← Back
BuildNYC
One family attached or semi-detached
88 THORNYCROFT AVENUE
STATEN ISLAND · BIN 5068592
💬 Discuss this project
1980Year Built
2Stories
A5Building Class
R3-1Zoning
1,292 sfGross Floor Area
1Units
2 Active Violations 1 unresolved · 1 paperwork only ▸
One family attached or semi-detached · 2,210 sf lot · 0.58 FAR built · Flood zone X
Locations of Work
Electrical
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Permit Issued — active, not yet Signed-off
RoofProposed photovoltaic power system installationUnder Construction1 filing
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Green River Environmental Engineering110/14/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
NYSSGeneral Contractor110/26/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
Green River Environmental7841110/14/2026
Building Lifecycle
10/22/2026
Permit issued — Solar
S01473094-I1-SL
10/14/2026
Filed — Alteration
INSTALLATION OF PHOTOVOLTAIC SOLAR ARRAY ON EXISTING ROOF SYSTEM AS PER PLANS.
S01473094-I1
10/12/2026
Special inspection requirement — Fire-Resistant Penetrations and Joints
ROBERT MASONE
10/12/2026
Special inspection requirement — Structural Stability – Alterations of existing buildings
ROBERT MASONE
10/12/2026
Special inspection requirement — Energy Code Compliance Inspections
ROBERT MASONE
10 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarPermit IssuedNYSS10/22/2026
BISPLISSUEDBrighton09/25/1995
BISOTISSUEDN/A08/24/1995
1 project · most recent 10/14/2026
FiledStatusContractorScope
10/14/2026Permit IssuedNY Solar Electrical—
1 project · most recent 10/14/2026
FiledStatusContractorScope
10/14/2026Permit IssuedNYSS—
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
10/12/2026Fire-Resistant Penetrations and JointsROBERT MASONEspecial
10/12/2026Structural Stability – Alterations of existing buildingsROBERT MASONEspecial
10/12/2026Energy Code Compliance InspectionsROBERT MASONEprogress
10/12/2026FinalROBERT MASONEprogress
10/12/2026Air barrier - visual inspectionROBERT MASONEenergy_progress
6 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account