← Back
BuildNYC
Primarily 4 family with 1 store or office
8812 4TH AVENUE
BROOKLYN · Bay Ridge · BIN 3154078
💬 Discuss this project
1923Year Built
3Stories
S4Building Class
C4-2AZoning
8,000 sfGross Floor Area
5Units
0 Active ViolationsFDNY Report ↗
Primarily 4 family with 1 store or office · Owner of record: 8812-8814 Fourth Ave · 4,000 sf lot · 2 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalCivilGeneral
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofArirang Restaurant8p · 1 filing · 9 docs
Floor 3Remove plumbing and gas fixtures, third floor2 filings · 6 docs
Floor 2Arirang Restaurant1p · 1 filing · 9 docs
Floor 1
CellarArirang Restaurant2p · 1 filing · 9 docs
Filed — no permit issuedCreate second dwelling unit, third floor7p · 1 filing · 4 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Arirang1403/21/2026
Hamilton Harbor Associates1303/21/2026
8812-8814 Fourth Ave1003/22/2026
Tranchina707/08/2026
West 104 St Associates103/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Scaglione Architects309/29/2025
Reynaldo C. Prego, PE205/01/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
Planhandlers203/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Maximum ContractingGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
A Tech Engineering NYC, P6738205/01/2025
Building Lifecycle
All (43)Filed (5)Permit Issued (1)Violation (11)Objection (11)Special Inspection (15)
03/06/2026
Violation issued (FDNY_ORDER, closed)
10/08/2025
Objection raised — Admin
10/08/2025
Objection raised — Scope
10/03/2025
Objection resolved — Addressed
09/29/2025
Filed — Alteration CO
APPLICATION FILED TO CREATE A SECOND DWELLING UNIT AT THE THIRD FLOOR - ONLY - NO WORK PROPOSED AT THE CELLAR ; FIRST OR SECOND FLOORS NO BUILDING ENLARGEMENT , EXCAVATION OR FOUNDATION WORK PROPOSED UNDER THIS APPLICATION
B01258535-I1
07/27/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
07/27/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/27/2025
Special inspection requirement — Energy Code Compliance Inspections
07/27/2025
Special inspection requirement — Fire-Resistance Rated Construction
07/27/2025
Special inspection requirement — Lighting in dwelling units
07/27/2025
Special inspection requirement — Permanent certificate
07/27/2025
Special inspection requirement — Metering
05/14/2025
Objection resolved — Addressed
05/05/2025
Objection raised — Scope
05/05/2025
Objection raised — Cost
05/05/2025
Objection raised — Scope
05/05/2025
Objection raised — Scope
05/05/2025
Objection raised — Scope
05/01/2025
Filed — Alteration
Install new roof-top condensing units to be located on existing steel dunnage & new air handling units to replace removed water cooled system, to be connected to existing utilities & ductwork, all in extg.eating & drinking establishment. See also comments
B00926596-P1
01/28/2025
Filed — Alteration
APPLICATION FILED TO REMOVE ALL PLUMBING AND GAS FIRED FIXTURES AT THIRD (3rd) FLOOR ONLY - NO WORK PROPOSED AT CELLAR , FLOORS 001 OR 002 UNDER THIS APPLICATION
B01158080-I1
01/27/2025
Filed — Alteration
B01158090-I1
12/23/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
07/03/2024
Permit issued — Mechanical Systems
B00926596-I1-MS
05/01/2024
Objection resolved — Addressed
12/13/2023
Objection raised — Scope
12/11/2023
Filed — Alteration
Install new roof-top condensing units to be located on existing steel dunnage & new air handling units to replace removed water cooled system, to be connected to existing utilities & ductwork, all in extg.eating & drinking establishment. See also comments
B00926596-I1
11/28/2023
Violation issued (FDNY_NOV, closed)
11/10/2023
Special inspection requirement — HVAC-R and service water heating equipment
anthony santoro
11/10/2023
Special inspection requirement — HVAC-R and service water heating system controls
anthony santoro
11/10/2023
Special inspection requirement — Maintenance information
anthony santoro
11/10/2023
Special inspection requirement — HVAC-R and service water piping design and insulation
anthony santoro
11/10/2023
Special inspection requirement — Fire-Resistant Penetrations and Joints
anthony santoro
08/29/2023
Special inspection requirement — Mechanical Systems
anthony santoro
08/29/2023
Special inspection requirement — Final
anthony santoro
04/22/2021
