← Back
Three families
886 SARATOGA AVENUE
BROOKLYN · Brownsville · BIN 3082205
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R6Zoning
2,560 sfGross Floor Area
3Units
Rent Stabilized25 Open Violations ▸FDNY Report ↗
Three families · Owner of record: SARATOGA REALTY NY LLC · 2,500 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Floor 224p · 1 filing · 20 docs
Floor 124p · 1 filing · 20 docs
Basement26p · 1 filing · 20 docs
Site & exterior9p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
OWNER OF 86 SARATAGA A103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/21/2025$930K—Private party → SARATOGA REALTY NY LLC$363/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
VASILIOS ARTEMIOU PE504/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC DESIGN FILE503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
CASA AZOUTR INCGeneral Contractor407/08/2026
QUALITY PIPING, INCFire Protection107/08/2026
NESS MECHANICAL P & H INCPlumbing107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF SERVICES CORP5616504/22/2025
Building Lifecycle
All (103)Filed (5)Permit Issued (4)Signed Off (4)Violation (2)Inspection (12)Objection (46)Special Inspection (30)
05/28/2026
Signed off — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-I1
04/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/28/2025
Signed off — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-S2
08/28/2025
Signed off — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-S3
06/26/2025
Signed off — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-S1
06/25/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
06/25/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
06/25/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
06/25/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
06/25/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
06/23/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/17/2025
Objection resolved — Addressed
06/13/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
06/11/2025
Inspection — Fail-Final CND-Occupancy Inspection
Fail
View inspection ↗
06/06/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
06/06/2025
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
06/04/2025
Objection resolved — Addressed
05/20/2025
Objection raised — Scope
05/15/2025
Objection raised — Energy
05/15/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/12/2025
Objection resolved — Addressed
05/07/2025
Objection raised — Cost
05/07/2025
Objection raised — Structural
05/07/2025
Objection raised — Inspections
04/22/2025
Filed — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-P2
04/02/2025
Inspection — Certified Sprinkler-SP-Fixtures-Finish
Certified
View inspection ↗
03/31/2025
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
03/31/2025
Special inspection requirement — Maintenance information
FAHAD FATEH
03/31/2025
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
03/31/2025
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
03/31/2025
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
03/29/2025
Inspection — Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic Test
Certified
View inspection ↗
03/28/2025
Inspection — Certified Gas-Gas-Piping-Roughing
Certified
View inspection ↗
03/28/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Roughing
Certified
View inspection ↗
03/17/2025
Inspection — Certified Water and Sanitary-WS-Sanitary Piping-Underground
Certified
View inspection ↗
02/18/2025
Permit issued — General Construction
B01058217-I1-GC
02/14/2025
Permit issued — Mechanical Systems
B01058217-S1-MS
02/11/2025
Permit issued — Plumbing
B01058217-S2-PL
02/07/2025
Permit issued — Sprinklers
B01058217-S3-EW-SP
11/14/2024
Filed — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-S2
11/14/2024
Filed — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-S3
11/14/2024
Filed — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-S1
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/14/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
11/14/2024
Special inspection requirement — Maintenance information
FAHAD FATEH
11/14/2024
Special inspection requirement — HVAC-R and service water heating system controls
FAHAD FATEH
11/14/2024
Special inspection requirement — HVAC-R and service water heating equipment
FAHAD FATEH
11/14/2024
Special inspection requirement — Permanent certificate
FAHAD FATEH
11/14/2024
Special inspection requirement — Ventilation and air distribution system
FAHAD FATEH
11/14/2024
Special inspection requirement — HVAC-R and service water piping design and insulation
FAHAD FATEH
11/14/2024
Special inspection requirement — Fire-Resistant Penetrations and Joints
FAHAD FATEH
11/14/2024
Special inspection requirement — Post-installed Anchors
FAHAD FATEH
08/15/2024
Objection raised — Scope
08/15/2024
Objection resolved — Addressed
08/05/2024
Objection raised — Scope
08/05/2024
Objection resolved — Addressed
08/05/2024
Objection raised — Scope
08/05/2024
Objection resolved — Addressed
Latest 60 of 103 events.
