← Back
BuildNYC
Three families
886 SARATOGA AVENUE
BROOKLYN · Brownsville · BIN 3082205
💬 Discuss this project
1901Year Built
2Stories
C0Building Class
R6Zoning
2,560 sfGross Floor Area
3Units
Rent Stabilized25 Active Violations ▸FDNY Report ↗
Three families · Owner of record: Saratoga Realty NY · 2,500 sf lot · 1.02 FAR built · Flood zone X
Locations of Work
ArchitectureMechanicalPlumbingFire Protection
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
RoofRenovation and conversion to 10 dwelling units3p · 1 filing · 20 docs
Floor 2Unit 2A21p · 1 filing · 20 docs
Floor 1Renovation and conversion to 10 dwelling units21p · 1 filing · 20 docs
BasementRenovation and conversion to 10 dwelling units23p · 1 filing · 20 docs
Site & exteriorRenovation and conversion to 10 dwelling units8p · 1 filing · 20 docs
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Owner of 86 Sarataga A103/22/2026
▾Sales History (ACRIS)
DatePriceUnitSeller → Buyer$/sf
01/21/2025$930K—Private party → SARATOGA REALTY NY LLC$363/sf building
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
Vasilios Artemiou PE504/22/2025
▾Filing Representatives (Expediters)
RepresentativeFilingsMost Recent
NYC Design File503/21/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Casa AzoutrGeneral Contractor303/21/2026
Casa Azoutrspecialty_contractor107/08/2026
Ness Mechanical P & HPlumbing107/08/2026
Quality PipingFire Protection107/08/2026
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
HRF Services5616504/22/2025
Building Lifecycle
05/28/2026
Signed off — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-I1
04/16/2026
Inspection — Pass-Final CND-Occupancy Inspection
Pass
View inspection ↗
08/28/2025
Signed off — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-S3
08/28/2025
Signed off — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-S2
06/26/2025
Signed off — Alteration CO
Filing SP plans subsequent to job number B01058217-I1
B01058217-S1
72 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOWGeneral ConstructionPermit IssuedCasa Azoutr02/18/2025
DOB NOWMechanical SystemsSigned-offCasa Azoutr02/14/2025
DOB NOWPlumbingSigned-offNess Mechanical P & H02/11/2025
DOB NOWSprinklersSigned-offQuality Piping02/07/2025
1 project · most recent 04/22/2025
Gas Water/Sanitary
FiledStatusContractorScope
04/22/2025Signed-offNess Mechanical P & HGas, Water/Sanitary
1 project · most recent 01/22/2025
General Wiring
FiledStatusContractorScope
01/22/2025CompleteS&R ElectricalGeneral Wiring
▾Field Inspections (DOB CAP) — 10
DateTypeResultReport
04/16/2026Pass-Final CND-Occupancy InspectionPassView ↗
06/23/2025Pass-Final CND-Occupancy InspectionPassView ↗
06/13/2025Certified Sprinkler-SP-Fixtures-FinishCertifiedView ↗
06/11/2025Fail-Final CND-Occupancy InspectionFailView ↗
06/06/2025Certified Sprinkler-SP-Piping Dry/Wet-Hydrostatic TestCertifiedView ↗
06/06/2025Pass-Final CND-Occupancy InspectionPassView ↗
03/28/2025Certified Gas-Gas-Piping-RoughingCertifiedView ↗
03/28/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Sanitary Piping-RoughingCertifiedView ↗
03/17/2025Certified Water and Sanitary-WS-Sanitary Piping-UndergroundCertifiedView ↗
▾Special Inspection Requirements (DOB NOW) — 38
DateRequirementInspectorRole
06/25/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
06/25/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
06/25/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
06/25/2025Maintenance informationFAHAD FATEHenergy_progress
06/25/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/31/2025HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
03/31/2025Maintenance informationFAHAD FATEHenergy_progress
03/31/2025HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
03/31/2025HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
03/31/2025Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/14/2024Post-installed AnchorsFAHAD FATEHspecial
11/14/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
11/14/2024Post-installed AnchorsFAHAD FATEHspecial
11/14/2024Maintenance informationFAHAD FATEHenergy_progress
11/14/2024HVAC-R and service water heating system controlsFAHAD FATEHenergy_progress
11/14/2024HVAC-R and service water heating equipmentFAHAD FATEHenergy_progress
11/14/2024Permanent certificateFAHAD FATEHenergy_progress
11/14/2024Ventilation and air distribution systemFAHAD FATEHenergy_progress
11/14/2024HVAC-R and service water piping design and insulationFAHAD FATEHenergy_progress
11/14/2024Fire-Resistant Penetrations and JointsFAHAD FATEHspecial
07/10/2024Permanent certificateFAHAD FATEHenergy_progress
06/17/2024Sprinkler SystemsFAHAD FATEHspecial
06/17/2024Mechanical SystemsFAHAD FATEHspecial
06/17/2024FinalFAHAD FATEHprogress
05/29/2024Fire-Resistance Rated ConstructionFAHAD FATEHprogress
Latest 25 of 38.
31 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account