4p · 4 filings · 8 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
ZDJ JAMAICA LLC103/22/2026
WARNER CONSTRUCTION SERVI1603/22/2026
KING CONTRACTING GROUP303/22/2026
CONSTRUCTION SERVI WARNER203/22/2026
VIK XS SERVICES603/21/2026
▾Design Consultants (Architect / Engineer of Record)
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES1103/21/2026
AO CONSULTING AND DRAFTING603/21/2026
JM ZONING, LLC.1203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WARNER CONSTRUCTION SERVIGeneral Contractor1707/08/2026
CONSOLIDATED SCAFFOLDINGGeneral Contractor1007/08/2026
PLUMBING & HTG DOCTOR INCFire Protection207/08/2026
CROSSFIELD PLBG.&HTG.CORPFire Protection207/08/2026
HV ELECTRIC CORPElectrical103/22/2026
AP PLUMBING & HVAC LLCPlumbing107/08/2026
PLUMBING & HTG DOCTOR INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
GRAND INSPECTION & CONSUL67921304/25/2024
Building Lifecycle
All (171)Filed (31)Permit Issued (19)Signed Off (10)Violation (25)Inspection (14)Objection (42)Special Inspection (30)
02/24/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF BUILDING CODE OF 2014
Q08021084-I1
02/24/2025
Signed off — Alteration
INSTALLATION OF A HEAVY DUTY SIDEWALK SHED AS PER PLANS DURING GENERAL CONSTRUCTION WORK. NO CHANGE IN USE, EGRESS OR OCCUPANCY. SIDEWALK SHED TO COMPLY WITH CHAPTER 33 OF BUILDING CODE OF 2014
Q08021084-S1
01/31/2025
Signed off — Alteration
HEREWITH NEW APPLICATION FOR FIRE PROTECTION SYSTEM
Q00760938-I1
06/18/2024
Signed off — Alteration
Curb Cut filed in conjunction with NB# 421133972.
Q00533956-I1
06/12/2024
Inspection — Pass-Final Curb Cut Non-Directive 14
Pass
View inspection ↗
05/23/2024
Signed off — Alteration
HEREWITH FILING FOR THE INSTALLATION OF NEW HVAC SYSTEM.
Q00760900-I1
05/23/2024
Signed off — Alteration
HEREWITH FILING FOR THE INSTALLATION OF NEW PLUMBING SYSTEM.
Q00760927-I1
05/16/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
05/02/2024
Special inspection requirement — Post-installed Anchors
RUWAN RAJAPAKSE
05/02/2024
Special inspection requirement — Energy Code Compliance Inspections
RUWAN RAJAPAKSE
05/02/2024
Special inspection requirement — Heating Systems
RUWAN RAJAPAKSE
05/02/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
05/02/2024
Special inspection requirement — Final
RUWAN RAJAPAKSE
05/02/2024
Special inspection requirement — Mechanical Systems
RUWAN RAJAPAKSE
04/25/2024
Filed — Alteration
HEREWITH FILING FOR THE INSTALLATION OF NEW HVAC SYSTEM.
Q00760900-P1
04/24/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
04/22/2024
Special inspection requirement — Maintenance information
RUWAN RAJAPAKSE
04/22/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
04/22/2024
Special inspection requirement — Post-installed Anchors
RUWAN RAJAPAKSE
04/22/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
RUWAN RAJAPAKSE
04/22/2024
Special inspection requirement — HVAC-R and service water heating equipment
RUWAN RAJAPAKSE
04/22/2024
Special inspection requirement — Mechanical Systems
RUWAN RAJAPAKSE
04/22/2024
Special inspection requirement — Final
RUWAN RAJAPAKSE
04/22/2024
Special inspection requirement — HVAC-R and service water heating system controls
RUWAN RAJAPAKSE
04/22/2024
Special inspection requirement — Heating Systems
RUWAN RAJAPAKSE
04/22/2024
Special inspection requirement — Shutoff dampers
RUWAN RAJAPAKSE
04/22/2024
Special inspection requirement — Energy Code Compliance Inspections
RUWAN RAJAPAKSE
04/08/2024
Signed off — Alteration
Installation of a temporary construction fence filed in conjunction with the NB, job number: 421133972
Q00737300-I1
04/05/2024
Filed — Alteration
Curb Cut filed in conjunction with NB# 421133972.
