← Back
BuildNYC
Elevator apt, semi-fireproof without stores
88-36 ELMHURST AVENUE
QUEENS · Elmhurst · BIN 4038854
💬 Discuss this project
1940Year Built
6Stories
D1Building Class
R7BZoning
55,526 sfGross Floor Area
60Units
LL97 CoveredRent Stabilized29 Active Violations 1 old, status unconfirmed ▸
Elevator apt, semi-fireproof without stores · Owner of record: 88-36 Elmhurst Avenue · 11,598 sf lot · 4.79 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbing
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Floor 6Unit 6C3p · 1 filing · 7 docs
Floor 5
Floor 4
Floor 3
Floor 2
Floor 1
Cellar88-36 Elmhurst Avenue, LLC3p · 2 filings · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
88-36 Elmhurst Avenue1907/08/2026
Bronstein Properties703/21/2026
Rebecca Realty203/21/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
12/05/2013$9.8M—QPI-XX LLC → 88-36 ELMHURST AVENUE, LLC$176/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WRG Engineering108/31/2021
Gregory V. Perotto, P.E.208/05/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Perotto Group403/21/2026
NYC Department of Design and Construction203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
JW Development HoldingsGeneral Contractor307/08/2026
Costrotta Construction ManagementGeneral Contractor103/21/2026
Davrial EnterprisesGeneral Contractor103/21/2026
Squan Construction ServicesGeneral Contractor103/21/2026
Henry Myers P HPlumbing103/21/2026
Joseph Ferrigno P HPlumbing103/21/2026
Kings Plaza P & HPlumbing107/08/2026
King's Plaza Plumbing & Heating IPlumbing107/08/2026
Alan E. RosenbergPlumbing106/07/1996
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WRG Engineering4403108/31/2021
Gregory V. Perotto, P.E.947208/05/2021
Building Lifecycle
09/17/2026
Elevator Category 1 inspection report filed
06/11/2026
§ 27-2013 ADM CODE PAINT WITH LIGHT COLORED PAINT TO THE SATISFACTION OF THIS DEPARTMENT ALL DOORS AND DOOR TRIMS AND WINDOWFRAMES IN THE ENTIRE…
HPD violation · closed
06/11/2026
§ 27-2005 ADM CODE PAINT METAL IN ACCORDANCE WITH DEPT. REGULATION ALL RADIATORS AND RISERS IN THE ENTIRE APARTMENT LOCATED AT APT 2E, 2nd STORY,…
HPD violation · closed
06/11/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE LIGHT FIXTURE AT CEILING IN THE BATHROOM LOCATED AT APT 2E, 2nd STORY, 2nd…
HPD violation · closed
06/11/2026
§ 27-2005 HMC: PROPERLY REPAIR OR REPLACE THE BROKEN OR DEFECTIVE COUNTERTOP AND WOOD BASE CABINET AT SINK IN THE KITCHEN LOCATED AT APT 2E, 2nd…
HPD violation · closed
248 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWPlumbingSigned-offKing's Plaza Plumbing & Heating I03/15/2022
DOB NOWBoiler EquipmentSigned-offS.J. Fuel11/15/2021
DOB NOWGeneral ConstructionPermit IssuedJW Development Holdings10/29/2021
DOB NOWBoiler EquipmentSigned-offS.J. Fuel08/16/2021
DOB NOWPlumbingSigned-offKings Plaza P & H08/16/2021
BISPLISSUEDHenry Myers P & H11/09/2018
BISOTISSUEDJW Development Holdings06/25/2018
BISOTISSUEDJW Development Holdings06/07/2017
BISOTISSUEDDavrial Enterprises03/20/2017
BISPLISSUEDHenry Myers P & H09/15/2016
BISOTISSUEDJW Development Holdings06/14/2016
BISOTISSUEDJW Development Holdings03/29/2016
BISOTISSUEDJW Development Holdings06/03/2015
BISPLISSUEDHenry Myers P & H03/19/2015
BISOTISSUEDJW Development Holdings03/19/2015
BISOTISSUEDSquan Construction Services02/12/2013
BISPLISSUEDJoseph Ferrigno P&H04/03/2012
BISBLISSUEDApproved Oil Co of Brooklyn04/03/2012
BISOTISSUEDCostrotta Construction Management03/11/2005
BISPLISSUEDAlan E. Rosenberg06/07/1996
2 projects · most recent 04/29/2026
Boiler Controls
FiledStatusContractorScope
04/29/2026CompleteAxcel Electric—
08/03/2021CompleteBrandl ElectricBoiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
05/31/2022Certified Water and Sanitary-WS-Fixtures-FinishCertifiedView ↗
05/26/2022Pass-Final Boiler Equipment InspectionPassView ↗
05/24/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
▾Special Inspection Requirements (DOB NOW) — 16
DateRequirementInspectorRole
08/04/2021HVAC-R and service water piping design and insulationGregory Perottoenergy_progress
08/04/2021Maintenance informationGregory Perottoenergy_progress
08/04/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
08/04/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
08/04/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
08/04/2021Energy Code Compliance InspectionsGregory Perottoprogress
08/03/2021Maintenance informationGregory Perottoenergy_progress
08/03/2021Heating SystemsGregory Perottospecial
08/03/2021Fire-Resistant Penetrations and JointsGregory Perottospecial
08/03/2021Lowest Floor ElevationGregory Perottoprogress
08/03/2021HVAC-R and service water heating equipmentGregory Perottoenergy_progress
08/03/2021HVAC-R and service water heating system controlsGregory Perottoenergy_progress
07/28/2021Fire-Resistant Penetrations and JointsWinston Garciaspecial
07/28/2021Insulation placement and R valuesWinston Garciaenergy_progress
07/28/2021Energy Code Compliance InspectionsWinston Garciaprogress
07/28/2021FinalWinston Garciaprogress
108 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account