Violation issued (FDNY_NOV, closed)
10/14/2011
Violation issued (FDNY_NOV, closed)
02/27/2001
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/07/2000
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
03/16/1999
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
05/04/1998
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
09/16/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
02/10/1997
Violation issued (DOB, closed)
V*-DOB VIOLATION - DISMISSED
06/14/1989
Violation issued (ECB, closed)
Public Assembly
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWMechanical SystemsPermit IssuedMaximum Contracting07/03/2024
BISMHISSUEDDibenedetto Heating & Air Condit09/11/2018
BISPLISSUEDR.S.F. Plumbing & Heating09/11/2018
BISMHISSUEDEmpire State Mechanical *05/24/2017
BISOTISSUEDAtlantic Hoisting & Scaff02/22/2011
BISOTISSUEDAtlantic Hoisting & Scaff02/22/2011
BISOTISSUEDAtlantic Hoisting & Scaffol03/08/2010
BISOTISSUEDAtlantic Hoisting & Scaffol03/08/2010
BISOTISSUEDAtlantic Hoisting & Scaffol02/05/2010
BISOTISSUEDAtlantic Hoisting & Scaffol11/24/2009
BISFPISSUEDAllied Fire Control Service02/11/2008
BISPLISSUEDMr. Plumber03/07/2006
BISPLISSUEDK.M.D. Mechanical 144305/20/2003
BISMHISSUEDPeter Steven Quanci & Associates10/31/2002
BISPLISSUEDK.M.D. Mechanical 144302/01/2002
BISPLISSUEDK.M.D. Mechanical 144302/01/2002
BISSPISSUEDK.M.D. Mechanical 144301/28/2002
BISMHISSUED5 Boro Mechanical04/07/2000
BISPLISSUEDSteven Thomas Heating04/09/1999
BISOTISSUEDIntrepid Electrical Contrating03/24/1999
BISPLISSUEDSteven Thomas Heating03/24/1999
BISPLISSUEDSteven Thomas Heating03/19/1999
BIS—ISSUEDIntrepid Electric Contracting Co02/10/1999
BISFPISSUEDReliable Fire Protection01/21/1999
BISPLISSUEDPilato Brothers Plumbing & Heating Co02/21/1995
BISPLISSUEDPilato Brothers Plumbing & Heating Co01/23/1995
BISPLISSUEDPilato Brothers Plumbing & Heating Co01/23/1995
BISFPISSUEDReliable Fire Protection04/12/1993
BISSPISSUEDPilato Brothers & P&H Co03/16/1993
BISSPISSUEDPilato Brothers PLG03/16/1993
BISPLISSUEDPilato Brothers Plumbing & Heating Co02/17/1993
BISPLISSUEDPilato Brothers Plumbing & Heating Co02/11/1993
BISMHISSUEDIntrepid Electrical Contracting02/04/1993
BISOTISSUEDIntrepid Electrical Contracting02/02/1993
BISEQISSUEDIntrepid Electrical Contracting01/29/1993
BIS—ISSUEDIntrepid Electrical Contracting01/27/1993
BIS—ISSUEDIntrepid Electrical Contracting01/27/1993
BISMHISSUEDIntrepid Electrical Contracting10/26/1992
BISEQISSUEDIntrepid Electrical Contracting10/26/1992
1 project · most recent 05/01/2025
Air Conditioning Systems
FiledStatusContractorScopeMake / Model / Capacity
05/01/2025Permit IssuedMaximum ContractingAir Conditioning Systems
Cooling
Comfort Aire Five (5) Comfort-Aire Condensing Units, Model #s HMG60F1P 60,000 BTU · Condensing Unit ×5
1 project · most recent 01/28/2025
Gas Water/Sanitary
FiledStatusContractorScope
01/28/2025——Gas, Water/Sanitary
▾Special Inspection Requirements (DOB NOW) — 15
DateRequirementInspectorRole
07/27/2025Fire-Resistant Penetrations and Joints—special
07/27/2025Structural Stability – Alterations of existing buildings—special
07/27/2025Energy Code Compliance Inspections—progress
07/27/2025Fire-Resistance Rated Construction—progress
07/27/2025Lighting in dwelling units—energy_progress
07/27/2025Permanent certificate—energy_progress
07/27/2025Metering—energy_progress
12/23/2024Structural Stability – Alterations of existing buildings—special
11/10/2023HVAC-R and service water heating equipmentanthony santoroenergy_progress
11/10/2023HVAC-R and service water heating system controlsanthony santoroenergy_progress
11/10/2023Maintenance informationanthony santoroenergy_progress
11/10/2023HVAC-R and service water piping design and insulationanthony santoroenergy_progress
11/10/2023Fire-Resistant Penetrations and Jointsanthony santorospecial
08/29/2023Mechanical Systemsanthony santorospecial
08/29/2023Finalanthony santoroprogress
▾Tenants in the building
TenantSpaceFloorsRenovation projects
Arirang RestaurantRestaurant / Food ServiceRoof
Project B00926596 Alteration · Permit Entire · 12/11/2023
Names are taken automatically from the text of each project’s filed documents (title blocks and cover sheets) and screened to exclude owners, landlords and designers. They may be incomplete or wrong; check the filing.