Q00533956-P1
04/02/2024
Signed off — Alteration
Foundation / Earthwork work types filed in conjunction with NB job number: 421133972
Q00716752-I1
03/29/2024
Permit issued — Mechanical Systems
Q00760900-I1-MS
03/18/2024
Inspection — Fail-Final Curb Cut Non-Directive 14
Fail
View inspection ↗
03/12/2024
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/08/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/29/2024
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
02/21/2024
Permit issued — Curb Cut
Q00533956-I1-CC
02/21/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
RUWAN RAJAPAKSE
02/21/2024
Special inspection requirement — Sprinkler Systems
RUWAN RAJAPAKSE
02/21/2024
Special inspection requirement — Standpipe Systems
RUWAN RAJAPAKSE
02/08/2024
Objection resolved — Addressed
02/06/2024
Objection raised — Other
02/05/2024
Signed off — Alteration
SUPERSTRUCTURAL DESIGN IN CONJUNCTION WITH NB 421133972
Q00793741-I1
01/29/2024
Special inspection requirement — Concrete - Cast-In-Place
RUWAN RAJAPAKSE
01/29/2024
Special inspection requirement — Final
RUWAN RAJAPAKSE
01/29/2024
Special inspection requirement — Masonry
RUWAN RAJAPAKSE
01/26/2024
Special inspection requirement — Subgrade Inspections
RUWAN RAJAPAKSE
01/26/2024
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
PATRICK MAHON
01/26/2024
Special inspection requirement — Footing and Foundation
RUWAN RAJAPAKSE
01/26/2024
Special inspection requirement — Concrete - Cast-In-Place
RUWAN RAJAPAKSE
01/26/2024
Special inspection requirement — Final
RUWAN RAJAPAKSE
01/24/2024
Filed — Alteration
HEREWITH NEW APPLICATION FOR FIRE PROTECTION SYSTEM
Q00760938-P2
01/18/2024
Filed — Alteration
SUPERSTRUCTURAL DESIGN IN CONJUNCTION WITH NB 421133972
Q00793741-P1
01/18/2024
Filed — Alteration
Foundation / Earthwork work types filed in conjunction with NB job number: 421133972
Q00716752-P1
01/17/2024
Special inspection requirement — Concrete - Cast-In-Place
RUWAN RAJAPAKSE
01/17/2024
Special inspection requirement — Final
RUWAN RAJAPAKSE
12/13/2023
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
12/04/2023
Signed off — Alteration
SOE work type hereby filed in conjunction with NB job number: 421133972
Q00719173-I1
11/13/2023
Violation issued (ECB, closed)
Construction
11/13/2023
Violation issued (ECB, closed)
Construction
11/13/2023
Violation issued (ECB, closed)
Construction
Latest 60 of 171 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsSigned-offWARNER CONSTRUCTION SERVI03/29/2024
DOB NOWCurb CutSigned-offWARNER CONSTRUCTION SERVI02/21/2024
DOB NOWStructuralSigned-offWARNER CONSTRUCTION SERVI08/24/2023
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING07/12/2023
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING07/12/2023
DOB NOWConstruction FenceSigned-offWARNER CONSTRUCTION SERVI05/08/2023
DOB NOWSprinklersSigned-offCROSSFIELD PLBG.&HTG.CORP04/29/2023
DOB NOWStandpipeSigned-offCROSSFIELD PLBG.&HTG.CORP04/20/2023
DOB NOWPlumbingSigned-offCROSSFIELD PLBG.&HTG04/18/2023
DOB NOWMechanical SystemsSigned-offWARNER CONSTRUCTION SERVI03/28/2023
DOB NOWStandpipeSigned-offPLUMBING & HTG DOCTOR INC12/29/2022
DOB NOWStandpipeSigned-offPLUMBING & HTG DOCTOR INC12/29/2022
DOB NOWSupported ScaffoldSigned-offCONSOLIDATED SCAFFOLDING10/28/2022
