1963Year Built
6Stories
D4Building Class
R5BZoning
52,560 sfGross Floor Area
69Units
LL97 CoveredRent Stabilized20 Open Violations 19 unresolved · 1 paperwork only ▸FISP: SAFEFDNY Report ↗
Elevator cooperative · Owner of record: 880/877 OWNERS CORP · 15,000 sf lot · 3.5 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
JASCO603/22/2026
G.K. DEAN CONTRACTING503/22/2026
880/877 OWNERS CORP703/22/2026
877/880 OWNERS CORP103/22/2026
880-877 CO-OP CORP103/22/2026
J&G GENERAL CONTRACTING103/21/2026
J G GNRL CONTRACT403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
SYED ENGINEERING, P.C.203/18/2021
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ADVANCED BUILDERS SERVICES203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
G.K. DEAN CONTRACTINGGeneral Contractor303/21/2026
JASCO, INCGeneral Contractor303/21/2026
MICHAEL BAPTISTEElectrical103/21/2026
Building Lifecycle
All (79)Filed (2)Permit Issued (2)Signed Off (2)Facade (FISP) (12)Violation (60)Special Inspection (1)
02/19/2026
Violation issued (HPD, open)
C
02/19/2026
Violation issued (HPD, open)
C
02/19/2026
Violation issued (HPD, closed)
C
12/13/2025
Violation issued (HPD, closed)
B
12/13/2025
Violation issued (HPD, closed)
B
12/13/2025
Violation issued (HPD, open)
C
12/13/2025
Violation issued (HPD, open)
B
12/13/2025
Violation issued (HPD, open)
C
11/15/2025
Violation issued (HPD, open)
B
12/10/2024
Violation issued (ECB, open)
Construction
06/23/2024
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
07/14/2023
Violation issued (HPD, closed)
B
07/14/2023
Violation issued (HPD, open)
B
07/14/2023
Violation issued (HPD, closed)
A
07/14/2023
Violation issued (HPD, open)
C
07/14/2023
Violation issued (HPD, closed)
B
07/14/2023
Violation issued (HPD, closed)
A
07/14/2023
Violation issued (HPD, closed)
B
07/14/2023
Violation issued (HPD, open)
C
04/22/2023
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
03/03/2023
Violation issued (HPD, closed)
C
03/03/2023
Violation issued (HPD, closed)
B
03/03/2023
Violation issued (HPD, closed)
B
03/03/2023
Violation issued (HPD, closed)
C
03/03/2023
Violation issued (HPD, closed)
C
03/03/2023
Violation issued (HPD, closed)
A
02/07/2023
Violation issued (HPD, closed)
C
11/05/2022
Violation issued (HPD, closed)
B
11/05/2022
Violation issued (HPD, closed)
C
11/05/2022
Violation issued (HPD, closed)
C
11/05/2022
Violation issued (HPD, closed)
B
11/05/2022
Violation issued (HPD, closed)
A
11/05/2022
Violation issued (HPD, closed)
C
11/05/2022
Violation issued (HPD, closed)
B
10/27/2022
Cycle 9 facade report submitted
10/27/2022
Cycle 9 facade report signed — SAFE
09/19/2022
Cycle 9 facade inspection completed
10/06/2021
Signed off — Alteration
B00481682-I1
07/23/2021
Signed off — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
B00475378-I1
07/22/2021
Violation issued (ECB, closed)
Construction
05/12/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/05/2021
Violation issued (HPD, closed)
B
05/05/2021
Violation issued (HPD, closed)
B
05/05/2021
Violation issued (HPD, closed)
A
05/05/2021
Violation issued (HPD, closed)
B
04/29/2021
Violation issued (DOB, open)
V-DOB VIOLATION - ACTIVE
04/16/2021
Permit issued — General Construction
B00481682-I1-GC
03/18/2021
Filed — Alteration
B00481682-I1
03/04/2021
Permit issued — Sidewalk Shed
B00475378-I1-SH
03/02/2021
Filed — Alteration
PROPOSED INSTALLATION OF HEAVY DUTY SIDEWALK SHED FOR REMEDIAL REPAIRS AS PER PLANS. NO CHANGE IN USE OCCUPANCY OR EGRESS UNDER THIS APPLICATION. LIVE LOAD 300 PER SQUARE FEET. SIDEWALK SHED SHALL COMPLY WITH CHAPTER # 33 OF THE 2014 CODE.
