← Back
BuildNYC
Elevator apt, semi-fireproof without stores
880 ST NICHOLAS AVENUE
MANHATTAN · BIN 1061706
💬 Discuss this project
1920Year Built
6Stories
D1Building Class
R7AZoning
43,160 sfGross Floor Area
36Units
LL97 CoveredRent Stabilized72 Active Violations 1 likely answered 3 old, status unconfirmed ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: 880 St Nicholas · 9,775 sf lot · 4.42 FAR built · Flood zone X
Locations of Work
ArchitectureStructuralElectricalMechanicalEquipmentGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofShamco Management1p · 1 filing · 12 docs
Floor 1Pipe scaffold installation2p · 1 filing · 7 docs
Site & exteriorShamco Management6p · 2 filings · 15 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
880 St Nick Ave1403/21/2026
NYC Department of Housing Preservation and Development403/21/2026
880 St Nicholas Ave103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
06/28/2016$11.1M—759 ST NICK LLC → 880 ST NICHOLAS, LLC$257/sf building
07/10/2014$7.0M—880 ST NICHOLAS AVENUE HOLDINGS LP → 759 ST NICK LLC$162/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
WRG Engineering102/25/2022
A.P. Associates101/07/2022
Green Design211/20/2019
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Atlantic Building Supply403/21/2026
Sandeep Kaur103/21/2026
WRG Engineering P C203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Apex Group NYScaffold603/21/2026
Apex Group NYGeneral Contractor507/08/2026
Norway ElectricElectrical203/21/2026
Power Surge ElectricElectrical103/22/2026
J.A. Electric Inc D/B/A MidwaElectrical103/21/2026
Kaj NY ConstructionScaffold107/08/2026
Dynamo ElectricalElectrical103/21/2026
WCK ElectricElectrical103/21/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
WRG Engineering4403102/25/2022
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 9, sub-cycle A)
The filing window opened 02/21/2025. No Cycle 9 filing on record yet
10/21/2026
Elevator Category 1 inspection report filed
06/20/2026
§ 27-2005 ADM CODE REPAIR THE BROKEN OR DEFECTIVE PLASTERED SURFACES AND PAINT IN A UNIFORM COLOR AT EAST WALL IN THE KITCHEN LOCATED AT APT 44,…
HPD violation · open
06/20/2026
§ 27-2056.6 ADM CODE - CORRECT THE LEAD-BASED PAINT HAZARD - PAINT THAT TESTED POSITIVE FOR LEAD CONTENT AND THAT IS PEELING OR ON A DETERIORATED…
HPD violation · closed
06/20/2026
§ 27-2005 ADM CODE PROPERLY REPAIR WITH SIMILAR MATERIAL THE BROKEN OR DEFECTIVE WOOD FLOOR IN THE FOYER LOCATED AT APT 44, 4th STORY, 2nd…
HPD violation · open
219 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSidewalk ShedSigned-offApex Group NY06/27/2024
DOB NOWGeneral ConstructionSigned-offApex Group NY05/21/2024
DOB NOWGeneral ConstructionSigned-offApex Group NY05/25/2023
DOB NOWSidewalk ShedSigned-offApex Group NY04/26/2023
DOB NOWGeneral ConstructionSigned-offApex Group NY06/22/2022
DOB NOWSidewalk ShedSigned-offApex Group NY02/04/2022
DOB NOWSupported ScaffoldSigned-offKaj NY Construction11/20/2019
BISEQISSUEDBilly Enterprises09/23/2016
BISPLISSUEDOrion Plumbing & Heating04/14/2015
BISOTISSUEDOvq Consolidated03/02/2015
BISPLISSUEDOrion Plumbing & Heating02/10/2015
BISMHISSUEDSuccess Contact02/05/2015
BISPLISSUEDAbsolute Plumbing & Heating & Mechanical02/02/2015
BISOTISSUEDOvq Consolidated01/09/2015
BISPLISSUEDOrion Plumbing & Heating12/05/2014
BISOTISSUEDOvq Consolidated12/01/2014
BISFBISSUEDApproved Oil Co of Brooklyn11/06/2014
BISPLISSUEDBell Fuel Oil11/06/2014
BISOTISSUEDEZ Runer Construction10/14/2014
BISPLISSUEDEZ Runer Construction10/14/2014
BISPLISSUEDMarco Polo Plumbing & Heating09/15/2014
BISOTISSUEDLand Design Studio08/20/2014
BISPLISSUEDCatalano Plumbing & Heating06/24/2014
BISPLISSUEDCatalano Plumbing & Heating06/03/2013
BISOTISSUEDGPS Painting of NY11/07/2012
BISOTISSUEDGPS Painting of NY10/19/2012
BISOTISSUEDRicky & Sons Construction08/12/2011
BISFBISSUEDS.J. Fuel Co08/01/2007
4 projects · most recent 01/12/2022
General Wiring
FiledStatusContractorScope
01/12/2022Permit IssuedBDS Electric—
07/27/2021CompleteGotham Wiring Licensed—
07/26/2021CompleteAccurate ElectricalGeneral Wiring
09/17/2019Permit IssuedPower Surge Electric—
▾Special Inspection Requirements (DOB NOW) — 8
DateRequirementInspectorRole
03/17/2022Air barrier - visual inspectionWinston Garciaenergy_progress
03/17/2022Fire-Resistant Penetrations and JointsWinston Garciaspecial
03/17/2022Fire-Resistance Rated ConstructionWinston Garciaprogress
09/10/2021Energy Code Compliance InspectionsWinston Garciaprogress
09/10/2021FinalWinston Garciaprogress
09/10/2021MasonryWinston Garciaspecial
09/10/2021Structural Stability – Alterations of existing buildingsWinston Garciaspecial
11/21/2019FinalBRIAN T. O'CONNORprogress
197 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account