← Back
Two family frame
883 71 STREET
BROOKLYN · Dyker Heights · BIN 3146792
💬 Discuss this project
1915Year Built
2Stories
B2Building Class
R4-1Zoning
2,480 sfGross Floor Area
2Units
Two family frame · 2,500 sf lot · 0.99 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
MOMENTUM SOLAR106/14/2024
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CUNNINGHAM ELECTRIC CORPElectrical103/22/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
MXV SIA LLC9281106/14/2024
Building Lifecycle
All (8)Filed (1)Permit Issued (1)Signed Off (1)Special Inspection (5)
05/14/2025
Signed off — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 25 Panels, 10.25 kW
B01066295-I1
06/18/2024
Permit issued — Solar
B01066295-I1-SL
06/14/2024
Filed — Alteration
Installation of solar panels; Rooftop, Railed, Grid tied, 25 Panels, 10.25 kW
B01066295-I1
06/13/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
Mina Makar
06/13/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
Mina Makar
06/13/2024
Special inspection requirement — Energy Code Compliance Inspections
Mina Makar
06/13/2024
Special inspection requirement — Final
Mina Makar
06/13/2024
Special inspection requirement — Air barrier - visual inspection
Mina Makar
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offMOMENTUM SOLAR06/18/2024
BIS—ISSUEDANKAR CONSTRUCTION CORP10/15/1999
2 projects · most recent 06/13/2024
General Wiring
FiledStatusContractorScope
06/13/2024CompleteISLAND ELECTRIC CORP—
01/14/2023CompleteCUNNINGHAM ELECTRIC CORPGeneral Wiring
▾Special Inspection Requirements (DOB NOW) — 5
DateRequirementInspectorRole
06/13/2024Fire-Resistant Penetrations and JointsMina Makarspecial
06/13/2024Structural Stability – Alterations of existing buildingsMina Makarspecial
06/13/2024Energy Code Compliance InspectionsMina Makarprogress
06/13/2024FinalMina Makarprogress
06/13/2024Air barrier - visual inspectionMina Makarenergy_progress
▾Documents — 7 on file (BIS + DOB NOW)
▸Plans & Drawings1
▸DOB NOWPlans/Sketch1
08/24/2026B01066295-I1Request digital key ↗
▸Seals & Professional Certifications4
▸DOB NOWProgress Inspector Seal & Signature2
08/22/2026B01066295-I1Open ↗
08/22/2026B01066295-I1Open ↗
▸DOB NOWDPL-1: Design Professional Seal & Signature1
08/13/2026B01066295-I1Open ↗
▸DOB NOWSpecial Inspector Seal & Signature1
08/22/2026B01066295-I1Open ↗
▸Environmental & Asbestos1
▸DOB NOWDEP ACP-5: Asbestos Assessment Report1
08/13/2026B01066295-I1Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B01066295-I1Open ↗