DOB12/13/2025Failure to maintain building in code compliant manner . At time of ins pection observed extensive fire damage with charred beans and walls th roughout structure. Remedy: submit an engineers report evaluating the cited conditions to ertinspections@buildings.NYC.gov within 7 days wit h photos and time frame 178-286-3460
DOB12/13/2025Structure rendered non compliant at time of inspection damage observed to have been sustained to entire house with charred beans /smoke and water and smoke and water damage due to fire at 88-59 241ST street the structure must be maintained in code compliant manner
Two stories - detached, small or mid-size · 3,000 sf lot · 0.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or filed-document coverage on file for this building.