DOB NOWSidewalk ShedSigned-offCONSOLIDATED SCAFFOLDING10/18/2022
DOB NOWStructuralSigned-offWARNER CONSTRUCTION SERVI09/08/2022
DOB NOWPlumbingSigned-offMATHEW WEISS09/08/2022
DOB NOWSupport of ExcavationSigned-offWARNER CONSTRUCTION SERVI05/17/2022
DOB NOWConstruction FenceSigned-offWARNER CONSTRUCTION SERVI05/17/2022
DOB NOWFoundationSigned-offWARNER CONSTRUCTION SERVI05/16/2022
BIS—ISSUEDWARNER CONSTRUCTION SERVI09/06/2023
BIS—ISSUEDWARNER CONSTRUCTION SERVI12/29/2022
BIS—ISSUEDWARNER CONSTRUCTION SERVI12/28/2022
1 project · most recent 06/22/2021
FiledStatusContractorScope
06/22/2021——20 outlets
5 projects · most recent 11/09/2023
General Wiring
FiledStatusContractorScope
11/09/2023CompleteHV ELECTRIC CORPGeneral Wiring
03/22/2023CompleteHV ELECTRIC CORPGeneral Wiring
10/17/2022CompleteSOLAS ELECTRICAL CORP—
09/12/2022CompleteR.C.M. ELECTRIC CORP.—
06/02/2022CompleteHV ELECTRIC CORP—
▾Field Inspections (DOB CAP) — 14
DateTypeResultReport
06/12/2024Pass-Final Curb Cut Non-Directive 14PassView ↗
05/16/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
04/24/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/18/2024Fail-Final Curb Cut Non-Directive 14FailView ↗
03/12/2024Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/08/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
02/29/2024Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
07/10/2023Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
07/06/2023Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/13/2023Fail-Final PL - Up to 3 Requested FloorsFailView ↗
05/24/2023Certified Storm Drainage-ST-Piping-RoughingCertifiedView ↗
05/24/2023Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
09/30/2022Certified Storm Drainage-ST-Piping-UndergroundCertifiedView ↗
09/30/2022Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 62
DateRequirementInspectorRole
05/02/2024Post-installed AnchorsRUWAN RAJAPAKSEspecial
05/02/2024Heating SystemsRUWAN RAJAPAKSEspecial
05/02/2024Energy Code Compliance InspectionsRUWAN RAJAPAKSEprogress
05/02/2024FinalRUWAN RAJAPAKSEprogress
05/02/2024Mechanical SystemsRUWAN RAJAPAKSEspecial
05/02/2024Fire-Resistant Penetrations and JointsRUWAN RAJAPAKSEspecial
04/22/2024FinalRUWAN RAJAPAKSEprogress
04/22/2024Energy Code Compliance InspectionsRUWAN RAJAPAKSEprogress
04/22/2024Post-installed AnchorsRUWAN RAJAPAKSEspecial
04/22/2024Mechanical SystemsRUWAN RAJAPAKSEspecial
04/22/2024Fire-Resistant Penetrations and JointsRUWAN RAJAPAKSEspecial
04/22/2024Heating SystemsRUWAN RAJAPAKSEspecial
04/22/2024HVAC-R and service water heating equipmentRUWAN RAJAPAKSEenergy_progress
04/22/2024HVAC-R and service water piping design and insulationRUWAN RAJAPAKSEenergy_progress
04/22/2024Maintenance informationRUWAN RAJAPAKSEenergy_progress
04/22/2024Shutoff dampersRUWAN RAJAPAKSEenergy_progress
04/22/2024HVAC-R and service water heating system controlsRUWAN RAJAPAKSEenergy_progress
02/21/2024Standpipe SystemsRUWAN RAJAPAKSEspecial
02/21/2024Fire-Resistant Penetrations and JointsRUWAN RAJAPAKSEspecial
02/21/2024Sprinkler SystemsRUWAN RAJAPAKSEspecial
01/29/2024MasonryRUWAN RAJAPAKSEspecial
01/29/2024FinalRUWAN RAJAPAKSEprogress
01/29/2024Concrete - Cast-In-PlaceRUWAN RAJAPAKSEspecial
01/26/2024FinalRUWAN RAJAPAKSEprogress
01/26/2024Footing and FoundationRUWAN RAJAPAKSEprogress
Latest 25 of 62.
