← Back
Over six families without stores
880 47 STREET
BROOKLYN · Sunset Park (East)-Borough Park (West) · BIN 3012487
💬 Discuss this project
1928Year Built
4Stories
C1Building Class
R6Zoning
30,920 sfGross Floor Area
40Units
LL97 CoveredRent Stabilized6 Open Violations ▸FDNY Report ↗
Over six families without stores · Owner of record: AB RAAB LLC · 10,017 sf lot · 3.09 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
J G CONSTRUCTION SRVCS507/08/2026
A AND R REALTY LLC903/22/2026
AB RAAB LLC103/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
AG ENGINEERING PLLC107/25/2023
RONALD KRIGSMAN P.E.P.C.205/10/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARSENAL BUILDING CONSULTANTS LLC203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
RICHARD NEUElectrical103/22/2026
J & G CONSTRUCTION SVCSGeneral Contractor107/08/2026
A. HTG AND PLBG WORKS INCPlumbing107/08/2026
Building Lifecycle
All (72)Filed (3)Permit Issued (3)Signed Off (3)Violation (60)Inspection (3)
03/24/2026
Violation issued (HPD, closed)
B
03/24/2026
Violation issued (HPD, open)
A
03/24/2026
Violation issued (HPD, closed)
B
03/24/2026
Violation issued (HPD, closed)
A
03/24/2026
Violation issued (HPD, closed)
B
03/20/2026
Violation issued (HPD, open)
A
03/20/2026
Violation issued (HPD, closed)
B
03/20/2026
Violation issued (HPD, open)
A
01/07/2026
Violation issued (HPD, closed)
C
01/07/2026
Violation issued (HPD, closed)
A
12/08/2025
Violation issued (HPD, closed)
A
12/08/2025
Violation issued (HPD, closed)
B
12/08/2025
Violation issued (HPD, closed)
B
12/08/2025
Violation issued (HPD, closed)
A
12/08/2025
Violation issued (HPD, closed)
C
12/08/2025
Violation issued (HPD, closed)
C
12/08/2025
Violation issued (HPD, closed)
B
12/01/2024
Violation issued (HPD, closed)
B
12/01/2024
Violation issued (HPD, closed)
C
12/01/2024
Violation issued (HPD, closed)
C
12/01/2024
Violation issued (HPD, closed)
B
12/01/2024
Violation issued (HPD, closed)
C
11/26/2024
Violation issued (HPD, closed)
C
11/26/2024
Violation issued (HPD, closed)
C
11/26/2024
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, closed)
B
11/26/2024
Violation issued (HPD, closed)
C
06/26/2024
Signed off — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
B00907732-I1
01/09/2024
Violation issued (HPD, open)
B
01/09/2024
Violation issued (HPD, open)
B
01/09/2024
Violation issued (HPD, open)
B
01/06/2024
Violation issued (HPD, closed)
C
12/27/2023
Violation issued (HPD, closed)
C
10/22/2023
Violation issued (HPD, closed)
B
10/22/2023
Violation issued (HPD, closed)
C
10/22/2023
Violation issued (HPD, closed)
A
10/22/2023
Violation issued (HPD, closed)
C
09/08/2023
Violation issued (HPD, closed)
B
09/08/2023
Violation issued (HPD, closed)
C
07/26/2023
Permit issued — Sidewalk Shed
B00907732-I1-SH
07/25/2023
Filed — Alteration
installation of heavy duty sidewalk shed. no change in use, occupancy or egress. work shall comply with chapter 33 of nycc.
B00907732-I1
01/30/2023
Violation issued (HPD, closed)
C
01/30/2023
Violation issued (HPD, closed)
B
12/22/2022
Violation issued (HPD, closed)
C
12/22/2022
Violation issued (HPD, closed)
C
12/22/2022
Violation issued (HPD, closed)
B
12/22/2022
Violation issued (HPD, closed)
B
11/28/2022
Violation issued (HPD, closed)
B
02/11/2022
Violation issued (HPD, closed)
A
02/11/2022
Violation issued (HPD, closed)
B
02/11/2022
Violation issued (HPD, closed)
A
02/11/2022
Violation issued (HPD, closed)
B
02/11/2022
Violation issued (HPD, closed)
B
01/12/2022
Violation issued (HPD, closed)
B
01/05/2022
Violation issued (HPD, closed)
B
01/05/2022
Violation issued (HPD, closed)
A
01/05/2022
Violation issued (HPD, closed)
B
12/18/2021
Violation issued (HPD, closed)
C
12/17/2021
Signed off — Alteration
B00518865-I1
12/14/2021
Inspection — Pass-Final PL - Up to 3 Requested Floors
Pass
View inspection ↗
Latest 60 of 72 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offJ & G CONSTRUCTION SVCS07/26/2023
DOB NOWBoiler EquipmentSigned-offENVIRONMENTAL PRO MECH05/13/2021
DOB NOWPlumbingSigned-offD.H. EAGLE PLUMBING, LLC05/13/2021
BISFSISSUEDSTAR INDUSTRIAL SERVICE CO.,INC.05/08/1992
BISPLISSUEDJOSEPH FERRIGN PLUMB & HEATING05/08/1992
2 projects · most recent 07/21/2023
Boiler Controls
FiledStatusContractorScope
07/21/2023Permit IssuedRICHARD NEU—
05/25/2021CompleteWIRE UP ELEC'L CONT'G CORBoiler Controls
▾Field Inspections (DOB CAP) — 3
DateTypeResultReport
12/14/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
12/07/2021Pass-Final PL - Up to 3 Requested FloorsPassView ↗
11/30/2021Pass-Final Boiler Equipment InspectionPassView ↗
▾Documents — 10 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch3
09/01/2026B00518855-I1Request digital key ↗
09/01/2026B00518865-I1Request digital key ↗
08/27/2026B00907732-I1Request digital key ↗
▸Seals & Professional Certifications3
▸DOB NOWDPL-1: Design Professional Seal & Signature3
09/01/2026B00518855-I1Open ↗
09/01/2026B00518865-I1Open ↗
08/13/2026B00907732-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
09/01/2026B00518855-I1Open ↗
09/01/2026B00518865-I1Open ↗
▸Energy Compliance2
▸DOB NOWEN2: As Built Energy Analysis.1
08/13/2026B00518855-I1Open ↗
▸DOB NOWPreliminary Commissioning Report Certification1
08/13/2026B00518855-I1Open ↗