← Back
Elevator apt, semi-fireproof without stores
8831 20 AVENUE
BROOKLYN · Bath Beach · BIN 3328520
💬 Discuss this project
1948Year Built
6Stories
D1Building Class
R6Zoning
356,010 sfGross Floor Area
462Units
LL97 CoveredRent Stabilized16 Open Violations 15 unresolved · 1 paperwork only ▸FISP: SWARMPFDNY Report ↗
Elevator apt, semi-fireproof without stores · Owner of record: SHORE HAVEN APARTMENTS DEL LLC · 151,750 sf lot · 2.35 FAR built · Flood zone X
Locations of Work
No floor-level scope or drawing coverage on file for this building.
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
REVONA PROPERTIES407/08/2026
SHORE HAVEN APARTMENTS DEL503/22/2026
IRWIN DURBEN/AS TRUST203/22/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
JAMES A CLANCY212/16/2024
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
ARC DESIGN CONSULTING403/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CURRENT MECHS ELEC CONTSElectrical103/22/2026
BEST ENERGY POWER 2015 LLGeneral Contractor107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
ETRECTE LLC8116212/16/2024
Building Lifecycle
All (83)Filed (2)Permit Issued (1)Signed Off (1)Facade (FISP) (9)Violation (60)Special Inspection (10)
08/22/2026
Violation issued (HPD, open)
A
06/15/2026
Violation issued (HPD, closed)
C
04/29/2025
Violation issued (HPD, closed)
C
04/22/2025
Violation issued (HPD, closed)
B
04/22/2025
Violation issued (HPD, closed)
B
04/22/2025
Violation issued (HPD, closed)
B
01/03/2025
Signed off — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00974531-I1
01/03/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
01/03/2025
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
01/03/2025
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
01/03/2025
Special inspection requirement — Final
James Clancy
01/03/2025
Special inspection requirement — Air barrier - visual inspection
James Clancy
12/16/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00974531-P2
12/10/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
VYACHESLAV NECHAYEV
12/10/2024
Special inspection requirement — Structural Stability – Alterations of existing buildings
VYACHESLAV NECHAYEV
12/10/2024
Special inspection requirement — Energy Code Compliance Inspections
James Clancy
12/10/2024
Special inspection requirement — Final
James Clancy
12/10/2024
Special inspection requirement — Air barrier - visual inspection
James Clancy
08/21/2024
Violation issued (HPD, closed)
B
08/21/2024
Violation issued (HPD, closed)
C
08/21/2024
Violation issued (HPD, closed)
B
07/22/2024
Permit issued — Solar
B00974531-I1-SL
07/22/2024
Violation issued (HPD, closed)
C
07/17/2024
Filed — Alteration
INSTALLATION OF SOLAR PV SYSTEM ON THE EXISTING ROOFTOP. NO CHANGES TO THE EGRESS, USE OR OCCUPANCY.
B00974531-I1
04/08/2024
Violation issued (HPD, closed)
A
04/08/2024
Violation issued (HPD, closed)
B
04/08/2024
Violation issued (HPD, closed)
B
03/29/2024
Violation issued (HPD, closed)
A
03/29/2024
Violation issued (HPD, closed)
B
03/29/2024
Violation issued (HPD, closed)
B
03/29/2024
Violation issued (HPD, closed)
B
02/27/2023
Cycle 9 facade report signed — SWARMP
02/13/2023
Cycle 9 facade inspection completed
01/23/2023
Cycle 9 facade report submitted
11/04/2022
Violation issued (HPD, closed)
C
07/28/2022
Violation issued (HPD, closed)
B
07/28/2022
Violation issued (HPD, closed)
B
07/28/2022
Violation issued (HPD, closed)
B
04/01/2022
Violation issued (HPD, closed)
B
04/01/2022
Violation issued (HPD, closed)
C
04/01/2022
Violation issued (HPD, closed)
C
04/01/2022
Violation issued (HPD, closed)
C
10/17/2021
Violation issued (HPD, closed)
C
10/17/2021
Violation issued (HPD, closed)
C
10/17/2021
Violation issued (HPD, closed)
B
10/17/2021
Violation issued (HPD, closed)
B
10/17/2021
Violation issued (HPD, closed)
B
05/20/2021
Violation issued (HPD, closed)
A
05/20/2021
Violation issued (HPD, closed)
C
04/22/2021
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
06/10/2020
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
05/06/2019
Violation issued (DOB, closed)
V*-DOB VIOLATION - Resolved
03/22/2019
Violation issued (HPD, closed)
C
03/22/2019
Violation issued (HPD, closed)
B
04/18/2018
Violation issued (HPD, closed)
B
04/18/2018
Violation issued (HPD, closed)
A
04/18/2018
Violation issued (HPD, closed)
A
04/18/2018
Violation issued (HPD, closed)
B
04/18/2018
Violation issued (HPD, closed)
A
04/18/2018
Violation issued (HPD, closed)
C
Latest 60 of 83 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWSolarSigned-offBEST ENERGY POWER 2015 LL07/22/2024
BISFBRE-ISSUEDEMPIRE STATE FUEL CORP12/16/1993
3 projects · most recent 01/14/2024
General Wiring
FiledStatusContractorScope
01/14/2024CompleteBERTRAM ELECTRIC CONTNG—
02/20/2023CompleteCURRENT MECHS ELEC CONTSGeneral Wiring
09/01/2022CompleteTUXEDO ELEC'L CONTR'G INC—
▾Special Inspection Requirements (DOB NOW) — 10
DateRequirementInspectorRole
01/03/2025Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
01/03/2025Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
01/03/2025Energy Code Compliance InspectionsJames Clancyprogress
01/03/2025FinalJames Clancyprogress
01/03/2025Air barrier - visual inspectionJames Clancyenergy_progress
12/10/2024Fire-Resistant Penetrations and JointsVYACHESLAV NECHAYEVspecial
12/10/2024Structural Stability – Alterations of existing buildingsVYACHESLAV NECHAYEVspecial
12/10/2024Energy Code Compliance InspectionsJames Clancyprogress
12/10/2024FinalJames Clancyprogress
12/10/2024Air barrier - visual inspectionJames Clancyenergy_progress
▾Documents — 16 on file (BIS + DOB NOW)
▸Plans & Drawings2
▸DOB NOWPlans/Sketch2
08/24/2026B00974531-P2Request digital key ↗
08/24/2026B00974531-I1Request digital key ↗
▸Applications & Permits1
▸BISPLAN / WORK APPROVAL APPLICATION1
01/22/2024340906817Open ↗
▸Seals & Professional Certifications10
▸DOB NOWProgress Inspector Seal & Signature6
08/24/2026B00974531-P2Open ↗
08/24/2026B00974531-P2Open ↗
08/24/2026B00974531-P2Open ↗
Showing 3 of 6 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature2
08/24/2026B00974531-I1Open ↗
08/24/2026B00974531-P2Open ↗
▸DOB NOWSpecial Inspector Seal & Signature2
08/24/2026B00974531-P2Open ↗
08/23/2026B00974531-I1Open ↗
▸Environmental & Asbestos2
▸DOB NOWDEP ACP-5: Asbestos Assessment Report2
08/24/2026B00974531-I1Open ↗
08/24/2026B00974531-P2Open ↗
▸Approvals, Objections & Sign-offs1
▸DOB NOWUtility Company Final Acceptance Letter1
08/13/2026B00974531-I1Open ↗