▾Documents — 235 on file (BIS + DOB NOW)
▸Plans & Drawings31
▸DOB NOWPlans/Sketch31
08/27/2026Q00510513-I1Request digital key ↗
08/27/2026Q00510547-I1Request digital key ↗
08/27/2026Q00521466-I1Request digital key ↗
Showing 3 of 31 on file for this type
▸Applications & Permits24
▸BISPLAN / WORK APPROVAL APPLICATION14
01/31/2024421133972Open ↗
01/25/2024421133972Open ↗
01/24/2024421133972Open ↗
Showing 3 of 14 on file for this type
▸BISWORK PERMIT APPLICATION7
03/06/2023421133972Open ↗
03/06/2023421133972Open ↗
03/06/2023421133972Open ↗
Showing 3 of 7 on file for this type
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
06/24/2021421133972Open ↗
▸BISBPP-5 - Authorization to the Department of Transportation1
07/25/2023440677947Open ↗
▸BISDOT 410 PERMITS FOR ADA RAMPS1
08/05/2025440677947Open ↗
▸Zoning, Tax Lot & Property Records10
▸BISZONING DIAGRAM4
02/22/2024421133972Open ↗
07/26/2022421133972Open ↗
07/21/2022421133972Open ↗
Showing 3 of 4 on file for this type
▸BISZONING EXHIBIT V1
11/29/2022421133972Open ↗
▸BISRECORDED LIGHT AND AIR EASEMENT1
11/29/2022421133972Open ↗
▸BISZONING EXHIBIT III1
11/29/2022421133972Open ↗
▸BISZONING EXHIBIT IV1
11/29/2022421133972Open ↗
▸BISVERIFY TAX LOT1
12/25/2023421133972Open ↗
▸BISADDRESS: NEW HOUSE NUMBER APPROVED1
06/24/2021421133972Open ↗
▸Seals & Professional Certifications56
▸DOB NOWDPL-1: Design Professional Seal & Signature31
08/27/2026Q00510513-I1Open ↗
08/27/2026Q00510547-I1Open ↗
08/27/2026Q00521466-I1Open ↗
Showing 3 of 31 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature13
08/31/2026Q00760927-I1Open ↗
08/31/2026Q00793741-P1Open ↗
08/29/2026Q00760938-I1Open ↗
Showing 3 of 13 on file for this type
▸DOB NOWProgress Inspector Seal & Signature9
08/31/2026Q00760927-I1Open ↗
08/31/2026Q00793741-P1Open ↗
08/28/2026Q00760900-P1Open ↗
Showing 3 of 9 on file for this type
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION1
03/06/2023421133972Open ↗
▸BISAPPLICANT OWNER SIGNATURE1
06/11/2021440677947Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY1
06/11/2021440677947Open ↗
▸Trade Schedules & Equipment4
▸BISFA - FDNY APPROVAL : FD-FAA1
08/28/2024421133972Open ↗
▸BISDEP STORMWATER SEWER CERTIFICATION (HCP/SCP)1
02/22/2024421133972Open ↗
▸BISDETECTOR:SMOKE-CERT. OF INSTALLATION1
08/27/2025421133972Open ↗
▸BISDEP SANITARY SEWER CERTIFICATION (HCP/SCP)1
02/22/2024421133972Open ↗
▸Safety & Tenant Protection7
▸BISSTREET TREE CHECKLIST4
08/07/2023440677947Open ↗
07/25/2023440677947Open ↗
06/07/2023440677947Open ↗
Showing 3 of 4 on file for this type
▸BISSTREET TREE SIGNOFF1
02/15/2024421133972Open ↗
▸BISSTREET TREES: RECEIPT OF STREET TREES SITE PLAN1
12/28/2022421133972Open ↗
▸BISSTREET TREES SITE PLAN1
02/29/2024421133972Open ↗
▸Energy Compliance27
▸BISELECTRICAL ENERGY CONSUMPTION2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISEXTERIOR LIGHTING POWER2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISFENESTRATION AIR LEAKAGE2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISAIR SEALING AND INSULATION - VISUAL2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISINTERIOR LIGHTING POWER2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISFENESTRATION U-FACTOR & PRODUCT RATING2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISTECHNICAL REPORT: ENERGY CODE - RESPONSIBILITY2
05/17/2024421133972Open ↗