B00475378-I1
03/02/2021
Violation issued (HPD, closed)
B
02/24/2021
Special inspection requirement — Final
RAFI HAMID
02/09/2021
Violation issued (ECB, closed)
Construction
10/01/2020
Violation issued (HPD, closed)
B
10/01/2020
Violation issued (HPD, closed)
A
09/27/2020
Violation issued (HPD, closed)
C
08/31/2020
Violation issued (HPD, closed)
B
08/31/2020
Violation issued (HPD, closed)
C
08/31/2020
Violation issued (HPD, closed)
C
08/31/2020
Violation issued (HPD, closed)
B
Latest 60 of 79 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionSigned-offG.K. DEAN CONTRACTING04/16/2021
DOB NOWSidewalk ShedSigned-offJASCO, INC03/04/2021
BISOTISSUEDMOHAMMED HALIM07/07/2016
BISEQISSUEDJ& G GNRL CONTRACT INC03/21/2016
BISOTISSUEDMOHAMMED HALIM10/07/2015
BISEQISSUEDJ & G GNRL CONTRACT INC03/13/2015
BISFSISSUEDMANHATTAN BLR. EQUIP10/29/1999
4 projects · most recent 11/02/2021
General Wiring
FiledStatusContractorScope
11/02/2021CompleteKJK ELECTRIC INC—
06/24/2021CompleteDANICK ELEC'L CONTR'G CORGeneral Wiring
03/09/2021Permit IssuedRICHARD NEU—
02/12/2018Permit IssuedR.C.M. ELECTRIC CORP.General Wiring
▾Special Inspection Requirements (DOB NOW) — 1
DateRequirementInspectorRole
02/24/2021FinalRAFI HAMIDprogress
▾Documents — 37 on file (BIS + DOB NOW)
▸Plans & Drawings3
▸DOB NOWPlans/Sketch2
09/01/2026B00475378-I1Request digital key ↗
09/01/2026B00481682-I1Request digital key ↗
▸DOB NOWPlans/Sketch - Sidewalk Shed1
09/01/2026B00475378-I1Request digital key ↗
▸Applications & Permits6
▸BISWORK PERMIT APPLICATION4
07/08/2016340307787Open ↗
04/11/2016340238184Open ↗
09/30/2015340307787Open ↗
Showing 3 of 4 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION2
09/30/2015340307787Open ↗
03/12/2015340238184Open ↗
▸Seals & Professional Certifications12
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION3
01/25/2017340238184Open ↗
01/20/2017340238184Open ↗
12/09/2016340307787Open ↗
▸BISREQUIRED ITEMS CHECKLIST FOR PROFESSIONAL CERTIFICATION2
09/30/2015340307787Open ↗
03/12/2015340238184Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT2
09/30/2015340307787Open ↗
03/12/2015340238184Open ↗
▸BISTECHNICAL REPORT STATEMENT OF RESPONSIBILITY2
09/30/2015340307787Open ↗
03/12/2015340238184Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature2
09/01/2026B00475378-I1Open ↗
09/01/2026B00481682-I1Open ↗
▸DOB NOWProgress Inspector Seal & Signature1
08/27/2026B00475378-I1Open ↗
▸Environmental & Asbestos1
▸BISASBESTOS: COMPLETION OR CLOSEOUT (ACP20/21/5)1
09/30/2015340307787Open ↗
▸Inspections & Test Reports5
▸BISTECHNICAL REPORT: RESPONSIBILITY3
10/07/2015340307787Open ↗
09/30/2015340307787Open ↗
03/12/2015340238184Open ↗
▸BISSTRUCTURAL STABILITY - EXISTING BUILDINGS1
09/30/2015340307787Open ↗
▸BISMASONRY1
09/30/2015340307787Open ↗
▸Approvals, Objections & Sign-offs4
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
01/25/2017340238184Open ↗
01/20/2017340238184Open ↗
12/09/2016340307787Open ↗
▸BISSHED LETTER1
04/11/2016340238184Open ↗
▸Cost, Insurance & Ownership2
▸BISCOST AFFIDAVIT2
12/09/2016340307787Open ↗
09/30/2015340307787Open ↗
▸Filing & Intake Forms2
▸BISEFILING JOB APPLICATION COVER SHEET2
09/30/2015340307787Open ↗
03/12/2015340238184Open ↗
▸Other Documents2
▸BISEXTERNAL FORMS - SUPPORTING DOCUMENTATION2
01/25/2017340238184Open ↗
01/20/2017340238184Open ↗