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCASA AZOUTR INC02/18/2025
DOB NOWMechanical SystemsSigned-offCASA AZOUTR INC02/14/2025
DOB NOWPlumbingSigned-offNESS MECHANICAL P & H INC02/11/2025
DOB NOWSprinklersSigned-offQUALITY PIPING, INC02/07/2025
1 project · most recent 04/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/22/2025Signed-offNESS MECHANICAL P & H INCGas, Water/Sanitary
1 project · most recent 01/22/2025
General Wiring
FiledStatusContractorScope
01/22/2025CompleteS&R ELECTRICAL & MECHANICGeneral Wiring
▾Field Inspections (DOB CAP) — 12
DateTypeResultReport
04/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
04/02/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
03/29/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
03/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
06/25/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/25/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
06/25/2025Maintenance informationFAHAD FATEHenergy_progress
06/25/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/25/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/31/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/31/2025Maintenance informationFAHAD FATEHenergy_progress
03/31/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/31/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/31/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/14/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/14/2024Post-installed AnchorsFAHAD FATEHspecial
11/14/2024Maintenance informationFAHAD FATEHenergy_progress
11/14/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/14/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/14/2024Permanent certificateFAHAD FATEHenergy_progress
11/14/2024Ventilation and air distribution systemFAHAD FATEHenergy_progress
11/14/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/14/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/14/2024Post-installed AnchorsFAHAD FATEHspecial
07/10/2024Permanent certificateFAHAD FATEHenergy_progress
06/17/2024Sprinkler SystemsFAHAD FATEHspecial
06/17/2024FinalFAHAD FATEHprogress
06/17/2024Mechanical SystemsFAHAD FATEHspecial
05/29/2024Fenestration air leakageFAHAD FATEHenergy_progress
Latest 25 of 38.
▾Documents — 31 on file (BIS + DOB NOW)
▸Plans & Drawings5
▸DOB NOWPlans/Sketch5
08/23/2026B01058217-S1Request digital key ↗
08/23/2026B01058217-S3Request digital key ↗
08/23/2026B01058217-S2Request digital key ↗
Showing 3 of 5 on file for this type
▸Zoning, Tax Lot & Property Records2
▸DOB NOWHouse Number Verification: TOPO Stamp2
08/14/2026B01058217-I1Open ↗
08/13/2026B01058217-I1Open ↗
▸Seals & Professional Certifications17
▸DOB NOWProgress Inspector Seal & Signature7
09/01/2026B01058217-S1Open ↗
09/01/2026B01058217-S1Open ↗
08/26/2026B01058217-S2Open ↗
Showing 3 of 7 on file for this type
▸DOB NOWSpecial Inspector Seal & Signature5
09/01/2026B01058217-S1Open ↗
09/01/2026B01058217-S3Open ↗
08/26/2026B01058217-S2Open ↗
Showing 3 of 5 on file for this type
▸DOB NOWDPL-1: Design Professional Seal & Signature5
08/23/2026B01058217-I1Open ↗
08/23/2026B01058217-P2Open ↗
08/23/2026B01058217-S3Open ↗
Showing 3 of 5 on file for this type
▸Environmental & Asbestos5
▸DOB NOWDEP ACP-5: Asbestos Assessment Report5
08/23/2026B01058217-S3Open ↗
08/23/2026B01058217-S2Open ↗
08/23/2026B01058217-S1Open ↗
Showing 3 of 5 on file for this type
▸Other Documents2
▸DOB NOWFinal Survey1
08/14/2026B01058217-I1Open ↗
▸DOB NOWProperty Ownership Certification1
08/14/2026B01058217-I1Open ↗