2 Open Violations 1 unresolved · 1 paperwork only▸
DOB01/29/2014FAILURE TO CERTIFY CORRECTION ON IMMEDIATELY HAZARDOUS (CLASS 1) ECB VIOLATION
ECB11/01/2013PLUMBING WORK W/O A PERMIT:AT TIME OF INSPECTION ON 10/25/13 AT APPROX2:30PM, I OBSERVED INSTALLATION OF THREE(3)PC BATHROOM W/COLD WATER AND WASTE LINES IN CELLAR LEVEL.ALSO OBSERVED INSTALLATION OF KITCHEN SINothing owed — awaiting certificate of correction
Two family frame · 2,000 sf lot · 1.3 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.