05/17/2024421133972Open ↗
▸BISINSULATION PLACEMENT & R VALUES2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISLIGHTING IN DWELLING UNITS2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISLIGHTING CONTROLS2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸DOB NOWPreliminary Commissioning Report Certification2
08/13/2026Q00760900-I1Open ↗
08/13/2026Q00760927-I1Open ↗
▸DOB NOWEN2: As Built Energy Analysis2
08/13/2026Q00760900-I1Open ↗
08/13/2026Q00760927-I1Open ↗
▸BISENERGY CODE COMPLIANCE INSPECTIONS1
05/23/2024421133972Open ↗
▸BISPRELIMINARY COMMISSIONING REPORT CERTIFICATION1
03/01/2024421133972Open ↗
▸BISAS-BUILT ENERGY ANALYSIS (EN2)1
05/17/2024421133972Open ↗
▸Inspections & Test Reports22
▸BISTECHNICAL REPORT: RESPONSIBILITY9
05/20/2024421133972Open ↗
05/17/2024421133972Open ↗
05/17/2024421133972Open ↗
Showing 3 of 9 on file for this type
▸BISDEMOLITION (DM) JOB SIGNOFF2
12/07/2023421133972Open ↗
12/28/2022421133972Open ↗
▸BISWALL PANELS, CURTAIN WALLS, AND VENEERS2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸DOB NOWSOIL REPORT2
08/13/2026Q00716752-P1Open ↗
08/13/2026Q00716752-I1Open ↗
▸BISTR3: CONCRETE DESIGN MIX TECHNICAL REPORT1
12/28/2022421133972Open ↗
▸BISFIRE-RESISTANT PENETRATIONS AND JOINTS (FIRESTOP)1
05/23/2024421133972Open ↗
▸BISFIRE-RESISTIVE RATED CONSTRUCTION1
05/23/2024421133972Open ↗
▸BISSOIL REPORT1
06/24/2021421133972Open ↗
▸BISTECHNICAL REPORT: SOIL INSPECTION1
06/24/2021421133972Open ↗
▸DOB NOWTR4 Test Report and Plot Diagram1
08/13/2026Q00716752-I1Open ↗
▸DOB NOWTR4 Plot Diagram1
08/13/2026Q00716752-I1Open ↗
▸Approvals, Objections & Sign-offs15
▸BISSCHEDULE A - OCCUPANCY / USE8
01/31/2024421133972Open ↗
01/25/2024421133972Open ↗
01/24/2024421133972Open ↗
Showing 3 of 8 on file for this type
▸BISLETTERS - SUPPORTING DOCUMENTATION5
08/27/2025421133972Open ↗
05/09/2024440677947Open ↗
02/07/2024440677947Open ↗
Showing 3 of 5 on file for this type
▸BISDOT APPROVAL FOR APEX CORNER PEDRAMP1
08/05/2025440677947Open ↗
▸BISCURB CUT (CC) SIGNOFF1
06/27/2024440677947Open ↗
▸Cost, Insurance & Ownership3
▸BISPROJECT SPECIFIC GENERAL LIABILITY INSURANCE2
03/06/2023421133972Open ↗
03/02/2023421133972Open ↗
▸BISPROJECT-SPECIFIC GL INSURANCE1
12/28/2022421133972Open ↗
▸Filing & Intake Forms15
▸BISADDITIONAL INFORMATION12
02/22/2024421133972Open ↗
02/22/2024421133972Open ↗
02/22/2024421133972Open ↗
Showing 3 of 12 on file for this type
▸BISEFILING COVER SHEET2
04/28/2021421133972Open ↗
04/28/2021421133972Open ↗
▸BISEFILING JOB APPLICATION COVER SHEET1
06/11/2021440677947Open ↗
▸Other Documents15
▸BISALTERNATIVE MATERIALS - OTCR BUILDINGS BULLETIN2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISEXTERIOR INSULATION AND FINISH SYSTEMS (EIFS) (2014)2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISVESTIBULES2
05/23/2024421133972Open ↗
05/23/2024421133972Open ↗
▸BISBPP - SUPPORTING DOCUMENTATION2
05/09/2024440677947Open ↗
05/09/2024440677947Open ↗
▸DOB NOWAdjoining Owners Notification2
08/13/2026Q00716752-I1Open ↗
08/13/2026Q00719173-I1Open ↗
▸DOB NOWPro Cert Restriction Exception (LL158/17)2
08/13/2026Q00857401-I1Open ↗
08/13/2026Q00837996-I1Open ↗
▸BISSUSTAINABLE ROOF ZONE FORM1
06/24/2021421133972Open ↗
▸BISPLOT DIAGRAM1
06/24/2021421133972Open ↗
▸BISCONSTRUCTION - SUPPORTING DOCUMENTATION1
08/27/2025421133972Open ↗