← Back
STATEN ISLAND
88 GAR FILLMORE AVENUE
💬 Discuss this project
—Year Built
—Stories
—Building Class
—Zoning
—Gross Floor Area
—Units
Flood zone X
Locations of Work
ArchitectureStructuralCivil
Roof2p · 1 filing · 20 docs
Floor 11 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
RSTA HOLDINGS, LLC1503/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
THINK DESIGN ARCHITECTURE306/09/2023
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
WAHLER PLACE,LLCGeneral Contractor1203/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A TECH ENGINEERING NYC, P6738306/09/2023
Building Lifecycle
All (22)Filed (3)Permit Issued (4)Signed Off (1)Inspection (3)Objection (2)Special Inspection (9)
06/29/2023
Signed off — New Building
APPLICATION IS FILED FOR A NEW ONE CAR DEATCHED GARAGE ACCESSORY TO TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH NEW BUILDING (HOUSE) JOB#S00589943, CURB CUT (JOB #S00554462-I1), TEMPORARY CONSTRUCTION FENCE (JOB #S00569286).
S00554856-I1
06/28/2023
Objection raised — Scope
06/28/2023
Objection resolved — Addressed
06/09/2023
Filed — New Building
APPLICATION IS FILED FOR A NEW ONE CAR DEATCHED GARAGE ACCESSORY TO TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH NEW BUILDING (HOUSE) JOB#S00589943, CURB CUT (JOB #S00554462-I1), TEMPORARY CONSTRUCTION FENCE (JOB #S00569286).
S00554856-P4
06/09/2023
Special inspection requirement — Concrete - Cast-In-Place
anthony santoro
06/09/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
06/09/2023
Special inspection requirement — Subgrade Inspections
anthony santoro
06/09/2023
Special inspection requirement — Subsurface Investigations (Borings/Test Pits)
anthony santoro
06/09/2023
Special inspection requirement — Final
anthony santoro
06/09/2023
Special inspection requirement — Fire-Resistance Rated Construction
anthony santoro
06/09/2023
Special inspection requirement — Footing and Foundation
anthony santoro
06/09/2023
Special inspection requirement — Preliminary
anthony santoro
06/09/2023
Special inspection requirement — Structural Wood Frame
anthony santoro
03/29/2023
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
03/14/2023
Filed — New Building
APPLICATION IS FILED FOR A NEW ONE CAR DEATCHED GARAGE ACCESSORY TO TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH NEW BUILDING (HOUSE) JOB#S00589943, CURB CUT (JOB #S00554462-I1), TEMPORARY CONSTRUCTION FENCE (JOB #S00569286).
S00554856-P3
04/15/2022
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
04/06/2022
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2022
Permit issued — Earth Work
S00554856-I1-FO
03/28/2022
Permit issued — Foundation
S00554856-I1-EA
03/28/2022
Permit issued — Foundation
S00554856-I1-ST
03/17/2022
Permit issued — Structural
S00554856-I1-GC
01/13/2022
Filed — New Building
APPLICATION IS FILED FOR A NEW ONE CAR DEATCHED GARAGE ACCESSORY TO TWO FAMILY RESIDENCE. FILED IN CONJUNCTION WITH NEW BUILDING (HOUSE) JOB#S00589943, CURB CUT (JOB #S00554462-I1), TEMPORARY CONSTRUCTION FENCE (JOB #S00569286).
S00554856-I1
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWEarth WorkSigned-offWAHLER PLACE,LLC03/28/2022
DOB NOWFoundationSigned-offWAHLER PLACE,LLC03/28/2022
DOB NOWFoundationSigned-offWAHLER PLACE,LLC03/28/2022
DOB NOWStructuralPermit IssuedWAHLER PLACE,LLC03/17/2022
1 project · most recent 06/09/2023
Wood
FiledStatusContractorScope
06/09/2023Signed-offWAHLER PLACE,LLCWood
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
03/29/2023Pass-Final CND-Occupancy InspectionPassView ↗
04/15/2022Pass-Final PL - Up to 3 Requested FloorsPassView ↗
04/06/2022Certified Gas-Gas-Piping-RoughingCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 9
DateRequirementInspectorRole
06/09/2023Concrete - Cast-In-Placeanthony santorospecial
06/09/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
06/09/2023Subgrade Inspectionsanthony santorospecial
06/09/2023Subsurface Investigations (Borings/Test Pits)anthony santorospecial
06/09/2023Finalanthony santoroprogress
06/09/2023Fire-Resistance Rated Constructionanthony santoroprogress
06/09/2023Footing and Foundationanthony santoroprogress
06/09/2023Preliminaryanthony santoroprogress
06/09/2023Structural Wood Frameanthony santoroprogress
▾Documents — 24 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026S00554856-I1Request digital key ↗
08/23/2026S00554856-P3Request digital key ↗
08/23/2026S00554856-P2Request digital key ↗
Showing 3 of 5 on file for this type
▸Seals & Professional Certifications14
▸DOB NOWSpecial Inspector Seal & Signature6
09/01/2026S00554856-P1Open ↗
09/01/2026S00554856-P1Open ↗
08/26/2026S00554856-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026S00554856-P2Open ↗
08/23/2026S00554856-P1Open ↗
08/23/2026S00554856-I1Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWProgress Inspector Seal & Signature3
09/01/2026S00554856-P1Open ↗
08/26/2026S00554856-P2Open ↗
08/24/2026S00554856-P4Open ↗
▸Inspections & Test Reports5
▸DOB NOWSOIL REPORT5
08/13/2026S00554856-P4Open ↗
08/13/2026S00554856-P3Open ↗
08/13/2026S00554856-I1Open ↗
Showing 3 of 5 on file for this type