▾Documents — 91 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01158090-I1Request digital key ↗
08/23/2026B01158080-I1Request digital key ↗
08/21/2026B00926596-P1Request digital key ↗
Showing 3 of 5 on file for this type
▸Applications & Permits18
▸BISWORK PERMIT APPLICATION9
09/12/2018321572142Open ↗
05/30/2017321572142Open ↗
02/24/2011320125100Open ↗
Showing 3 of 9 on file for this type
▸BISPLAN / WORK APPROVAL APPLICATION6
01/29/2019321572142Open ↗
05/10/2018321572142Open ↗
05/11/2017321572142Open ↗
Showing 3 of 6 on file for this type
▸BISPLACE OF ASSEMBLY2
09/27/2017302054844Open ↗
09/25/2017302054844Open ↗
▸BISPLAN - WORK & PERMITS - SUPPPORTING DOCUMENTATION1
01/24/2019321572142Open ↗
▸Zoning, Tax Lot & Property Records1
▸DOB NOWZoning Exhibit form (1-5)1
08/13/2026B01258535-I1Open ↗
▸Seals & Professional Certifications21
▸BISTECHNICAL REPORT: RESPONSIBILITY/CERTIFICATION7
10/10/2019321572142Open ↗
09/28/2019321572142Open ↗
09/13/2019321572142Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/21/2026B00926596-I1Open ↗
08/13/2026B01258535-I1Open ↗
08/13/2026B00926596-P1Open ↗
Showing 3 of 5 on file for this type
▸BISPROFESSIONAL CERTIFIED CHECKLIST3
05/11/2017321572142Open ↗
02/08/2010320125100Open ↗
11/24/2009320095099Open ↗
▸BISPROFESSIONAL CERTIFICATION STATEMENT FORM2
02/08/2010320125100Open ↗
11/24/2009320095099Open ↗
▸DOB NOWProgress Inspector Seal & Signature2
09/02/2026B00926596-I1Open ↗
09/02/2026B00926596-I1Open ↗
▸BISProfessional and Owner Certification (POC3)1
05/11/2017321572142Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
09/02/2026B00926596-I1Open ↗
▸Trade Schedules & Equipment13
▸BISEQUIPMENT USE PERMITS9
10/30/2019321572142Open ↗
10/30/2019321572142Open ↗
10/30/2019321572142Open ↗
Showing 3 of 9 on file for this type
▸BISSCHEDULE B - PLUMBING/SPRINKLER/STANDPIPE2
05/10/2018321572142Open ↗
05/11/2017321572142Open ↗
▸BISEQUIPMENT USE APPLICATION/PERMIT1
10/30/2019321572142Open ↗
▸BISSCHEDULE B - PLUMBING1
01/30/2008310082102Open ↗
▸Environmental & Asbestos8
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/15/2026B00926596-I1Open ↗
08/13/2026B00926596-P1Open ↗
08/13/2026B01158090-I1Open ↗
Showing 3 of 5 on file for this type
▸BISASBESTOS EXEMPTION CERTIFICATION LETTER2
02/08/2010320125100Open ↗
11/24/2009320095099Open ↗
▸BISTHIS IS 'NOT AN ASBESTOS PROJECT'1
01/30/2008310082102Open ↗
▸Energy Compliance5
▸BISTECHNICAL REPORT: ENERGY CODE PROGRESS INSPS4
10/10/2019321572142Open ↗
09/28/2019321572142Open ↗
09/13/2019321572142Open ↗
Showing 3 of 4 on file for this type
▸BISAS-BUILT ENERGY ANALYSIS1
10/12/2019321572142Open ↗
▸Approvals, Objections & Sign-offs8
▸BISCERTIFICATE OF OCCUPANCY/LOC: REQUEST3
10/12/2019321572142Open ↗
09/28/2019321572142Open ↗
09/13/2019321572142Open ↗
▸BISADMINISTRATIVE OBJECTIONS3
02/08/2010320125100Open ↗
11/24/2009320095099Open ↗
01/30/2008310082102Open ↗
▸BISLETTERS - SUPPORTING DOCUMENTATION2
09/12/2018321572142Open ↗
09/12/2018321572142Open ↗
▸Cost, Insurance & Ownership6
▸BISCOST AFFIDAVIT6
09/13/2019321572142Open ↗
05/10/2018321572142Open ↗
05/11/2017321572142Open ↗
Showing 3 of 6 on file for this type
▸Filing & Intake Forms6
▸BISEFILING COVER SHEET3
05/11/2017321572142Open ↗
02/08/2010320125100Open ↗
11/24/2009320095099Open ↗
▸BISBOROUGH INTAKE FORM3
10/12/2019321572142Open ↗
10/10/2019321572142Open ↗
09/28/2019321572142Open ↗