← Back
BuildNYC
Condo, residential tower (mixed-use, multi-family elevator) [derived]
886 WESTCHESTER AVENUE
BRONX · BIN 2118990
💬 Discuss this project
2008Year Built
8Stories
RMBuilding Class
R7-1Zoning
95,166 sfGross Floor Area
86Units
LL97 CoveredRent Stabilized20 Active Violations ▸FISP: SWARMP
Condo, residential tower (mixed-use, multi-family elevator) [derived] · 15,815 sf lot · 6.02 FAR built · Flood zone X
Locations of Work
Names shown beside floors are taken automatically from the text of filed documents and may be incomplete or wrong.
Roof1 filing
Floor 11 filing
▾Owner History (Filing Record)
Companies and organizations named on filings. Individual owners are not shown.
OwnerFilingsMost Recent
Hewitt Westchester3703/21/2026
The Arker403/21/2026
▾Design Consultants (Architect / Engineer of Record)
FirmFilingsMost Recent
The Downtown105/19/2026
Palette Architecture203/18/2026
▾Contractors (License-Anchored)
FirmTradeRolesMost Recent
Coastal BuildersGeneral Contractor603/21/2026
Maxx ConstructionGeneral Contractor203/21/2026
Testa ElectricElectrical203/21/2026
Richmond ElectricElectrical203/22/2026
Chateau GCGeneral Contractor103/21/2026
GuayacosGeneral Contractor103/21/2026
MC O ContractingGeneral Contractor103/21/2026
Aranda Plumbing & HeatingPlumbing103/21/2026
Nautica Plbing HeatingPlumbing103/21/2026
RO-Sal Plumbing & HeatingPlumbing103/21/2026
Nicholas AzadianElectrical103/21/2026
Cottam Heating Air Condspecialty_contractor107/15/2026
Peter MillerElectrical103/21/2026
3rd Ave PlumbingPlumbing108/10/1992
All-SafeGeneral Contractor110/23/2009
Disano DemolitionGeneral Contractor211/28/2008
HksconstructionGeneral Contractor109/06/2016
Master Fire Prev. SystemsFire Protection108/22/2012
M.S.S. ConstructionGeneral Contractor112/17/2008
NYC Sprinkler SystemsFire Protection108/07/2012
▾Special Inspection Agencies
AgencyLicense #FilingsMost Recent
AG Engineering8899105/19/2026
Downtown Engineers9711105/19/2026
Building Lifecycle
02/20/2027
Facade inspection report due (FISP Cycle 10, sub-cycle A)
The filing window opened 02/21/2025. 1 Cycle 10 filing on record, latest 10/29/2025, status Swarmp
11/01/2026
Permit expired, never signed off — Mechanical Systems
The city's record still shows this permit as issued, with no sign-off on its filing
X01380866-I1-MS
07/15/2026
§ 27-2026 ADM CODE RESET, SO AS TO SECURE A PROPER AND TIGHT CONNECTION, THE WATER CLOSET BOWL IN THE BATHROOM LOCATED AT APT 5E, 5th STORY, 2nd…
HPD violation · closed
07/14/2026
Permit issued — Mechanical Systems
X01380866-I1-MS
06/29/2026
HMC ADM CODE: § 27-2017.4 ABATE THE INFESTATION CONSISTING OF ROACHES IN THE ENTIRE APARTMENT LOCATED AT APT 5E, 5th STORY, 2nd APARTMENT FROM WEST…
HPD violation · closed
235 history events on file for this building. Sign in free to see the full history. Sign in · Create account
Permit / Filing Register
SourceWork TypeStatusApplicantIssued
DOB NOW—Cottam Heating & Air Condit—
BIS—Aranda Plumbing & Heating—
BIS—Guayacos—
BIS—Guayacos—
BIS—HKS Construction—
BIS—Master Fire Systems—
BIS—Full Capacity Fire—
BIS—Arista Plumbing & Heating—
BIS—Chateau GC—
BIS—RO-Sal Plumbing & Heating—
BIS—MC & O Contracting—
BIS—Coastal Builders—
BIS—Coastal Builders—
BIS—RO-Sal Plumbing & Heating—
BIS—MC & O Contracting—
BIS—Coastal Builders—
BIS—All-Safe—
BIS—RO-Sal Plumbing & Heating—
BIS—RO-Sal Plumbing & Heating—
BIS—Maxx Construction—
BIS—Maxx Construction—
BIS—Coastal Builders—
BIS—Coastal Builders—
BIS—Coastal Builders—
BIS—Coastal Builders—
BIS—Maxx Construction—
BIS—Maxx Construction—
BIS—M.S.S. Construction—
BIS—Disano Demolition—
BIS—Disano Demolition—
BIS—A & N Control Services—
BIS—Express Plumbing Sewr and WTR—
BIS—Glean Construction—
Nothing on file for this building.
Nothing on file for this building.
504 filed documents on file for this building. Sign in free to see the full history. Sign in · Create account