Two stories - detached, small or mid-size
88-46 WINCHESTER BOULEVARD
QUEENS · Bellerose · BIN 4166412
💬 Discuss this project
1930Year Built
2.5Stories
A1Building Class
R3AZoning
1,514 sfGross Floor Area
1Units
Two stories - detached, small or mid-size · 2,988 sf lot · 0.51 FAR built · Flood zone X
Locations of Work
Electrical
Roof1 filing · 7 docs
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR106/21/2024
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281106/21/2024
Building Lifecycle
All (7)Filed (1)Permit Issued (1)Special Inspection (5)
06/26/2024
Permit issued — Solar
Q01061846-I1-SL
06/21/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 12 Panels, 4.92 kW
Q01061846-I1
06/05/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
06/05/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
06/05/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
06/05/2024
Special inspection requirement — Final
Mina Makar
06/05/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedMOMENTUM SOLAR06/26/2024
1 project · most recent 06/05/2024
FiledStatusContractorScope
06/05/2024Permit IssuedISLAND ELECTRIC CORP—
1 project · most recent 06/21/2024
FiledStatusContractorScope
06/21/2024Permit IssuedMOMENTUM SOLAR12 panels, 4.92 kw, 212 roof_area_sqft
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/05/2024Fire-Resistant Penetrations and JointsMina Makarspecial
06/05/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
06/05/2024Energy Code Compliance InspectionsMina Makarprogress
06/05/2024FinalMina Makarprogress
06/05/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/22/2026Q01061846-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/25/2026Q01061846-I1Open ↗
08/25/2026Q01061846-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/22/2026Q01061846-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/25/2026Q01061846-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/22/2026Q01061846-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026Q01061846-I1Open ↗